| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | ₹12.8 L | L1 | Accepted-AOC As per AOC |
| 2 | L2₹13.3 LRejected-Finance | ₹13.3 L | L2 | Rejected-Finance As per Financial Evaluation |
| 3 | L3₹14.7 LRejected-Finance | ₹14.7 L | L3 | Rejected-Finance As per Financial Evaluation |
| 4 | L4₹15.0 LRejected-Finance | ₹15.0 L | L4 | Rejected-Finance As per Financial Evaluation |
| 5 | L5₹16.9 LRejected-Finance | ₹16.9 L | L5 | Rejected-Finance As per Financial Evaluation |
Tender Value
Refer Docs
EMD Value
₹35,900
Closing Date
14 May 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer Construction Division E and M U.P. Jal Nigam Urban, Varanasi
Repairing of 33 to 0.4KV, 1000 KVA capacity transformer with copper winding on the place of Aluminium winding at Konia MPS Varanasi
2026_UPJNM_1143849_1
849/E-Tender/21 Dated 28.04.26
Open Tender
Repair and Maintenance Works
Percentage
30 days
Varanasi
As per NIT and Tender Document
2 documents required · 2 mandatory
₹3,540
E.E. CD E and M U.P. Jal Nigam Urban, Varanasi
₹35,900
29 May 2026
2 May 2026
15 May 2026
2 May 2026
14 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing of 33/0.4KV, 1000 KVA capacity transformer with copper winding on the place of Aluminium winding at Konia MPS. Varanasi | |||||
| 1.01 | Opening of transformer top cover, draining out the transformer oil from tank, dismantling and taking out of complete winding with stamping (core) from tank. | - | Job | - | - |
| 1.02 | Opening of stamping (core) top and taking out the burnt H.T. & L.T.coils from stamping. | - | Job | - | - |
| 1.03 | Rewinding of above 1000 KVA Transformer with copper wire and strips insulation etc. complete in all respect of H.T.& L.T. winding at the place of Alu. strip winding as per size and rating including.
Cost to be adjusted in the rates against the damaged and old Alu. coil deducted.- 563 Kg. | - | Job | 0.03 | - |
| 1.04 | Pre heating of above re-winded coil and varnishing, baktol coating etc. complete and heating, testing etc. complete. | - | Job | - | - |
| 1.05 | Fitting of above re-winded coils in stamping, assembling, of stamping and refitting in transformer tank as same with making H.T. & L.T. side terminal connections ..T.H. | - | Job | - | - |
| 1.06 | After completion of above works fitting of transformer tap cover with new packing etc. | - | Job | - | - |
| 1.07 | Centrifuging of old transformer oil and filling in tank. | - | Litre | - | - |
| 1.08 | Supply & Filling of fresh transformer oil in tank to maintained the top level . | - | Litre | - | - |
| 1.09 | Carting of above transformer from workshop to Konia MPS including loading and unloading | - | Job | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
DOCKONIA849.pdf
Tender Documents • 2.90 MB
BOQ_2136976.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].