| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance AT SANTRILOCHAMPUR PO BAIDYARAJPUR DIST JAJPUR PIN 755007 | BAIDYARAJPUR | JAJPUR | ODISHA | 755007 | -18.77% | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹14.2 L (5.87%)Admitted-Finance | -14.00% | ₹2.6 Cr+₹14.2 L (5.87%) | L2 | Admitted-Finance |
| 3 | L3₹2.8 Cr+₹39.7 L (16.5%)Admitted-Finance AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | -5.40% | ₹2.8 Cr+₹39.7 L (16.5%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 Cr+₹55.8 L (23.1%)Admitted-Finance | +0.00% | ₹3.0 Cr+₹55.8 L (23.1%) | L4 | Admitted-Finance |
| 5 | L4₹3.0 Cr+₹55.8 L (23.1%)Admitted-Finance | +0.00% | ₹3.0 Cr+₹55.8 L (23.1%) | L4 | Admitted-Finance |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
22 May 2026, 5:00 pmClosed
CCE Dhenkanal R and B Circle
CCE Dhenkanal R and B Circle
Construction of 100 seated Girls Hostel of Baba Bhairabananda Mahavidyalaya, Chandikhole, Dist-jajpur for the project sanctioned for the financial year 2024-25 and 2025-26
2026_EICCL_128968_1
CCE DKL R and B/17-2025-26
Open Tender
Civil Works - Buildings
Percentage
210 days
Choudwar
Please refer tender documents
2 documents required · 2 mandatory
₹10,000
₹3.0 L
Yes
17 Jun 2026
8 May 2026
25 May 2026
8 May 2026
22 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS:-
Earth work excavation in foundation trenches in Hard soil including dressing and levelling the bed up to required depth and depositing the excavated materials at places away from work site within 50mtr initial lead and 1.5mtr initial lifts T&P shoring shuttering dewatering if required etc. complete as per direction of the Engineer-in-charge. | 619.58 | Cum | 276.9 | ₹1,71,561.7 |
| 2 | Filling foundation and plinth with excavated earth ramming etc complete as per approved drawing and technical specifications in all respect & as per direction of the Engineer-in-Charge. | 278.79 | Cum | 153.8 | ₹42,877.9 |
| 3 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | 187.57 | Cum | 660.6 | ₹1,23,908.74 |
| 4 | Providing & applying of pre constructional anti-termite treatment by drilling 12mm dia holes at distance of 30cm @ junction of wall & floor about 300mm apart deep enough to reach the soil below & chemical emulsion (IMIDACHLOPRIED 30.5SC mixed with 47.5ltr water) pumped these holes to soak the soil @ 1 ltr solution of each hole as per manufactures specification & the holes should be pluged the filling materials including cost of all materials, labour,conveyance, T&P , all taxes and hire charges of machinaries as per direction of Engineer-in-charge.(make-premise-BAYER,Paxton-FMC,ozie-KALYANI) | 466 | Sqm | 104.5 | ₹48,697 |
| 5 | PCC WORK:- Providing and lying Plain Cement Concrete of proportion (1:3:6) in foundation & floor using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | 177.75 | Cum | 5,960.4 | ₹10,59,461.1 |
| 6 | cement concrete M-15 grade using 20mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering, curing etc. complete including cost, conveyance, royalties of all materials with labour,labour cess and T&P etc. required for the work complete as per the direction of the Engineer-in-charge. | 27.17 | Cum | 5,632.8 | ₹1,53,043.18 |
| 7BRICK WORK :- Providing and laying Brick Masonry work in Foundation & Plinth using Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance + 2 % confirming to IS 12894 and IS 2212 in cement mortar (1:6) affter immersing the bricks for minimum 6 hours in water before use, with all necessary projections, splays cutting, circular moulding, corbelling, etc. as per the drawings including the cost of all materials, cost of all labour, conveyance, royalties, loading, unloading, scaffolding, staging, watering and curing, sundries, T&P, etc. complete as per the direction of the Engineer-in-charge. | |||||
| 7.1 | (a)Ground Floor | 19.85 | Cum | 5,411.9 | ₹1,07,426.22 |
| 8Providing and laying of Full Brick Masonry work in Superstructure using Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance + 2 % confirming to IS 12894 and IS 2212 in cement mortar (1:6) affter immersing the bricks for minimum 6 hours in water before use, with all necessary projections, splays cutting, circular moulding, corbelling, etc. as per the drawings including the cost of all materials, cost of all labour, conveyance, royalties, loading, unloading, scaffolding, staging, watering and curing, sundries, T&P, etc. complete as per the direction of the Engineer-in-charge. | |||||
| 8.1 | (a)Ground Floor | 86.21 | Cum | 5,450.2 | ₹4,69,861.74 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
DTCN_Bhairabananda.pdf
Tender Documents • 3.09 MB
BOQ_590182.xls
BOQ • 3.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .