| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.6 LAdmitted-Finance | ₹43.6 L | L1 | Admitted-Finance |
| 2 | L2₹44.2 LAdmitted-Finance 20 RAJA STREET PALAYAMKOTTAI TIRUNELVELI 627002 | TIRUNELVELI | TAMIL NADU | 627002 | ₹44.2 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MARIDURAI AND CO L2 | MPR Infrastructure Service L1 |
|---|---|---|---|---|---|
| 1.00Improvement of Mini Stadium in Sivalarkulam Panchayat in Alangulam Panchayat union in Tenkasi District under SDAT 2025-26 Package No.01 | |||||
| 2.00Renovation Toilet and Gallery | |||||
| 3.00 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete | 218.4 | sqm | 215 ₹46,956 | 211 ₹46,082.40 |
| 4.00 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. | 254.2 | sqm | 270 ₹68,634 | 268 ₹68,125.60 |
| 5.00 | Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. | 14.82 | sqm | 160 ₹2,371.20 | 156 ₹2,311.92 |
| 6.00 | Fabrication and supply of Mild Steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete. | 1 | Nos | 5,300 ₹5,300 | 5,200 ₹5,200 |
| 7.00Construction of Gallery Roof shed | |||||
| 8.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 25.92 | Cum | 270 ₹6,998.40 | 263 ₹6,816.96 |
| 9.00 | Supplying and Delivery of MS Pipe,MS Hollow Pipe,ISMC Box,MS angle etc., complete. | 5,400 | Kg | 55 ₹3.0 L | 53 ₹2.9 L |
| 10.00 | Labour charges for Cutting,bending ,laying,welding of MS Pipe,MS Hollow Pipe,ISMC Box,MS angle etc., complete. | 5,400 | Kg | 67 ₹3.6 L | 65 ₹3.5 L |
Tender Value
₹55 L
EMD Value
₹55,000
Closing Date
3 Mar 2026, 3:00 pmClosed
Project Director
DRDA,Tenkasi
Improvement of Mini Stadium in Sivalarkulam Panchayat in Alangulam Panchayat union in Tenkasi District under SDAT 2025-26 Package No.01
2026_RDTN_661382_1
COLRD/551/2026A2 Dt.17.02.2026 SDAT 2025-26
Open Tender
Civil Works
90 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹55,000
DRDA,Tenkasi
11 Mar 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
27 Feb 2026
Improvement of Mini Stadium in Sivalarkulam Panchayat in Alangulam Panchayat union in Tenkasi District under SDAT 2025-26 Package No.01
Renovation Toilet and Gallery
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete.
Fabrication and supply of Mild Steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Construction of Gallery Roof shed
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and Delivery of MS Pipe,MS Hollow Pipe,ISMC Box,MS angle etc., complete.
Labour charges for Cutting,bending ,laying,welding of MS Pipe,MS Hollow Pipe,ISMC Box,MS angle etc., complete.
Supplying and fixing of 0.47mm thick Galvalume sheet on Side Cladding with necessary framing supports with neat alignment and necessary rubber beading etc all complete as directed by the departmental officers
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Construction of New Arch
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
For first depth of 2m
For Second depth of 1m
For Corewall
Supplying and filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Supplying and filling with excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
1.50m to 4.50m Below GL
0.00m to 1.50m Below GL
Centering charges for RCC works including all cost and conveyance all materials to site etc., complete.
PLANE SURFACE:-
Below GL
Above GL (+5.300 - +6.300m)
Above GL (+6.300 - +7.300m)
SQUARE COLUMN:-
Below GL
Above GL (0.000 - +3.300m)
Above GL (+3.300 - +4.300m)
Above GL (+4.300 - +5.300m)
Above GL (+5.300 - +6.300m)
Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering.
1.50m to 4.50m Below GL
0m to 1.50m Below GL
Above GL (0.000 - +4.500m)
Above GL (+4.500 - +7.320m)
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete
Plastering with CM 1:3 mix using to 10mm thick including all cost and conveyance of all materials and all labour charges etc., complete.
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete.
Exterior Emulsion painting two coats with best approved quality and colour emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Construction of Kerb Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Providing Volley Ball Ground
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. PWD SOR 2025-26, Unique Code W-0085, Page-32.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and Filling with Red gravel including cost and conveyance of all materials and all labour charges and all other incidental charges etc., complete.
Cement concrete 1:2:4 mix using 20m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges etc complete
Providing Foot Ball
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. PWD SOR 2025-26, Unique Code W-0085, Page-32.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:2:4 mix using 20m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges etc complete
Baseket Ball Ground
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Providing BT Roads
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications.
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Premeasurement for Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Premeasurement for Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I . Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Providing Road furnitures
a. 60 cm Equilateral triangle cautionary signboard
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.40 MB
Biddoc.pdf
Tender Documents • 0.99 MB
BOQ_793826.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid