Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC NO 3 131 BALAJI STREET INDIAN BANK COLONY NARAYANAPURAM MADURAI 625 014 | MADURAI | TAMIL NADU | 625014 | ₹4.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.7 L+₹20,773 (4.60%)Rejected-AOC | ₹4.7 L+₹20,773 (4.60%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | V PANDI L1 | VIGNESH MOORTHY L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3(MC BUILDING DATA PG NO:25) | 30 | m3 | 288.7 ₹8,661 Lowest | 302 ₹9,060 |
| 2.01 | Supply and delivery and fixing of pvc pipes and specials as per is specicification (TWAD DATA PG NO:21)
200mm pvc pipe (6ksc) | 30 | m | 693.5 ₹20,805 Lowest | 725.4 ₹21,762 |
| 3.01 | Conveying of GI& PVC pipes and Specials from work spot and lowering into trench and laying to preper grade alignment etc., complete(MC BUILDING DATA PG NO:00) | 30 | m | 40.6 ₹1,218 Lowest | 42.5 ₹1,275 |
| 4.01 | Refilling the trenches with excavated earth in layer of 15cm thick well rammed consolidated including watering complying with standed etc., complete(MC BUILDING DATA PG NO:06) | 30 | m3 | 46.9 ₹1,407 Lowest | 49.1 ₹1,473 |
| 5.01 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not morethan 15cm. Thick well rammed watered and compacted etc., complete complying with standard specification.MDU-CORP-DATA-P-27, s.no.5 | 4.6 | m3 | 672.4 ₹3,093.04 Lowest | 703.3 ₹3,235.18 |
| 6.01 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISSHBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc.,complete as per standard specification MDU-CORP-BUILDING DATA-P-27-SL No:8 | 3.4 | m3 | 7,013.6 ₹23,846.24 Lowest | 7,336.2 ₹24,943.08 |
| 7.01 | Supply of FRC Manhole 600 mm size dia cover with frame including cost of conveyance loading fixing the same etc complete MDU-CORP-ROAD DATA-P-26 | 10 | nos | 2,687.5 ₹26,875 Lowest | 2,811.1 ₹28,111 |
| 8.01 | Raising the existing circular man hole in heavy type including the removing the existing the man hole cover with frame and dismantling the existing the cement concerte wall end tar road surface around the manhole using 1 : 2: 4 20mm jelly for raising the existing the manhole wall and using CC 1:2:4 with 20mm grainte chips for finshing the top surface MDU-CORP-ROAD DATA-P-26 | 45 | nos | 5,100.4 ₹2,29,518 Lowest | 5,335 ₹2,40,075 |
| 9.01 | Construction of man holes at various depth to invert including earth work excavation as per SS 20B laying cement concerte in C.M. 1:3:6 using 40mm B.G. jelly for foundation, sinking well kerbs below G.I. for 4.5m depth and above, pumping,timbering charges for 2.5m depth and above stock brick work in C.M. 1:3 for 23 cm thick wall plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3,12mm thick laying plain cement concerte 1:3:6 using 12.0mm to 20mm B.G jelly fixing the frame, providing C.I. steps,man hole cover and frame, bencing and channeling including refiiling the trench with excavated earth disposal of surplus earth etc., complete for the following sizes for each man hole 2.00m Depth MDU-CORP-ROAD DATA-P-94 | 2 | Nos | 33,624 ₹67,248 Lowest | 35,170.7 ₹70,341.4 |
| 10.01 | Add GST 18% | 1 | GST | 74,439.9 ₹74,439.9 Lowest | 77,864.1 ₹77,864.1 |
Tender Value
₹4.9 L
EMD Value
₹4,905
Closing Date
23 Jan 2026, 10:00 amClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Providing UGD Pipe Line Arrangements at Krishna Street Raising the existing Manhole at Melakkal Main Road in Ward No.66.
2026_MAWS_640904_1
Z2 / E1 / EST.532 / 2025-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,905
20 Jul 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3(MC BUILDING DATA PG NO:25)
Supply and delivery and fixing of pvc pipes and specials as per is specicification (TWAD DATA PG NO:21) 200mm pvc pipe (6ksc)
Conveying of GI& PVC pipes and Specials from work spot and lowering into trench and laying to preper grade alignment etc., complete(MC BUILDING DATA PG NO:00)
Refilling the trenches with excavated earth in layer of 15cm thick well rammed consolidated including watering complying with standed etc., complete(MC BUILDING DATA PG NO:06)
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not morethan 15cm. Thick well rammed watered and compacted etc., complete complying with standard specification.MDU-CORP-DATA-P-27, s.no.5
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISSHBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc.,complete as per standard specification MDU-CORP-BUILDING DATA-P-27-SL No:8
Supply of FRC Manhole 600 mm size dia cover with frame including cost of conveyance loading fixing the same etc complete MDU-CORP-ROAD DATA-P-26
Raising the existing circular man hole in heavy type including the removing the existing the man hole cover with frame and dismantling the existing the cement concerte wall end tar road surface around the manhole using 1 : 2: 4 20mm jelly for raising the existing the manhole wall and using CC 1:2:4 with 20mm grainte chips for finshing the top surface MDU-CORP-ROAD DATA-P-26
Construction of man holes at various depth to invert including earth work excavation as per SS 20B laying cement concerte in C.M. 1:3:6 using 40mm B.G. jelly for foundation, sinking well kerbs below G.I. for 4.5m depth and above, pumping,timbering charges for 2.5m depth and above stock brick work in C.M. 1:3 for 23 cm thick wall plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3,12mm thick laying plain cement concerte 1:3:6 using 12.0mm to 20mm B.G jelly fixing the frame, providing C.I. steps,man hole cover and frame, bencing and channeling including refiiling the trench with excavated earth disposal of surplus earth etc., complete for the following sizes for each man hole 2.00m Depth MDU-CORP-ROAD DATA-P-94
Add GST 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
1.pdf
Tender Documents • 0.84 MB
BOQ_767561.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .