Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | -30.00% | ₹1.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | -30.00% | ₹1.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹1.1 L+₹5,180 (5.00%)Admitted-Fee/PreQual/Technical/Finance | -26.50% | ₹1.1 L+₹5,180 (5.00%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,440
Closing Date
22 Jul 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O DRAIN NLO GH MOHD WANI AT PALPORA BLOCK KPORA
2026_RDPR_316267_20
ENIT64of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,440
26 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by the way of engagement of labors including surface excavation and removal of shrubs hurbs etc. | - | lab | - | - |
| 0.0 | E/w in excavation in foundation trenches by manual means dispoal lead upto 25 mts and lift 1.5 mts in all kinds of soil | 11.61 | Cum | - | - |
| 0.0 | P/L of stone Soling tightly handpacked and tamped manually and 10% Voids deduction (to be paid as per actual) I/C plum in c/c | - | Cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm down aggregates | - | Cum | - | - |
| 0.0 | P/F of shuttering using ordinary timber planks of wood including its removal. | - | Sqm | - | - |
| 0.0 | Plastering in 1:6 mix | - | Sqm | 1 | - |
| 0.0 | Carriage of materials by mechanical transport
Sand & Bajri SOLING at an average lead of 20 kms & H/L of 300 Mtr | 1 | Cum | - | - |
| 0.0 | Provision for sign board and photographs & Carriage of cement/dewatering charges | - | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1030896.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .