Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-Finance | L1 | Accepted-Finance 1ST LOWEST BIDDER | |
| 2 | L2₹14.4 L+₹2,155.67 (0.15%)Rejected-Finance NEW PATAKURA DIST COOCH BEHAR | COOCH BEHAR | WEST BENGAL | L2 | Rejected-Finance 2ND LOWEST BIDDER | |
| 3 | L3₹14.4 L+₹2,730.52 (0.19%)Rejected-Finance | L3 | Rejected-Finance 3RD LOWEST BIDDER |
Tender Value
₹14.4 L
EMD Value
₹28,800
Closing Date
26 Feb 2026, 12:00 pmClosed
BDO AND EXECUTIVE OFFICER COB II PS
Block Development Officer and Ex-Officio, Coochbehar-II, P.O. Pundibari, Dist. Cooch Behar. W.B.
Construction of Cement Concrete Drain from house of Abey Bibi towards the house of Jayatri Shil within Khagrabari Gram Panchayat under Cooch II Panchayat Samity
2026_ZPHD_1003663_1
NIT No.-11/EO/COB-II PS/2025-26 SL 01
Open Tender
CIVIL WORKS
Percentage
65 days
WITHIN COOCH BEHAR II PS JURISDICTION
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
₹28,800
12 Jul 2026
11 Feb 2026
28 Feb 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction Works (Civil) | |||||
| 1.01 | Earth work in excavation of foundation trenches or drain in all sorts of soils (including mixed soil but excluding laterite or sand stone) including removing spreading ro stacking the spoils within a lead of 75 m, as directed including trimming the side of trenches, levelling dressing an raming the bottom, bailing out water etc. as required complete.
a) Depth of excavation not exceeding 1.5 m | 161.04 | Cum | 119.27 | ₹19,207.24 |
| 1.02 | Filling in foundationorplinthby silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to bemade onmeasurement of finished quantity)) | 32.21 | Cum | 77.54 | ₹2,497.56 |
| 1.03 | Single brick flat soling of picked jhama brick including ramming and dressing bed to proper leveling and filling joints with local sand | 292.8 | Sqm | 322 | ₹94,281.6 |
| 1.04 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes | 133.2 | Cum | 3,884.39 | ₹5,17,400.75 |
| 1.05 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) Excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) River Bazree. | 26.88 | Cum | 4,567.21 | ₹1,22,766.6 |
| 1.06 | Reinforcement for reinforced concrete work in all sorts of structure including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary) cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16G black annealed wire at every intersction, complete as per drawing and direction | 0.2 | Qntl | 6,107.78 | ₹1,220.95 |
| 1.07 | Hire and labour charge for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slab, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto the roof of ground floor)
(f) 25mm to 30 mm thick wooden shuttering as per decision & direction of Eng-in - Charge. | 974.4 | Sqm | 205 | ₹1,99,752 |
| 1.08 | Plaster (to wall, floor, ceiling etc) with sand - cement-morter including rounding off and chamfering corners as directed and racking out joints including throating, noising and drip course, scaffolding / staging where necessary ( Ground floor) (excluding cost of chipping over concrete surface )
ii) With (1:4) Cement morter
c) 10mm thick plaster | 1 | Sqm | 123.47 | ₹123.46 |
| 1.09 | Neat cement plunning about 1.5mm thick in wall dado, window sills, floors, drains etc. using cement @ .152 cu m/100 sq m | 760.8 | Sqm | 32.71 | ₹24,885.77 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_2460431.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .