Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
23 Oct 2024, 2:00 pmClosed
SE MI NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle BM Division Unit I 600MW Boiler Annual overhaul of Air Pre Heater A pass
2024_EB_491857_1
CE NCTPS II SE M I O M 189 2024 25
Open Tender
Miscellaneous Works
Works
40 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
Yes
20 Nov 2024
8 Oct 2024
24 Oct 2024
8 Oct 2024
23 Oct 2024
8 Oct 2024
Amount
Charges for checking and cleaning of APH main gear drive unit including decoupling of APH drive from motor, dismantling of fluid coupling, draining of gear box lube oil from gear box, opening of gear box inspection doors and bottom pinion door, cleaning, inspection and Checking of all components inside the gear box and pinion, checking the tapper lock bush, root gap and bottom gap of pinion and pin rack, and grinding the bur projected on bottom surface of the pinion and renewal of lubricant oils and assembly the same. Including cost of consumables and T&P’s.
Charges for checking of Guide bearing, the work includes draining of lube oil from bearing, removal of lube oil inlet and outlet pipe lines from guide bearing housing, removal of guide bearing housing cover, checking and correcting the guide bearing level, providing necessary lock cleaning and flushing of guide bearing, inspection of guide bearing, checking and correcting the level of guide bearing and renewal of new oil and assembly the same including cost of consumables and T & P’s etc.
Charges for dismantling the APH lube oil coolers from bed, removing the internal copper tube assembly, cleaning, servicing, checking and plugging the defective tubes and testing of cooler by hydraulic testing method and reassembling. Including cost of consumables and T&P’s.
Charges for complete overhauling of manhole doors. Including cost of consumables and hire charges for T&P’s.
Charges for providing of scaffolding / temporary platform below the APH inside primary, secondary air duct, flue gas duct side of the APH for renewal of rotor angle, 'T' bar, By pass & CE radial seal setting and removal of scaffolding after completion of renewal work. Including cost of consumables and T&P’s.
Charges for removing the cover of support bearing, cleaning of sump, flushing, rinsing, inspection of internals, overhauling of lubricating lines, checking support bearing levels and providing covers etc in B pass. Including cost of consumables & hire Charges for T & P's.
Charges for checking the rotor level by master level and correcting by loosening / tightening of rotor lock bolt, further providing necessary locking arrangements for rotor, alignment of radial sector plates on both hot and cold end sides and setting of seal clearance by loosening of all radial and By pass seals,fixing of straight edge, removing the bolts and lock nuts By gas cutting, renewal of worn out and damaged radial and by pass seals and refixing of all seals and setting the required seal clearance and tack welding of sector plates & final alignment including cost of consumables and T&P’s.
Charges for loosening and dismantling the cold end / hot end all axial seals, removing the bolts and lock nuts by gas cutting & adjusting the Axial seal plate, the gap between Axial seal plate to sector plate, renewal of worn out and damaged axial seals and refixing of all seals and setting the required seal clearance and tack welding of sector plates and final alignment including cost of consumables and T&P’s
Charges for removal of fluid coupling, half multi disc, out put half coupling, damaged worn-out oil seals from the APH gear box and fixing of new oil seal and assembling of all dismantled components. Including cost of consumables and T&P’s.
Charges for removal of coupling half multi disc oil seals, damaged worn-out overrunning clutch/shaft of APH for the main gear box fixing of new or overhauled clutch/reconditioned shaft, assembling of all dismantled components, aligning, commissioning charges inclusive of consumables and T&P’S.
Charges for removal and refixing of support bearing water shield and air sealing ring including cost of consumables & T & P’s.
Charges for reconditioning of the sector plate surfaces by Grinding the high spots & burrs, building of metal by welding in dents and then grinding to get plain surface keeping in position inside the Air Pre Heater. Including cost of consumables and T&P’s.
Charges for Complete overhaul of APH soot blower gear box. Including cost of oil seal & bearings, consumables and T&P’s.
Charges for chipping, breaking and removing of refractory super ceramic packing, graphite rope of Stationary spool retainer ring, dismantling & removal of worn out sealing ring cover cutting, machining fixing new sealing ring Welding grinding, reconditioning of Stationary spool retainer ring in Worn-out portions, reassemble of all Components cutting bending, fabrication & Fixing of guide bearing oil flow Inspection door & breather in cover.
Charges for removal of accumulated ash in ECO outlet to APH inlet area, centre section area, APH inner casing area, SCAPH area of APH A side
Charges for dismantling of Air motors / inspection the lubricating oil for internals, vanes, bearings and reassembling works. Including cost of consumables and T&P’s.
Overhauling of APH lub oil pumps and its valves for support bearing and guide bearing. This work involves dismantling , cleaning, inspection of bearing, gears, interanls and replacement of the same if required the reassembling and alignment works etc., including cost of consumables and T & P'S Including cost of consumables and T&P’s.
Charges for cleaning, complete inspection and water washing of SCAPH A pass and attending minor defects if any. Including cost of consumables and T&P’s.
Charges for cleaning & painting of two coats of enamel paint over Gearbox Drive, Guide bearing & Support bearing Lube oil system and its structures. Including cost of paint, labour, consumables and T&Ps.
Charges for water washing of air preheater. including cost of consumables and T&P's
Consumables for overhauling of APH - Door rope 20mm square size
Consumables for overhauling of APH - Oil seals for gear box cover
Consumables for overhauling of APH - Kawool blanket super ceramic fibre blankets
Consumables for overhauling of APH - Special type 'O' ring for LOP cooler
M/S.KSM Engineering (BID ID -1170880)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .