Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,840
Closing Date
19 Jun 2026, 6:00 pm5d left
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Const. of Tile work on Road from the Main Market Talwara to Public Modern School TalwaraPyt. Upper TalwaraBlock Pouni Dist. Reasi under CDF for the year 2026-27
2026_RDPR_312201_4
e-NIT No. 20 of REW REASI of 2026-27
Open Tender
Civil Works
90 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹5,840
12 Jun 2026
12 Jun 2026
20 Jun 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil. | 1.79 | Cum | 479.3 | ₹857.95 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 15.6 | Cum | 4,826.5 | ₹75,293.4 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 7.9 | Cum | 5,733.6 | ₹45,295.44 |
| 4 | Providing and laying 80mm thick factory made cement concrete
interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 156 | Sqm | 929.85 | ₹1,45,056.6 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 23.4 | Sqm | 286.35 | ₹6,700.59 |
| 6 | Construction of CIB (Include concrete/Brick pedestal of size 3' x 2'. Platering ,painting all complete job as per direction of Engineer-in-charge | 1 | No. | 5,000 | ₹5,000 |
| 7Carriage of material from source to site of work by MT/AT including loading, unloading and stacking complete. | |||||
| 7.01 | Cement 5 KM by MT. | 3.45 | MT | 178.43 | ₹615.58 |
| 7.02 | Sand 50 KM by MT. | 10.86 | Cum | 200.74 | ₹2,180.04 |
| 7.03 | Stone Aggregates 50 KM by MT. | 21.73 | Cum | 200.74 | ₹4,362.08 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_1010615.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid