RequiredOEM Authorization Certificate Bid to RA enabled Yes Fire Breathing Apparatus (SCBA-IS 10245 Part-2 ) ( 2 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERIC Conformity to Indian International Standard IS10245( Part2) latest for OPEN CIRCUIT BREATHING APPARATUS * Self-contained open circuit compressed air breathing apparatus Compressed air carried in cylinder/cylinders is fed either via pressure reducer and lung governed demand valve or lung governed demand valve connected to the * 1/9 facepiece to enable the wearer to breathe Exhaled air passes through the non-return valve to the atmosphere. Type of open circuit Breathing Appratus (effective air volume at a pressure of 1 bar absolute at a temperature of 20°C ) Capacity Type 5 - 2000 litres(minimum) Capacity Type 5 - 2000 litres(minimum) Safe working duration including 10 minutes safety margin 45 * CONSTRUCTION Robust in Design Sufficiently robust to withstand the rough usage it is likely to receive in service and designed so that it will continue to function satisfactorily
Requiredwhile temporarily
Requiredaccidentally submerged in water at a maximum depth of one metre and thereafter until the air in the cylinder is exhausted. * The apparatus shall be so designed that no parts or sharp edges are likely to be caught on projections in narrow passages Yes * The apparatus shall be so designed that the wearer can remove it and while still wearing the facepiece
Requiredcontinue to breathe air from the apparatus Yes * Designed to ensure its full function in any orientation Yes * The main valve(s) of the air cylinder(s) shall be arranged so
Requiredthat the wearer can operate them while wearing the apparatus Yes * 2/9 The apparatus shall be so designed and constructed as to prevent ingress of the external atmosphere with in the limit set out Yes * Material and Components Head Harness Complete as per clause 5.2.9 of IS 10245 Part 2 * Body Harness Complete as per clause 5.2.10 of IS 10245 Part 2 * Face Mask reverted edge seal type and made of flame resistant material confirming to IS: 14166 latest. The reflex seal on the outer mask shall be so designed so as to facemask to reduce dead space
Requiredspeech transmitter for clear voice reproduction and a wide angle panoramic vision visor made of Polycarbonate material and shall e self - de- misting type. The head straps shall be easy to tighten and quick to release. * Lung Governed Demand Valve Complete as per clause 5.2.12 of IS 10245 Part 2 * Types of Pressure Gauge Bourdon pressure gauge with luminescent dial analog type * Pressure Gauge Compliance Complete as per clause 5.2.13 of IS 10245 Part 2 * Flexible Hoses and Tubes Complete as per clause 5.2.11 of IS 10245 Part 2 * Warning Whistle Fitted either on the back plate or provided along with the pressure gauge assembly and shall be automatic in operation giving audible alarm of minimum 90 dB intensity at 1 meter distance of low cylinder * 3/9 pressure in the range of 50+ 5 Bar Air Cylinder The air cylinder shall comply with appropriate national regulations. The cylinder shall be approved with respect to the appropriate filling pressure. * Air Cylinder material (Non Corrosive Type) Carbon Composite with Aluminum alloy Liner Carbon Composite with Aluminum alloy Liner Total weight of the ready to use set 12 * Approval of Cylinder from Chief Controller of Explosives
RequiredNagpur Yes * PESO Approval Type for Cylinder Type 3 * Hydrostatic Pressure Test for Breathing Apparatus Cylinder Cylinder of adequate water capacity for 45 minutes effective duration at filling pressure not exceeding 300 bar duly hydro- tested to 1.5 times of filling pressure * High Pressure Parts Metallic high pressure tubes
Requiredvalves and coupling shall be capable of withstanding a test pressure twice the maximum filling pressure or 50 percent ofthe maximum filling pressure. Nonmetallic parts shall be capable of withstanding a test pressure twice the maximum filling pressure of the cylinder. * It shall not be possible to fit a low pressure tube or hose directly to a high pressure part of the circuit Yes * All other requirements as per clause 5 of IS 10245 Part 2 regarding design and material Yes * Cylinder Valve The cylinder valve shall * 4/9 be such as to ensure safe performance. The valve shall be so designed that the valve spindle cannot be completely unscrewed from the assembly during normal operation of the valve. Valve Design designed so that a minimum two turns of the handwheel are required to open fully the valve. * Lockable Type valve in open position Yes * Apparatus fitted with more than 2 cylinders may be fitted with individual valve in the cylinder Yes * Cylinder valve connection (valve outlet) It shall not be possible to connect apparatus with a higher maximum filling pressure (e.g. 300 bar) to an apparatus which is designed only for a- lower maximum filling pressure ( e.g. 200 bar ). * Pressure Reducer Complete as per clause 5.2.16 of IS 10245 Part 2 * Second-Man Attachment No * Carrying Case a) A standard strong carrying case to store complete assembled BA set along with BA cylinder should be provided. It should be designed in such a way that all parts of the assembled set could be placed in its proper position. b) A black colour plastic bag to avoid deterioration due to the effect of ultra violet light and also to prevent mask being contaminated by oil
Requiredfuel
Requireddust etc. It will be * 5/9 used to cover the face mask and then store it in the carrying case. Workmanship and Finish It is essential that the standard of workmanship and finish of all parts is such that replacement parts can be supplied and that they will fit correctly and without difficulty. Exposed metal parts would have a finish which can be kept up without the use of metal polish or any other special preparation * Tools Tools necessary for routine testing and servicing must be provided with each set along with one kit of consumable spares * Instruction Book An instruction book in English
Requiredfor the guidance of the user including both operating and normal maintenance procedure must be supplied. The book must include an itemized and illustrated spare parts list
Requiredgiving reference numbers to all parts. * Training The supplier shall provide training to selected staff/Officer for operation and maintenance of BA set. * Spares Supplier shall ensure availability and supply of fast moving spares at short notice for at least five years. The supplier shall provide a price list of such spares along with commercial bid. * PERFORMANCE Water Capacity of Breathing Apparatus Cylinder 6.8 6.8 6/9 Charging Pressure 251 to 300 Bars 251 to 300 Bars Air Capacity of Breathing Apparatus after charging 2000 * Storage and Performance Temperature The apparatus shall operate trouble-free within the temperature range - 30°C to + 60°C * Protection Against Particulate Matter Yes * Practical Performance Test Complete as per clause 5.10 of IS 10245 Part 2 * CERTIFICATION ISI Marked to IS 10245 (part 2) Yes * CM/L NO - * Complete System to be tested to prove conformity of declared parameters as per IS-10245 (Pt -2) latest from any ILAC/NABL accredited/Central Govt Lab Yes * Test Report Number - * Test Report Date - * Name of the Lab where test Conducted - * Test Reports to be furnished to the buyer on demand Yes * Any other certification/marking on complete set (like CE UL/FM/NFPA etc)(otherwise write NA) - * Warranty/Guaranty 1 1.0 Service Support 10 * * Bold specifications are the golden parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer.