| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC 3RD FLOOR OFFICE 0 4 SHIRDHAR APARTMENTS RAJENDRA NAGAR SADASHIV PETH PUNE MAHARASHTRA 411030 | PUNE | MAHARASHTRA | 411030 | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 Cr+₹1.4 Cr (101.0%)Rejected-Finance | ₹2.8 Cr+₹1.4 Cr (101.0%) | L2 | Rejected-Finance NOT L1 |
| 3 | L3₹23.5 Cr+₹22.2 Cr (1601.8%)Rejected-Finance | ₹23.5 Cr+₹22.2 Cr (1601.8%) | L3 | Rejected-Finance NOT L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical the bidder does not meet PQC for similar works hence bidder is recommended for technical disqualification. |
| 5 | Rejected-Technical 101 SAILEELA APARTMENT AKASH NAGAR NEAR MANEWADA AKASH NAGAR NAGPUR MAHARASHTRA 440034 | NAGPUR | MAHARASHTRA | 440034 | - | - | Rejected-Technical the bidder does not meet PQC for similar works hence bidder is recommended for technical disqualification. |
Tender Value
Refer Docs
Closing Date
23 Feb 2024, 5:00 pmClosed
GM (Contract Cell)
REGIONAL CONTRACT CELL INDIANOIL BHAVAN SOUTHERN REGIONAL OFFICE, 8TH LEVEL, NO. 139, UTTAMAR GANDHI SALAI, CHENNAI 600 034
Design, Manufacture, Supply, installation testing and commissioning of 120 KL per hr Mechanized OWS,Effluent Treatment Plant along with comprehensive AMC for Five years after warranty period of 2 years at Bangalore Terminal, Karnataka.
2024_SROTN_174609_1
SRCC/PT/178/KASO/2023-24
Open Tender
Civil Works
Tender cum Auction
2795 days
Bangalore Terminal, Karnataka.
as per tender document
5 documents required · 5 mandatory
Exempted
as per tender document
13 May 2024
22 Jan 2024
24 Feb 2024
22 Jan 2024
23 Feb 2024
3 Feb 2024
27 Jan 2024
Amount
LSTK for VRU system : (Sangrur Terminal )
Design, Manufacture, Supply, installation testing & commissioning of Mechanized OWS/Effluent Treatment Plant (120 KL/HR) consisting of Screening system, Corrugated plate separator, Multimedia Filter, Coalescer Filter, Oil Water Feed Pump (1 Working + 1 standby), Treated water feed pump (1working + 1 standby), Oil recovery Pump (1working + 1 standby), Piping system, Control system, Oil water separator with skimmer, Purimeter, Compressor all pipes fittings, valves, Energy meter etc as per enclosed schematic drawings & specifications.
Note: a) Rate does not include Civil works comprising of Site clearing & area developement, U/G & A/G holding tanks, Civil Structures, pipe sleepers, equipment foundations etc. However, required structural support for mounting of equipment is in the scope of the bidder. The scope includes submission of desin drawing required for construction of Civil foundations, Oil water separation tank, AERATION TANK, OIL COLLECTION TANK etc required for successful functioning of the ETP system. b. Rate does not include supply & installation of Piping upto the ETP system ( ie from respective areas to Oil water collection tank) c. Except for items mentioned in Note a. & b. as above, all items including cablings(Including Main Power & Control cable from PMCC & Control room and Cabling within the system), shed, earthings, lighting within the area/System etc forming part of the design & operation of the ETP are included in the item rates. Approx distance from PMCC panel to proposed ETP system is 500m & Control room to proposed ETP system is 450m. Bidder to consider the same for Power & Control cables supply and laying purpose.
Comprehensive Annual Maintenance Contract for a period of Five years for entire Mechanised OWS (As per items mentioned under Part1.1) after successful completion of warranty period of 2 years from the date of successful completion of SAT as described Technical Bid. Cost of all the required spares, hardwares, software modification, tools and tackles, ladders, labours, Preventive & Breakdown maintenance Service, calibration of instruments, rectification/ replacement of faulty MOWS equipment etc required for running and maintenance of the entire MOWS to the desired performance level throughout the contract period of CAMC is included in the item rates and the same has to be borne by the Vendor. Note: CAMC Charges for each year of operation from 3rd year to 7th year shall be minimum 3% of the supply and Installation Cost. In case the successful bidder quotes less than 3% of the value in Line item 1.1 as mentioned above, then for the purpose of payment ‘quoted amount’ (3rd year to 7th year) would be considered as follows: a. CAMC rate for the years which are less than 3% shall be made 3% and equivalent amount shall be deducted from the quoted rate in Line Item 1.1
Charges for CAMC during 3rd year of Operation (after 2 years of free warranty)
Charges for CAMC during 4th year of Operation
Charges for CAMC during 5th year of Operation
Charges for CAMC during 6th year of Operation
Charges for CAMC during 7th year of Operation
Bidder Name
Amount in Words
Suyash Equipments Pvt. Ltd.
EPC PERFECT PRIVATE LIMITED
Aquachem Enviro Engineers Pvt Ltd
EPC PERFECT PRIVATE LIMITED
Aquachem Enviro Engineers Pvt Ltd
EPC PERFECT PRIVATE LIMITED
Aquachem Enviro Engineers Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .