Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹6.9 LAdmitted-Finance 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | ₹6.9 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | ELECTRO POWER INDUSTRIES L2 | META ELECTRIC L1 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00 | Dismantling of core & winding from the transformer Tank & cleaning of all parts of the Transformer properly | 1 | LS | 14,000 ₹14,000 | 12,576 ₹12,576 |
| 3.00 | Supply of new Electrolytic grade copper conductor for 3 limb of Secondary Coil | 465 | Kg | 1,050 ₹4,88,250 | 918.12 ₹4,26,925.8 |
| 4.00 | Insulation of bare copper conductor of secondary by double coated manila paper | 1 | LS | 100 ₹100 | 31,440 ₹31,440 |
| 5.00 | Formation of coils after rewinding of primary & Secondary coil | 1 | LS | 25,000 ₹25,000 | 32,698 ₹32,698 |
| 6.00 | Fitting of core channel, primary & secondary coils & winding into the transformer tank. | 1 | LS | 35,000 ₹35,000 | 11,320 ₹11,320 |
| 7.00 | Cost of brazing with supply of rupaton rod, oxygen, DA for brazing of all the primary & secondary connection. | 1 | LS | 20,000 ₹20,000 | 15,100 ₹15,100 |
| 8.00 | Repairing of oil leakage from transformer tank and radiator fitting. | 1 | LS | 22,000 ₹22,000 | 10,500 ₹10,500 |
| 9.00 | De-hydration and filtration of transformer oil | 1,200 | Ltr | 11 ₹13,200 | 10.48 ₹12,576 |
| 10.00 | Testing of Transformer and complete the entire job. | 1 | LS | 50,000 ₹50,000 | 7,600 ₹7,600 |
Tender Value
₹4.5 L
EMD Value
₹5,700
Closing Date
5 Jan 2026, 9:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
conversion of 11kV/6.6 kV, 2MVA transformer to 11kV/3.3kV. 2MVA for supplying power to LHCM-1 package at Shyamsundarpur Colliery under Bankola Area(Retender)
2025_ECL_350089_1
ECL/GM/BA/E TENDER/25-26/ENM/62(R01) Dt 26.12.2025
Open Tender
Electrical and Maintenance Works
20 days
Shyamsundarpur Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,700
15 Jan 2026
26 Dec 2025
6 Jan 2026
26 Dec 2025
5 Jan 2026
26 Dec 2025
26 Dec 2025 - 29 Dec 2025
Amount
Item Description/ Heading
Dismantling of core & winding from the transformer Tank & cleaning of all parts of the Transformer properly
Supply of new Electrolytic grade copper conductor for 3 limb of Secondary Coil
Insulation of bare copper conductor of secondary by double coated manila paper
Formation of coils after rewinding of primary & Secondary coil
Fitting of core channel, primary & secondary coils & winding into the transformer tank.
Cost of brazing with supply of rupaton rod, oxygen, DA for brazing of all the primary & secondary connection.
Repairing of oil leakage from transformer tank and radiator fitting.
De-hydration and filtration of transformer oil
Testing of Transformer and complete the entire job.
Painting the outer body of transformer by one coat of primary and 2 coat metallic paint
Transporting & handling charges both way.
Total impact of GST for the purpose of CTC
ELECTRO POWER INDUSTRIES (BID ID -1208688)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 1.25 MB
Tendernotice_3.pdf
PDF • 0.19 MB
BOQ_362839.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid