Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC PANDADESWAR BARDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹3.4 L+₹35,388.20 (11.7%)Rejected-Finance 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹4.5 L+₹1.5 L (48.2%)Rejected-Finance STATION ROAD P O UKHRA DIST BURDWAN PIN 713363 W B | UKHRA | BURDWAN | WEST BENGAL | 713363 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
27 Feb 2024, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 2nos 400 ammps11KV OCB, 5Nos 800Amps 3.3KV OCB, Cable termination, cable laying, making of 3 nos. earth pit and earth wiring at tilaboni unit main sub- station from old sub station room to new sub station room
2024_ECL_301768_1
ECL/GM/BA/E TENDER/23-24/EnM/320 Dt. 16.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Tilaboni Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹5,300
8 Apr 2024
17 Feb 2024
28 Feb 2024
17 Feb 2024
27 Feb 2024
17 Feb 2024
17 Feb 2024 - 21 Feb 2024
Amount
Item Description/ Heading
Dismantling of 11KV grade XLPE copper cable for 11KV WBSEDCL secondary side, 11KV OCB incoming side, secondary side, 500KV/550V Primry side, 11KV OCB secondary side, 100KVA primary side and secondary side 3.3KV OCB incomming and outgoing etc
Laying of 70sqmm 11KV grade cupper cable for 2nos 11KV OCB -150 Mtr + 5nos 3.3KV OCB 95sqmm PVC insulated copper cable-250mtr
Supply and jointing of indoor type heatsink joint kit 11KV grade 70sqmm XLPE cupper cable
Supply and jointing of 3.3KV grade PVC insulated copper cable for 3.3KV OCB incamming and outgoing cable joint with insulating materials by HT monopluse tape, N/A tape, adhesive tape, paper tape etc
Supply and cramping of 95/120sqmm coper hevy duty lugs
Dismantling,shifting and placing of 400Amps ECE make 11KV OCB from Old room to new room through manually (manpower)
Dismantling, shifting and placing of 600Amps C.P make 3.3KV OCB from Old room to new room through manually(manpower)
Making of earth pit by GI pipe 2nos , earth spike 2nos, cupper wire, bantonite soil, salt etc
Brick work of earth pit by kill bank brick, cement, sandand making plastering.
Earth wiring by 50x6mm GI flat for all OCB body earthing inciuding febricating, making, holding with G nut, bolt, washer.
Total impact of GST for the purpose of CTC
MAZUMDER ELECTRICAL
ANNAPURNA ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .