Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.3 LAccepted-AOC HOUSE NO 803 WARD NO 14 SORIAN KUAN JUNDLA GATE KARNAL HARYANA PIN CODE 132001 | KARNAL | KARNAL | HARYANA | 132001 | 1 | Accepted-AOC ok | |
| 2 | 2₹12.6 L+₹1.2 L (10.5%)Rejected-Finance | 2 | Rejected-Finance ok | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹13.2 L
EMD Value
₹26,420
Closing Date
12 May 2026, 5:00 pmClosed
Monika
Municipal Corporation Karnal
Construction and placing of cement concrete nalla cover slab on various nallah to replace existing damaged nalla cover slab, Ward no-14 to 20, M.C. Karnal. (For Rainy season-2026) (Only for L/c societies )
2026_HRY_519600_1
2026DB12FF9F BEE8 42D4 9172 1CF0B1F052EA747ULB
Open Tender
Civil Works
Works
60 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹26,420
Yes
27 May 2026
5 May 2026
13 May 2026
5 May 2026
12 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 11,454.75 | Kg. | 83 | ₹9,50,744.25 |
| 2 | [3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate] | 27 | cum | 202 | ₹5,454 |
| 3 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 27 | cum | 1,149 | ₹31,023 |
| 4 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 76.37 | cum | 4,374 | ₹3,34,042.38 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_598497.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .