Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.2 CrAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹35.1 Cr+₹93.8 L (2.75%)Rejected-AOC 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L2 | Rejected-AOC Reject | |
| 3 | L3₹37.6 Cr+₹3.4 Cr (10.0%)Rejected-Finance D 2 3 RAJAT APARTMENT SENAPATI BAPAT ROAD SHIVAJI NAGAR PUNE 411016 | PUNE | MAHARASHTRA | 411016 | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-PreQual/Technical AURANGABAD MAHARASHTRA | AURANGABAD | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | - | Not Admitted-PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-PreQual/Technical | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹30.5 Cr
EMD Value
₹15.3 L
Closing Date
31 Aug 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Public Works Building Division
Executive Engineer, Public Works Building Division, Pune at Govt. Milk Scheme Campus
Construction of State Of Art Office building and Campus based on GRIHA Green building ,Super ECBC and Net zero energy principles for Maharashtra Energy Development Agencey MEDA at Aundh Pune-7 (Balance work of Main building B plus G plus 3 floors, D.
2021_PWDRP_708962_1
E-Tender Notice No. 5 for 2021-22
Open Tender
Civil Works
Item Rate
545 days
Aundh
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,360
₹15.3 L
Chief Engineer, Public Works Region, Pune 1 at cen
14 Mar 2022
31 Jul 2021
2 Sept 2021
31 Jul 2021
31 Aug 2021
31 Jul 2021
10 Aug 2021
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth,soil of all types, sand ,gravel and soft murum ,including removing the excavated material up to a distance of 50 meter beyond the building area & stacking and spreading as directed,dewatering preparing the bed for the foundation and necessary back filling,ramming,watering including shoring and strutting etc.complete.(Lift upto 1.50 meter) By Mechanical Means.R.A.NO.1 | 1,494.66 | Cubic Meter | 100 | ₹1,49,466 |
| 2 | Excavation for foundation in hard murum, including removing the excavated material up to a distance of 50 meter beyond the building area & stacking and spreading as directed,dewatering preparing the bed for the foundation and necessary back filling,ramming,watering including shoring and strutting etc.complete.For Lift upto 1.50 meter By Mechanical Means.R.A.NO.2 | 1,090.44 | Cubic Meter | 100 | ₹1,09,044 |
| 3 | Excavation for foundation in hard murum, including removing the excavated material up to a distance of 50 meter beyond the building area & stacking and spreading as directed,dewatering preparing the bed for the foundation and necessary back filling,ramming,watering including shoring and strutting etc.complete.For Lift upto 1.50 meter By Mechanical Means.R.A.NO.2 | 22.5 | Cubic Meter | 100 | ₹2,250 |
| 4 | Excavation for foundation in hard murum, including removing the excavated material up to a distance of 50 meter beyond the building area & stacking and spreading as directed,dewatering preparing the bed for the foundation and necessary back filling,ramming,watering including shoring and strutting etc.complete.For Lift from 1.50 meter to 3.0 meter By Mechanical Means.R.A.NO.3 | 155.56 | Cubic Meter | 100 | ₹15,556 |
| 5 | Excavation for foundation in hard murum and boulders, including removing the excavated material up to a distance of 50 meter beyond the building area & stacking and spreading as directed,dewatering preparing the bed for the foundation and necessary back filling,ramming,watering including shoring and strutting etc.complete.(Lift upto 1.50 meter to 3.0 eter)By Mechanical Means.R.A.NO.4 | 67.48 | Cubic Meter | 100 | ₹6,748 |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5 m) by Mechanical Means.R.A.NO.5 | 22.5 | Cubic Meter | 100 | ₹2,250 |
| 7 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 meters beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/ murum, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 metre to 3.0 metre) by Mechanical Means.R.A.NO.5 | 64.78 | Cubic Meter | 100 | ₹6,478 |
| 8 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/ murum watering, ramming etc. complete, (Lift from 1.5m To 3.0 m) by Mechanical Means. | 11.25 | Cubic Meter | 100 | ₹1,125 |
| 9 | Excavation for foundation in hard rock by chiselling ,wedging,line drilling etc. including trimming and levelling the bed removing the excavated material upto a distance of 50 meter, beyond the building area,stacking as directed, dewatering and back filling with available earth, murum, ramming, watering etc.complete. Lift 1.5 meter(SSR NO 21.20)R.A.NO.6 | 240.46 | Cubic Meter | 100 | ₹24,046 |
| 10 | Dewatering on Break Horse Power basis by using water pump including diversion of stream, providing coffer dams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required. a) By using 3.0 Break Horse Power Pump. Note : Prior approval of Superintending Engineer will be necessary. Spec : BR 4 Page No 104.105(SSR NO 12.22)R.A.NO.7 | 200 | Hours | 100 | ₹20,000 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1225424.xls
BOQ Document • 1.76 MB
81112127.pdf
Tender Document • 1.14 MB
MEDAdtpfinal.pdf
Tender Document • 32.41 MB
81112134.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .