Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.1 L+₹5,321.40 (2.60%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.2 L+₹19,125.45 (9.34%)Admitted-Finance ADHA JALLIM MAINPURI PHATAK ETAWAH | L3 | Admitted-Finance | |
| 4 | L4₹2.7 L+₹60,489.69 (29.5%)Admitted-Finance NAN | L4 | Admitted-Finance | |
| 5 | L5₹2.7 L+₹61,470.65 (30.0%)Admitted-Finance RYO SHIVPUSI SHALA KOKPURA ETAWAH | ETAWAH | UTTAR PRADESH | 206001 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S DEV CONSTRUCTION L7 | SHAILENDRA SINGH L3 | M/S R D CONSTRUCTION SUPPLIER L1 | A K INFRATECH L2 | JAGDISH ASSOCIATES L6 | sudhir yadav L5 | M/S SONI CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt Clearance including lift up to 1.5 m. and lead up to 30 m. including ramming and dressing by hydraulic excavator/JCB/Poclain Machine. The earth from Clearence to be used side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge | 4,269.04 | M³ | 39.2 ₹1,67,346.37 | 50 ₹2,13,452 | 28.18 ₹1,20,301.55 Lowest | 28.91 ₹1,23,417.95 | 47.58 ₹2,03,120.92 | 55 ₹2,34,797.2 | 56 ₹2,39,066.24 |
| 2.00 | Uprooting sarpat,Moonj & jhunds from internal Section of canal i/c Daula to top of right bank. | 5,250 | M² | 22.4 ₹1,17,600 | 2 ₹10,500 Lowest | 16.1 ₹84,525 | 16.52 ₹86,730 | 14.04 ₹73,710 | 6 ₹31,500 | 5 ₹26,250 |
Tender Value
₹3.6 L
EMD Value
₹7,000
Closing Date
5 Oct 2026, 2:00 pmClosed
Executive Engineer
BDLGC, Etawah
SILT CLEARANCE OF BIDHIPUR DY FROM KM. 8.000 TO KM. 15.000 FOR YEAR 2026-27
2026_UPIDC_1190557_9
05/EE/2026-27
Open Tender
Civil Works
Item Rate
21 days
Etawah
Please refer Tender documents.
2 documents required · 2 mandatory
₹269
₹7,000
12 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt Clearance including lift up to 1.5 m. and lead up to 30 m. including ramming and dressing by hydraulic excavator/JCB/Poclain Machine. The earth from Clearence to be used side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge | 4,269.04 | M³ | - | - |
| 2 | Uprooting sarpat,Moonj & jhunds from internal Section of canal i/c Daula to top of right bank. | 5,250 | M² | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_2244639.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .