Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance NO 163 LAKSHMI AMMAN KOIL ST NEITHAVAYAL MINJUR PONNERI | PONNERI | TIRUVALLUR | TAMIL NADU | ₹5.9 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹6.0 LRejected-Finance | ₹6.0 L | L2 | Rejected-Finance L2 BIDDER |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | V S S Enterprises L1 | S ARUMUGAM L2 |
|---|---|---|---|---|---|
| 1.001. PROVIDING CULVERT AT THATHAIMANJI COLONY IN THATHAIMANJI PANCHAYAT IN MINJUR PANCHAYAT UNION UNDER PMAGY /2025 - 2026/ RD/TVLR/MJR04 | |||||
| 2.00CULVERT | |||||
| 3.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. | 81.55 | SQ.M | 263.78 ₹21,511.26 | 263.78 ₹21,511.26 |
| 4.00 | Supplying and Filling foundation and basement with filling M. sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 6.34 | CUM | 2,275 ₹14,423.50 | 2,275 ₹14,423.50 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completed. | 4.66 | CUM | 6,095 ₹28,402.70 | 7,500 ₹34,950 |
| 6.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completed. | 42.32 | CUM | 6,856.37 ₹2.9 L | 6,856.37 ₹2.9 L |
| 7.00Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., completed. | |||||
| 8.00 | Sub Structure | 45.32 | SQ.M | 547.5 ₹24,812.70 | 547.5 ₹24,812.70 |
| 9.00 | Super Structure | 63.89 | SQ.M | 1,095 ₹69,959.55 | 1,095 ₹69,959.55 |
| 10.00 | Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc completed for 10 cum | 2.95 | CUM | 9,855.01 ₹29,072.28 | 9,855.01 ₹29,072.28 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
5 Feb 2026, 5:00 pmClosed
BDO (VP) MINJUR BLOCK
MINJUR BDO OFFICE
PROVIDING CULVERT AT THATHAIMANJI COLONY IN THATHAIMANJI PANCHAYAT IN MINJUR
2026_RDTN_649637_2
880/2023/A7
Open Tender
Civil Works
180 days
MINJUR
CLASS V AND ABOVE
4 documents required · 4 mandatory
₹0
₹6,000
Yes
26 Feb 2026
31 Jan 2026
5 Feb 2026
31 Jan 2026
5 Feb 2026
31 Jan 2026
1. PROVIDING CULVERT AT THATHAIMANJI COLONY IN THATHAIMANJI PANCHAYAT IN MINJUR PANCHAYAT UNION UNDER PMAGY /2025 - 2026/ RD/TVLR/MJR04
CULVERT
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Supplying and Filling foundation and basement with filling M. sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completed.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completed.
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., completed.
Sub Structure
Super Structure
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc completed for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_778840.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
TenderdocumentMJRO4.pdf
Tender Documents • 0.57 MB
BOQ_778840.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid