| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.4 LAccepted-Finance | ₹11.4 L | 1 | Accepted-Finance 1 |
| 2 | 2₹11.8 L+₹38,038.44 (3.33%)Rejected-Finance 68 SREERAMPUR GARIA KOLKATA 700084 | KOLKATA | KOLKATA | WEST BENGAL | 700084 | ₹11.8 L+₹38,038.44 (3.33%) | 2 | Rejected-Finance 2 |
| 3 | 3₹12.5 L+₹1.1 L (9.78%)Rejected-Finance 303 B D H ROAD KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | ₹12.5 L+₹1.1 L (9.78%) | 3 | Rejected-Finance 3 |
Tender Value
₹11.4 L
EMD Value
₹23,000
Closing Date
6 Apr 2026, 11:00 amClosed
Executive engineer (Uttaran services)
1, Hogg. Street, Hogg Building, 3rd Floor, Kolkata - 700087
DEVELOPMENT OF PASSAGE BY C.C NEAR 100/20, 93/2/4 ETC. JIADERGOTE AND ITS SURROUNDING SLUM AREA IN WARD NO- 142,BOROUGH-XVI.
2026_KMC_1020174_1
KMC/US/HQ/142/25-26/264
Open Tender
CIVIL WORKS
Percentage
120 days
WD-142
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹23,000
8 Jul 2026
11 Mar 2026
8 Apr 2026
11 Mar 2026
6 Apr 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) | 50.54 | CUBIC METER | 89.9 | ₹4,543.6 |
| 2 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 557.04 | SQUARE METER | 361 | ₹2,01,091.67 |
| 3 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials. (a) In 1:4 proportion. | 57.29 | CUBIC METER | 5,484.86 | ₹3,14,231.06 |
| 4 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019) | 0.59 | CUBIC METER PERCENT | 1,31,714 | ₹77,807.99 |
| 5 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) ( c) (ii) With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth. | 1.76 | CUBIC METER PERCENT | 35,541 | ₹62,410 |
| 6 | BUILDING WORKS(P) SOLING, EDGING AND METALLING??(3)Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction.(b) Brick-on-end edging (250 mm) depth. | 0.9 | METER | 8,913 | ₹8,021.7 |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety ( Ref :PWD (Bldg.)-2017, page-24 (item -4(a), consumption chart pg-B-60, sl-1 and Annexture-II , Format-A, 3rd Corrigenda & addenda p-10 dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 50.65 | CUBIC METER | 5,732.59 | ₹2,90,355.68 |
| 105 | Sub Total | - | - | - | - |
| 106 | GST 18% | - | Nos. | - | - |
| 107 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TF.pdf
Tender Documents • 0.31 MB
BOQ_2507527.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .