Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.8 L+₹86,908.01 (9.68%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹10.1 L+₹1.1 L (12.8%)Admitted-Finance 345 DOGRA HALL EXCHANGE ROAD REHARI NEAR SHRI RAM PALACE JAMMU JAMMU KASHMIR 180001 | JAMMU | JAMMU AND KASHMIR | 180001 | L3 | Admitted-Finance | ||
| 4 | L4₹10.1 L+₹1.2 L (12.9%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹10.1 L+₹1.2 L (13.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹15.6 L
EMD Value
₹31,200
Closing Date
16 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er. Sandeep Gupta
XEN
Development of Parking Space at Directorate of Animal Husbandry Talab Tillo Jammu.
2026_PWDJK_330447_1
eNIT No. 88 of 2026-2027 Dated 05-11-2026
Open Tender
Civil Works
Percentage
60 days
Jammu
BOQ
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division
₹31,200
Yes
25 Nov 2026
5 Nov 2026
17 Nov 2026
5 Nov 2026
16 Nov 2026
5 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 2.3 | cum | 1,458.45 | ₹3,354.44 |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 600 | Sqm | 12.49 | ₹7,494 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected:1 meter from cutting edge All Kinds of soils | 50.4 | cum | 479.3 | ₹24,156.72 |
| 4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 4.01 | A.)1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 5.52 | cum | 4,826.5 | ₹26,642.28 |
| 4.02 | B.) 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm Nominal size) | 8.93 | cum | 5,733.6 | ₹51,201.05 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level ) 1:1.5 :3 | 15.99 | cum | 7,788.4 | ₹1,24,536.52 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.16 | cum | 9,821.85 | ₹21,215.2 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,816 | kg | 123.2 | ₹2,23,731.2 |
| 8Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1121137.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .