RequiredOEM Authorization Certificate Bid to RA enabled No Online UPS 5 KVA For Critical Infrastructures ( 2 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERIC Online UPS should support for critical infrastructures such as Data Centres
RequiredNetwork operating centres
RequiredSecurity operation centres
RequiredState and District centres
RequiredCommand and Control centre etc.
Requiredacross the Country to provide impetus to the e- Governnance services Yes * 1/7 e.g.Public food distribution
Requirede Way bill
RequiredCounseling
Requirede-Office
RequiredIVFRT etc.
Requiredservices under Digital India Programme On Line UPS Capacity/Battery back up time at full load/Minimum VAH 5 KVA/60 Minutes/8193 VAH 5 KVA/60 Minutes/8193 VAH Inverter Technology PWM with IGBT
Requireddouble conversion * Isolation transformer: Galvanic Isolation through inbuilt transformer at UPS output side Yes * Output wave form Pure sine wave * Country of origin for Inverter India * Noise level (1 meter distance from UPS) </= 55 dB * UPS shall have cold start facility Yes * Type of cool Air cooled * Parallel load sharing redundant operation with all accessories Yes * Installation and commissioning Yes Yes
RequiredNo INPUT Input AC Single Phase * In put Voltage Range 160 V to AC to 270 V AC * Input frequency range 50 Hz +/-6% Hz * Input power factor at full output load leading to unity with active power factor correction (APFC) >/=0.90 * Distortion (current) Less than 10% * UPS shall have DG set compatibility Yes * OUTPUT Out put voltage 230 V AC +/-1% Single Phase * Voltage regulation (Steady state) at No load to full load
Required0.6 lag to Unity PF
RequiredDuring +/-1% * 2/7 entire back up time
RequiredComplete input voltage range Frequency 50 Hz +/-0.5 % Hz * CONSTRUCTION Minimum thickness (in mm) of M.S.Sheet Enclosure for UPS duly powder coated 1.0 * UPS shall be free from workmanship defects
Requiredsharp edges
Requirednicks
Requiredscratches
Requiredburst
Requiredetc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional Yes * UPS enclosure's degree of protection as per IS:13947 (Part 1)/1993 latest IP21 * UPS shall have switches for: Mains ON/OFF MCB
RequiredBattery ON/OFF MCB/Fuse
RequiredInverter push button with reset Yes * Standard quality Out put terminals shall be provided for output connection Yes * UPS shall have static and manual by pass facility Yes * UPS shall be supplied with required rated power cable (Copper) 5 Meters * Total Harmonic Distrotion (THD) for 100% linear load < 3% * Total Harmonic Distrotion (THD) for 100% non-linear load < 5% * Operating temeprature 0 deg C to 40 deg C * Humidity Upto 95% non- condensing * Crest factor on full non- linear load Not less than 3:1 * Over all efficiency on >/=80% * 3/7 rated full load of 0.8 PF and 230 Volt
Required50 Hz AC output Inverter efficiency on rated full load of 0.8 PF and 230 Volt
Required50 Hz AC output >/=85% * UPS shall withstand Over load capacity - 110% for 2 Minutes * UPS shall withstand Over load capacity - 125% for 30 seconds * Load power factor 0.8 lagging to unity Yes * Transient response time (for 100% load change
Requiredoutput must remain within +/-4% and recovery) </-20 milli seconds * PROTECTION Short circuit protection Yes * Over load protection Yes * Over temperature protection Yes * In put low/high voltage control Yes * DC low/high voltage trip Yes * BATTERY Battery shall conforming to JISC:8702(Pt.I
RequiredII&III) latest Yes * Battery type SMF VRLA * Country of origin for Battery India * Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD 8 to 10 hours * Battery charger should be capable to charge battery on C10 rating Yes * VAH tolerance -1% of the defined capacity * Battery cutoff voltage Not less than 10.5 V * 4/7 during back up More than two battery banks should not be used in parallel in any configuration Yes * Batteries shall supply with With rack With moveable trolley
RequiredWith rack Meters and Indicators UPS shall have LCD meter to measure and monitor input votlage
Requiredoutput voltage
Requiredoutput current/load level in %
RequiredDC current/DC level in %
RequiredDC voltage
Requiredinput and output frequency Yes * UPS shall have indicators for Mains on
RequiredLoad on battery
RequiredInverter
RequiredBattery level
RequiredLoad level
RequiredInverter over load Yes * UPS shall have audible alaram for over temperature
Requiredmains failure
Requiredbattery low
Requiredinverter overload Yes * Management port: Preferably SNMP based with management Software Yes Yes
RequiredNo WARRANTY AND SERVICES Warranty for UPS (on site comprehensive warranty) (in years) 3 3
Required4
Required5 Warranty for battery (replacement warranty) (in years) 3 2
Required3 After sales and complaint service Within 7 days * PAN India service support on 24 x 7 basis Yes * AMC support available after 5 year warranty Yes * Quarterly preventive maintenance available Yes * Manufacturer shall provide and support for instllation
Requiredcommissioning
Requiredspares
RequiredYes * 5/7 technical support all over India Availability of spares in close proximity (Spares should be easily available close to the site) Yes * CERTIFICATIONS ISO Certification Yes * CE Certification and marking Yes Yes
RequiredNo Damp Heat Test : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C
Requiredtwo cycles of (12+12) hours each 2007) Yes * Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes * Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes * Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes * As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable as on date Yes * As per Meity (Government of India) guidelines storage battery shall have valid BIS CRS certifications as applicable as on date Yes * All the test reports and certificates shall furnish by the supplier to the Yes * 6/7 buyer/consignee on demand * Bold specifications are the golden parameters.