Loading…
Loading…
Tender Value
₹34 L
EMD Value
₹68,000
Closing Date
16 Sept 2026, 6:00 pmDue tomorrow
GE Hisar
GE Hisar
ADDN/ ALTERATION INCLUDING SUNKEN TREATMENT OF BATHROOM OF BLDG NO P-1015 AND P-1016 OF 83 ARMD REGT UNDER GE HISAR AT MIL STN HISAR
2026_MES_786687_1
GE(H)-21/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE Hisar
As per NIT
6 documents required · 6 mandatory
₹500
GE Hisar
₹68,000
Yes
28 Aug 2026
28 Aug 2026
18 Sept 2026
28 Aug 2026
16 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roof tiles, single layer on roofs complete all as speified & directed. | 744 | SQM | - | - |
| 2 | Demolition of mud in roofs, any thicknes, including plastering and leeping (whether full thickness removed or only or part thereof) complete all as speified & directed. | 74.4 | CUM | - | - |
| 3 | M&L for PCC 1:2:4 (Type B1 using 20 mm graded aggregate) levelling course average thick 40 mm, to match the undulations of roof complete all as specified and directed. | 744 | SQM | - | - |
| 4 | M&L 10 mm thick cement screed in CM 1:3 mixed with water proofing compound of approved make over RCC roof slab/concrete surface/brick tiles and vertical surface, finished even and smooth by using steel trowel complete all as specified and directed. (Note :- WPC shall be measured and paid separately.) | 744 | SQM | - | - |
| 5 | M&L for APP based polymeric membrane minimum weighing 3 Kg/Sqm and minimum 3mm thick reinforced with polyster non woven fabric (wt not less than 150 gms /sqm) laid over primed surface including bituminous primer conforming to IS-3384 applied @ 0.3 ltr/Sqm by forced application method complete all as specified and directed and described as under.
Four course roof treatment consists of as under :-
(a) Applying one coat of bituminous primer conforming to IS-3384 @ 0.30 Ltr per sqm.
(b) Laying of APP based membrane as specified thickness and weight.
(c) Applying one coat of bitumin grade 85/25 @ 1.2 Kg/Sqm.
(d) Applying two coat of aluminium paint @ 200ml/sqm.
Note :- APP membrane work shall be excuted by athorised applicator of APP as approved by GE. | 744 | SQM | - | - |
| 6 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc. laid and beeded and pointed any cement mortar complete all as specified and directed. | 8 | X SQM | - | - |
| 7 | M&L for Machine cut kota stone slab flooring 20-25mm thick over cement screed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing over and including 20 mm thick screed beed in CM 1:6 complete all as specified and directed. | 80 | SQM | - | - |
| 8 | M&L for Kota stone slab 20-25 mm thick in riser of steps, skirting, dado and pillar laid over cement screed and jointed over and including provision of 10 mm thick backing coat in CM 1:4 complete all as specified and directed. | 25 | SQM | - | - |
| 9 | Taking up or down 15mm bore steel / composite / UPVC tubing and connection from any position concealed / exposed including cleaning for refixing or removal to store complete all as specified and directed. | 209 | RM | - | - |
| 10 | S&F 15 mm dia steel water GI tube medium grade with all fittings / connections & MS clamps / clips and necessary screwing as reqd and fixed with or without concealed to walls & surface of roof slab with and including making good to required surfaces by using white cement complete all as specified and directed. | 90 | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TENDERGE21.pdf
Tender Documents • 1.86 MB
BOQ_881597.xls
BOQ • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .