Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.2 L+₹25,456.41 (1.21%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest | |
| 3 | L3₹21.3 L+₹33,941.88 (1.62%)Rejected-Finance | L3 | Rejected-Finance 3rd lowest |
Tender Value
₹23.2 L
EMD Value
₹46,500
Closing Date
9 Dec 2021, 5:00 pmClosed
Executive Engineer Chamba Division HPPWD Chamba
Executive Engineer Chamba Division HPPWD Chamba
Construction of link road to village Rundega Km. 0/0 to 1/500 Formation cutting work in Km. 0/760 to 1/165)
2021_PWD_54291_2
No.PWC-WA-II-l- 10871-970 dt. 22.11.2021
Open Tender
Civil Works
Item Rate
90 days
chamba
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
₹46,500
21 Jul 2022
3 Dec 2021
10 Dec 2021
3 Dec 2021
9 Dec 2021
3 Dec 2021
Amount
Excavation in hilly areas in all heights and depths and in all kinds of soil by manual/mechanical means including saturated soil comprising of ordinary soil, ordinary rock ,soft rock ,hard rock chiseling, wedging out rock(where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the lines, grades, width, cutting and trimming of side slopes and levels as shown on the drawings and as directed by Engineer-in-Charge at site, according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same within in all leads and lifts in acquired road width and transportation of un-useful materials for filling in roadways camber ,embankments for grade improvements and disposal of all surplus materials to approved dumping sites through all modes of transportation including head load or animal transport or mechanical means alongwith its leveling fine dressing and carriage of machineries ,materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and/ labour if required.All useful materials such as stones, shingle aggregate and slates etcetera shall be sorted out and stacked in proper stack. Recovery of stones to the tune of 1536.05 cubic metre quantity @ Rs. 300/- only ( at the rate of rupees three hundred ) only of per cubic metre shall be effected from the contractor’s running bills on pro-rata basis as per actual quantity executed. Any loss to the public/ private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases.
KIRAN KUMAR
ANKUSH KHANNA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .