Loading…
Loading…
| # | Company | Quoted % | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹64.9 L | L1 | ||
| 2 | L2₹68.9 L+₹4.0 L (6.24%) | L2 | ||
| 3 | L3₹78.7 L+₹13.9 L (21.4%) | L3 | ||
| 4 | L4₹78.9 L+₹14.1 L (21.7%) | L4 | ||
| 5 | L5₹80.2 L+₹15.4 L (23.7%) | L5 |
Tender Value
₹75 L
EMD Value
₹75,000
Closing Date
27 Apr 2026, 5:30 pmClosed
- Santosh Kumar Pandev(DFLT)
MUNICIPAL CORPORATION, RAIPUR
हवलदार अब्दुल हमीद वार्ड क्र. 35 अंतर्गत शहीद स्मारक भवन के पास से मौदहापारा तक भाजपा कार्यालय होते हुए पुलिया एवं नाला निर्माण कार्य।
188516
NIT NO:01/PWD/Zone-2/2026 RAIPUR DATED: 06/04/2026
RESTRICTED TENDER
WORKS
PERCENTAGE
6 days
MUNICIPAL CORPORATION
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
12 documents required · 12 mandatory
Urban Administration and Development Department (UADD)
WORKS
- Santosh Kumar Pandev(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B C D
MUNICIPAL CORPORATION, RAIPUR
TENDER SECTION
COMMISSINOR, MUNICIPAL CORPORATION, RAIPUR
120
6.00
No
1
188516
27 Apr, 2026 5:30:55 PM IST
29 Apr, 2026 11:30:30 AM IST
7 Apr, 2026 10:00:00 AM IST
NIT NO:01/PWD/Zone-2/2026 RAIPUR DATED: 06/04/2026
हवलदार अब्दुल हमीद वार्ड क्र. 35 अंतर्गत शहीद स्मारक भवन के पास से मौदहापारा तक भाजपा कार्यालय होते हुए पुलिया एवं नाला निर्माण कार्य।
75000.00 INR
Fixed Deposit Receipt (OFFLINE)
2
28 Apr, 2026 5:30:10 PM IST
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
12 documents required · 7 mandatory · 5 optional
₹0
₹75,000
27 Apr 2026
7 Apr 2026
29 Apr 2026
7 Apr 2026
28 Apr 2026
OFFICE OF THE MUNICIPAL CORPORATION RAIPUR (C.G.)
Zone No- 02 (Estimate)
Bill of Quantity for Construction of Rcc drain and Culvert From Near Shahid Smarak Bhawan To Modhapara Via BJP Office, Ward No. 36.
S.N. Item No. Description and details of work Contents Rate Unit Amount
1 16.42 Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material within 50 metre lead.
2 16.43 Demolishing cement concrete including disposal of material within 50 metre lead.
16.43.1 1:4:8 or leaner mix
16.43.2 1:3:6 or leaner mix
3 16.3 Demolishing brick masonry including arches, stacking of serviceable material disposal of unserviceable material within 50 metres lead.
4 1.1 Excavation for all types and sizes of foundations, trenches and drains or for any other purpose including disposal of excavated stuff upto 1.5 m lift and lead upto 50m (at least 5m away from the excavated area), including dressing and leveling of pits.
In all types of soil
5 1.26 Carriage by mechanical transport upto 5 km lead:
1.26.3 Dismantled Building debris (Mulba) 376.52 91.50 Cum. 34451.58
6 1.10 Pumping out water caused by springs tidal or river seepage, broken water main or drains and like during Excavation or during Excavation and laying of base concrete (volume to be calculated taking height from water level to bottom of pit and to be measured and paid) .
7 1.80 Extra rate for quantity of work executed in or under foul condition.
8 1.18 Providing and filling in plinth with sand/ Crusher dust and hard moorum under floor in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, including dressing etc. complete.
9 3.1 Providing and laying nominal mix cement concrete with crushed stone aggregate using concrete mixer in foundation, plinth and at ground level excluding cost of form work with 20 mm metal.
3.1.2 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size).
10 3.2 Providing and laying nominal mix reinforced cement concrete with crushed stone aggregate using concrete mixer in all works upto plinth level excluding cost of form work.
3.2.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size).
11 3.1 Extra for laying PCC/ RCC, in or under water or liquid mud including cost of pumping or bailing out of water and removing slush etc. complete:
12 3.12 Providing and placing in position reinforcement for R.C.C. workincluding straightening, cutting, bending, binding etc. complete as per drawings including cost of binding wire in foundation and plinth all complete:
3.12.1 Thermo-Mechanically treated bars FE 415 65430.00 54.50 kg 3565935.00
13 2.1 Providing and fixing form work including centring, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:
2.1.1 Foundations, footings, bases of columns plinth beam, curtain wall in any shape and size and all type of wall below plinth level.
2.1.7 Suspended floors, roofs, access platform, balconies (plain surfaces) and shelves (cast in situ)
Note: Rates as per PWD, SOR (Building Works) 01-01-2015 Total 7500103.77
boq_comp_chart.xls
BOQ Comparative Chart • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.02 MB
6299603037814461965_188516_298412567848275146_168901_Affidavit format.pdf
NIT • 0.06 MB
3970099112747725372_188516_5234216335934833897_168901_Form A.pdf
NIT • 0.19 MB
303884992159492902_188516_Nit Details (2).doc
NIT • 0.08 MB
1414666691157856875_188516_BOQ_75Lc.xlsx
BOQ • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .