Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical qualified |
| 2 | Accepted-Technical | Accepted-Technical qualified |
| 3 | Accepted-Technical | Accepted-Technical qualified |
| 4 | Accepted-Technical | Accepted-Technical qualified |
| 5 | Accepted-Technical | Accepted-Technical qualified |
Tender Value
₹50.6 L
EMD Value
₹1.0 L
Closing Date
31 May 2023, 4:00 pmClosed
Executive Engineer
O/o the Inspector General, Ftr Hqrs SSB Tezpur
SITC of 15 KWp Solar Power Plant at 03 BOPs i.e. BOP Muktar, Namitsering and Marme of 67 Bn SSB Lumla under FTR HQ SSB Tezpur
2023_SSB_753632_1
FT/1274/SPP/67 Bn/Ftr Tzp/23/8866-67 dtd 17/5/23
Open Tender
Power/Energy Projects/Products
Works
180 days
BOP Muktar, Namitsering and Marme of Lumla
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹1.0 L
Yes
Ftr Hqrs SSB Tezpur
9 Jun 2023
18 May 2023
8 Jun 2023
19 May 2023
31 May 2023
25 May 2023
19 May 2023 - 22 May 2023
23 May 2023
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .