Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹7.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.5 L | H1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | H2₹5.5 L−₹2.0 L (26.4%)Admitted-Fee/PreQual/Technical/Finance | ₹5.5 L−₹2.0 L (26.4%) | H2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | H3₹5.2 L−₹2.3 L (30.9%)Admitted-Fee/PreQual/Technical/Finance | ₹5.2 L−₹2.3 L (30.9%) | H3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | H4₹5.1 L−₹2.4 L (32.0%)Admitted-Fee/PreQual/Technical/Finance | ₹5.1 L−₹2.4 L (32.0%) | H4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | H5₹4.7 L−₹2.8 L (37.5%)Admitted-Fee/PreQual/Technical/Finance | ₹4.7 L−₹2.8 L (37.5%) | H5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Karthick Construction H3 | MAYA NATCHIAR ELECTRICALS H4 | DHARMAN TRADERS H2 | mageswari H1 | SRI NATCHIAR TRADERS H5 |
|---|---|---|---|---|---|---|---|---|
| 1.01Labour charges for the Removing and erection of Submersiblepumpset in borewell set for openwel / coupled / monoblock including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing motor in borewell up to 115 M dia including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipe to the required depth valves erection of panel board consisting of TICN switches starter voldmeter ammeter three tilot indicating lamps depositer single phasing prevent water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and all labour charges etc., Note : Re-erection of Centrifuga pumpsets, jet pumpsets and its accessories into the borewell/openwell after attending the repairs 50% of the rate mentioned under item 17 (a) (ii) (TWAD Schedule of Rate Page No.206&207) | ||||||||
| 1.02 | Upto 5HP | 35 | No | 8,918 ₹3,12,130 | 7,500 ₹2,62,500 | 8,000 ₹2,80,000 | 12,896 ₹4,51,360 | 7,000 ₹2,45,000 Lowest |
| 1.03 | 5 HP to 10HP | 5 | No | 10,219 ₹51,095 | 9,500 ₹47,500 | 10,000 ₹50,000 | 14,779 ₹73,895 | 9,000 ₹45,000 Lowest |
| 1.04Rewinding the Submersible Motor Coil including cost of burnt coil including all labour charges etc., complete | ||||||||
| 1.05 | 1.50HP Submersible Motor Coil | 18 | 1No | 3,178 ₹57,204 Lowest | 4,000 ₹72,000 | 4,500 ₹81,000 | 4,596 ₹82,728 | 3,500 ₹63,000 |
| 1.06 | 3.00HP Submersible Motor Coil | 15 | 1No | 3,536 ₹53,040 Lowest | 4,500 ₹67,500 | 5,000 ₹75,000 | 5,114 ₹76,710 | 4,000 ₹60,000 |
| 1.07 | 5.00HP Submersible Motor Coil | 5 | 1No | 3,861 ₹19,305 Lowest | 5,500 ₹27,500 | 6,000 ₹30,000 | 5,584 ₹27,920 | 5,000 ₹25,000 |
| 1.08 | 7.50HP Submersible Motor Coil | 5 | 1No | 4,999 ₹24,995 Lowest | 6,500 ₹32,500 | 7,000 ₹35,000 | 7,230 ₹36,150 | 6,000 ₹30,000 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
17 Aug 2026, 3:00 pmClosed
Sivakasi Corporation Commissioner
Sivakasi Corporation Office Rathinam Nagar 626123
Annual Maintanance and Repair to Submersible Motor at Zone 2 in Sivakasi City Municipal Corporation.
2026_MAWS_687599_4
5720/2026/E2
Open Tender
Maintenance Works
Item Rate
Sivakasi Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
17 Aug 2026
22 Jul 2026
17 Aug 2026
22 Jul 2026
17 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Labour charges for the Removing and erection of Submersiblepumpset in borewell set for openwel / coupled / monoblock including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing motor in borewell up to 115 M dia including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipe to the required depth valves erection of panel board consisting of TICN switches starter voldmeter ammeter three tilot indicating lamps depositer single phasing prevent water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and all labour charges etc., Note : Re-erection of Centrifuga pumpsets, jet pumpsets and its accessories into the borewell/openwell after attending the repairs 50% of the rate mentioned under item 17 (a) (ii) (TWAD Schedule of Rate Page No.206&207) | - | - | - | - |
| 1.02 | Upto 5HP | - | No | - | - |
| 1.03 | 5 HP to 10HP | - | No | - | - |
| 1.04 | Rewinding the Submersible Motor Coil including cost of burnt coil including all labour charges etc., complete | - | - | - | - |
| 1.05 | 1.50HP Submersible Motor Coil | - | 1No | - | - |
| 1.06 | 3.00HP Submersible Motor Coil | - | 1No | - | - |
| 1.07 | 5.00HP Submersible Motor Coil | - | 1No | - | - |
| 1.08 | 7.50HP Submersible Motor Coil | - | 1No | - | - |
stage.html
html • 0.02 MB
finance_826506.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_826506.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .