Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-Finance | ₹15.9 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹16.0 L+₹7,948.50 (0.50%)Accepted-Finance | ₹16.0 L+₹7,948.50 (0.50%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹16.1 L+₹23,845.51 (1.50%)Accepted-Finance | ₹16.1 L+₹23,845.51 (1.50%) | L3 | Accepted-Finance Accepted |
Tender Value
₹15.9 L
Closing Date
30 Apr 2026, 5:00 pmClosed
Executive Engineer work division Chiplun ZP Ratnag
Dr.Babasaheb Ambedkar Bhawan,Malanaka, Z.P.Ratnagiri
Constructing road at Pure Bk Katkarwadi Tal khed Dist Ratnagiri
2026_RATNA_1295027_1
RZP/WD-Chiplun/E-Ten LabourCoOp Society-01/26-27
Open Tender
Civil Works - Roads
Percentage
180 days
Khed
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Exempted
8 Jun 2026
16 Apr 2026
4 May 2026
16 Apr 2026
30 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavatedmaterial up to a distance of 50m. beyond the building area andstacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming,watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | - | Cubic Metre | - | - |
| 2 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a) 80 mm Metal, By breaking Boulders (Hand broken). | - | Cubic Metre | - | - |
| 3 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a) 40 mm Metal, By breaking Boulders (Hand broken). | - | Cubic Metre | - | - |
| 4 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | - | Cubic Metre | - | - |
| 5 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | - | Cubic Metre | - | - |
| 6 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | - | Cubic Metre | - | - |
| 7 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | - | Cubic Metre | - | - |
| 8 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | - | Cubic Metre | - | - |
| 9 | Providing and constructing 50mm. thick Modified Penetration Macadam (MPM) road surface including all materials,preparing the existing road surface,spreading 40mm.stone layers metal 100% crusher broken metal with conical crusher palnt ,heating and spraying the bitumen of specified grade @1.75kg /sqm, spreading 12mm. size chips compacting with Static roller having weight 8 to10 MT.to achive the desired degree of compaction as perTechnical Specification Clause 506 etc.complete, including applying tack coat at the rate of 0.30Kg Sqm.on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | - | Square Metre | - | - |
| 10 | Premix bituminous carpet 7°mm thick VG-4° grade
Providing 20 mm thick premix bituminous carpet including
supplying all materials, preparing and cleaning the ase, heating bitumen applying tack coat at specified rate, Mix hot bitumen and chips, laying the carpet layer and compacting etc. complete. By Bulk Asphalt. (excluding Tack coat). ( q}Q-. Mix with prior approval) | - | Square Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
B1Purekatkariwadi.pdf
Tender Documents • 0.40 MB
BOQ_2225144.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .