Loading…
Loading…
Tender Value
₹80.2 L
EMD Value
₹1.6 L
Closing Date
8 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ELECTRICAL
15 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where: V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three nancial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared / audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-15 (Annexure-VIB), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant / Certificate from Chartered Accountant duly supported by Audited Balance Sheet
The tenderers must submit the copy of valid Electrical contractor license along with their offer. Offer shall rejected be summarily, if tenderer does not have valid Electrical contractor license on the name of an individual / Proprietor / Partner / firm issued by the State / Central government.
T h e tenderer must have successfully completed any o f t h e following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than t h e amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- "Design, supply, erection testing & commissioning of 50Hz, single phase 25KV AC OHE". (Ref: Pr. CEE/NR's Letter No. 181-Elect/TRD/189/Pt.II, dated 29.07.2021)
34 conditions · 16 needing a document upload
Bid Security: Tenderer (s) may please note that offers received without Bid Security either in cash through e-payment gateway or as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents (as per Annexure- 21) valid for a period of 90 days beyond the bid validity period, will be considered as incomplete & invalid offer and for which contractor shall have no claim on Railway.
Following documents shall be submitted by the tenderer: (A)SOLE PROPRIETOR SHIP FIRM: (i) Undertaking that he is not blacklisted / debarred by Rlys/other Ministry/Deptt of Govt of India from participation in tender on date of bid opening, either in individual capacity or as a member of partnership firm or JV in which he was/is a partner/member. Concealment/wrong information in regard to above shall make the contract liable for determination under Clause62 of GCC. (B) HUF: a. Copy of notarized affidavit on Stamp Paper declaring that he who is submitting tender on behalf of HUF is in position of Karta of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. b. Undertaking that the HUF is not blacklisted or debarred by Rlys/any other Ministry/Deptt of Govt of India, either in individual capacity or as a member of partnership firm or JV in which HUF was/is a partner/member. (C) PARTNERSHIP FIRM: (i) Notarized copy of partnership deed. (ii)Notarized or registered copy of Power of Attorney in favor of the individual to tender for the work, sign agreement etc and create liability against the firm. (iii)Undertaking by all partners of partnership firm that they are not blacklisted/debarred by Rlys/any other Ministry/Deptt of Govt of India from participation in tenders/contracts as on date of bid opening, either in their individual capacity or in any firm in which they were/are partners. (iv)All details of Firm must be provided in Annexure- 10. (v)Complete details as perAnnexure-17B. (D) JOINT VENTURE (JV): APPLICABLE ONLY FOR WORKS COSTING MORE THAN Rs.10.00 Cr. Not applicable for this tender. (E) Company registered under Companies Act-2013: Tenderer must submit/upload tender along with following documents: (i) Copies of MOA (Memorandum of Association)/AOA (Articles of Association) of company. (ii) Copy of Certificate of Incorporation (iii) Copy of Authorization/Power of Attorney issued by the Company (backed by Resolution of Board of Directors) in favor of the individual to sign tender on behalf of company and create liability against the company. (iv) Undertaking that Company is not blacklisted/debarred by Rlys/any other Ministry/Deptt of Govt of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which the Company was/is a partner/member. (F) LLP (Limited Liability Partnership) Firm under LLP Act-2008: Tenderer shall submit along with tender: (i) Copy of LLP Agreement (ii) Copy of Certificate of Incorporation (iii)Copy of Power of Attorney/Authorization issued by LLP in favor of individual to sign tender on behalf of LLP and create liability against LLP. (iv) Undertaking that LLP is not blacklisted/debarred by Rlys/any other Ministry/Deptt of Govt of India from participation in tender on the date of bid opening, either in individual capacity or as a member of JV in which the LLP was/is a member. (G) Registered Society & Registered Trust: Tenderer shall submit: (i) Copy of Certificate of Registration. (ii) copy of Deed of Formation. (iii) Copy of Power of Attorney in favor of individual to sign tender documents and create liability against the Society/Trust. (iv) copy of Rules & Regulations of Society. Note: The offers received without proper Power of Attorney shall be considered in-completed and rejected summarily.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer shall study the Indian Railway General Conditions of Contract Regulations for Tenders & Contracts (GCC)- April'2022 or latest along with tender documents before submission of the tender.
The tenderer shall submit all the requisite documents along with tender offer. Tender offer without these documents shall not be considered. "No post tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenders shall be treated as NULL & Void". To assist in the examination, evaluation and comparison of offers received, the Railway may at their discretion, ask any Tenderer for clarification on attached document with their Tender. The request for clarification and the response shall be in writing or by FAX but no change in the price or substance of the Tender shall be sought, offered or permitted. In case no credentials enclosed or statement to that effect is mentioned, the identity of working contractor of division shall be taken as fresh.
Period of Completion : The entire work is required to be completed in all respect within specified period from the date of issue of the letter of acceptance. The contractor shall maintained steady and regular progress to the satisfaction of the Sr.DEE/TR/JAT or his authorized representative and to ensure that the work will be completed in all respect within the stipulated time, failing which action may be taken by the Railway Administration in terms of clause 17 and clause 62 of the General Conditions of contract (GCC)- April'2022 or latest.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected. NOTE: (i) Copy of GCC of April'2022 is uploaded with NIT as ready reference of Tenderers. (ii) The offers received without proper Power of Attorney shall be considered in-completed and rejected summarily.
The rates quoted by the bidder are to be inclusive of all charges and all taxes levied by the Union of India, State Government and Local Bodies etc., from time to time including Surcharge except GST. However, GST @ 18% or applicable on all items of Schedule- 01, 02 & 03 and GST @ 05% or applicable on all items of Schedule- 04 applicable as per Extant Rules shall be paid extra as per Schedule-05.
Night working : Though normally no work is carried out in night i.e., from sun set to sun rise the progress of the work if not coming up to the time schedule laid down in clause above the Engineer-in-charge can order for night working by the contractor and the contractor shall make all arrangements for adequate lighting and safety precautions etc., for night working.
Contractors will have to upload details of their LOAs, engaged workmen, wage payment details, PF/ESI details, bonus details etc., on website www.shramikkalyan.indianrailways.gov.in on monthly basis. (Railway Board's letter No. 2018/CE-I/CT/4 dated 17.10.2018)
Guarantee : The tenderer shall guarantee the equipments/installations for satisfactory performance for a period of 12 months or mentioned in special condition / technical specifications or as mentioned by the manufacturer, which ever in higher from the date of commissioning against any defect. The contractor should promptly attend complaint and replace/repair the defective equipments/parts free of cost promptly and satisfactorily. The equipments/parts so replaced by the contractor, shall be further guaranteed for a period of 12 months or mentioned in special condition / technical specifications or as mentioned by the manufacturer for satisfactory service from the date of such replacement.
The tenderers shall keep their offer open for 60 days (Sixty days).
The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the contractor has complete the work in all respects satisfactorily. The Security Deposit shall also be released based on 'Completion Certificate' issued by Consignee / Engineer In- charge of the work to the contractor, submission of authentic documents that firm has paid GST as applicable by the extant rule and on completion of guarantee / warrantee period of ONE Year or as stipulated in Tender Documents.
Ambiguous and incomplete (i.e. not filling the rates or controversial rates and not attaching all the required documents) offer may be summarily rejected.
Any typographical error shall not be construed to be benefit of the contractor; in such cases the interpretation and decision of Sr. DEE/TR/JAT shall be final and binding upon the tenderer.
Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available ON IREPS portal LIKE net banking, debit card, credit card etc Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc are not allowed.
For verification of documents tenderer has to submit the details of issuing authority and organization like-Postal address, Name, Designation, Office phone number, Mobile no. and email ID of concerned person.
TRD work in c/w Interlocking of 12 Nos Non-Interlocked LC gates having TVU 20000 and 50000 over Jammu Division
03-TRD-JAT-2026-27~NR
03-TRD-JAT-2026-27
Open
Works - General
6 Months
Jammu, Jammu And Kashmir
₹0
₹1.6 L
17 Aug 2026
17 Aug 2026
25 Aug 2026
178 items across 5 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 65,76,002.94 | ||
| — | 46.00 | — | — | ||
| Supply of Concrete for foundation and plinth in other than hard & rocky soil | — | — | — | 3,10,018.84 | |
| — | 35.00 | — | — | ||
| Erection of Concrete for foundation and plinth in other than hard & rocky soil | — | — | — | 57,853.25 | |
| — | 11.00 | — | — | ||
| Erection of Concrete for foundation and plinth in hard & rocky soil | — | — | — | 71,150.2 | |
| — | 5.49 | — | — | ||
| Supply of galvanized steel fabricated masts / other supporting structure | — | — | — | 7,30,938.87 | |
| — | 5.49 | — | — | ||
| Erection of galvanized steel fabricated masts / other supporting structure | — | — | — | 54,032.36 | |
| — | 0.90 | — | — | ||
| Supply of fabricated and galvanized steel work (SPS) other than mast with necessary components | — | — | — | 1,22,565.11 | |
| — | 0.90 | — | — | ||
| Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components | — | — | — | 8,156.43 | |
| — | 11.00 | — | — | ||
| Supply of copper jumper wire | — | — | — | 82,037.12 | |
| — | 11.00 | — | — | ||
| Erection of copper jumper wire | — | — | — | 8,050.68 | |
| — | 11.00 | — | — | ||
| Supply of 9 tonne suspension insulator assembly including all accessories | — | — | — | 65,025.84 | |
| — | 11.00 | — | — | ||
| Erection of 9 tonne suspension insulator assembly including all accessories | — | — | — | 13,477.53 | |
| — | 15.00 | — | — | ||
| Supply of single earth electrode with earth pit complete as per RDSO Drg No. ETI / OHE / P / 7020 or latest | — | — | — | 62,059.05 | |
| — | 11.00 | — | — | ||
| Erection of single earth electrode with earth pit complete as per RDSO Drg No. ETI / OHE / P / 7020 or latest | — | — | — | 14,778.17 | |
| — | 24.00 | — | — | ||
| Manufacturing supply of Retro Reflective type structure Number plate as per RDSO drg. No.ETI / OHE / P / 7503 or latest along with all fixing arrangement. | — | — | — | 16,230.72 | |
| — | 24.00 | — | — | ||
| Erection / Fixing of Retro Reflective type structure Number plate as per RDSO drg. No.ETI / OHE / P / 7503 or latest along with all fixing arrangement. | — | — | — | 2,043.12 | |
| — | 4.00 | — | — | ||
| Supply of material without insulators for termination of OHE conductor | — | — | — | 28,904.72 | |
| — | 4.00 | — | — | ||
| Erection of material for termination of OHE conductor | — | — | — | 4,072.24 | |
| — | 6.00 | — | — | ||
| Supply of Structure Bonds | — | — | — | 5,376.48 | |
| — | 6.00 | — | — | ||
| Erection of Structure Bonds | — | — | — | 1,330.8 | |
| — | 4.00 | — | — | ||
| Supply of Transverse (cross rail, inter-track, Z & special type) bonds | — | — | — | 4,203.76 | |
| Erection of Transverse (cross rail, inter-track, Z & special type) bonds | — | 4.00 | — | — | |
| — | 150.00 | — | — | ||
| Supply of earth bus | — | — | — | 34,209 | |
| — | 150.00 | — | — | ||
| Erection of earth bus | — | — | — | 12,055.5 | |
| — | 2.00 | — | — | ||
| Supply of Anti-Creep with component | — | — | — | 73,157.7 | |
| — | 2.00 | — | — | ||
| Erection of Anti-creep with component | — | — | — | 6,461.5 | |
| Erection of Anti-creep with component | — | 0.04 | — | — | |
| — | 100.00 | — | — | ||
| Supply of Large Copper Jumper wire 160 Sqmm | — | — | — | 1,96,061 | |
| Re-painting on existing OHE structures with water proof yellow enameled paint as per explanatory notes(Rate included material & erection) | — | 2.00 | — | — | |
| Re-writing on existing OHE structures as per explanatory notes(Rate included material & erection). | — | 2.00 | — | — | |
| — | 40.00 | — | — | ||
| Supply of various types 25KV caution Board / Plates as per explanatory Notes | — | — | — | 14,970.8 | |
| — | 40.00 | — | — | ||
| Erection of various types 25KV caution Boards / plates as per explanatory Notes | — | — | — | 3,560.8 | |
| — | 40.00 | — | — | ||
| Supply of various types of 25KV Danger Boards / plates as per explanatory notes | — | — | — | 20,187.6 | |
| — | 40.00 | — | — | ||
| Erection of various types of 25KV Danger Boards / plates as per explanatory notes | — | — | — | 2,565.2 | |
| — | 20.00 | — | — | ||
| Cost of 4 Nos. 12mm dia GI nuts & bolts 300 mm long (fully threaded) with necessary washer, spring washer for different OHE Mast / Portals etc including transportation and all taxes | — | — | — | 4,972.2 | |
| — | 20.00 | — | — | ||
| Cost of GI backing angle for mounting arrangement size 40x40x5x450mm (4 Nos.) including transportation and all taxes | — | — | — | 8,507.4 | |
| — | 1.50 | — | — | ||
| Handling, Leading, loading and Transportation charges for Railway supply material from different Railway sites and released material from different Railway sites, if any to concerned TRD Depot | — | — | — | 4,170.91 | |
| — | 13.00 | — | — | ||
| Supply of 10KVA, 25KV/240Volts Auxiliary Transformer (AT) confirming to RDSO Spec. No.ETI/PSI/15 (08/2003) or latest | — | — | — | 13,29,502.98 | |
| — | 11.00 | — | — | ||
| Erection, Oil filtration, testing & commissioning of 5/10/25 KVA, 25KV/240 Volts Auxiliary Transformer (AT) confirming to RDSO Spec.No. ETI/PSI/15 (08/2003) or latest | — | — | — | 68,456.3 | |
| — | 11.00 | — | — | ||
| Supply of 25KV Drop Out (D.O.) fuse switch assembly complete | — | — | — | 2,27,664.91 | |
| — | 11.00 | — | — | ||
| Erection of 25KV Drop Out (D.O.) fuse switch assembly complete | — | — | — | 16,979.71 | |
| — | 25.00 | — | — | ||
| Supply of copper strips of size 25mmx3mm for earthing of AT with masts | — | — | — | 13,884.5 | |
| — | 25.00 | — | — | ||
| Erection of copper strips of size 25mmx3mm for earthing of AT with masts | — | — | — | 2,857.25 | |
| — | 16.00 | — | — | ||
| Supply of Anti-climbing device for LT supply Auxiliary Transformer station | — | — | — | 12,495.52 | |
| — | 16.00 | — | — | ||
| Erection of Anti-climbing device for LT supply Auxiliary Transformer station | — | — | — | 2,695.36 | |
| — | 11.00 | — | — | ||
| Supply and fabrication of MS Split type Arcing Horns of size 14mm dia made of MS Galvanized Rod | — | — | — | 6,062.76 | |
| Fixing and commissioning of Arcing Horns on 25KV/240V ATs of 10/25KVA | — | 11.00 | — | — | |
| — | 20.00 | — | — | ||
| Supply of Cable Trench Cover | — | — | — | 31,921.4 | |
| — | 30.00 | — | — | ||
| supply of shock treatment chart | — | — | — | 45,641.7 | |
| — | 1000.00 | — | — | ||
| Bond painting with initial coating of red oxide & second layerof black enameled paint | — | — | — | 8,440 | |
| — | 1.00 | — | — | ||
| Earth auger as per Latest RDSO Spec. | — | — | — | 12,000 | |
| — | 5.00 | — | — | ||
| Torque Wrench 25-135NM | — | — | — | 15,397.5 | |
| — | 20.00 | — | — | ||
| Disconnector Assembly suitable for 42KV outdoor surge arrestor of class-3 type tested as per attached RDSO Spec. No. TI/PSI/GAPLA/POLICY/13, dated 17.10.2013 and 08.08.2013 RDSO MI No.TI/MI/0048 and TI/SPC/PSI/MOGTLA /0101(02/2015) or Latest | — | — | — | 50,340 | |
| — | 100.00 | — | — | ||
| Insulation Bond Sleeve suitable for Bond strip size 40mm X 6mm as per latest RDSO spec. and Drg. | — | — | — | 10,500 | |
| — | 2.00 | — | — | ||
| Goods, Retro reflective LOWER PANTOGRAPH BOARD as per RDSO spec. No. ETI/OHE/33A (12/97) | — | — | — | 1,531.36 | |
| — | 3.00 | — | — | ||
| OHE Height and stagger gauge equipped : As per latest RDSO spec. | — | — | — | 4,81,659.99 | |
| — | 2.00 | — | — | ||
| LLMG : Supply, Installation & commissioning of Live Line Monitoring Gauge (LLMG) supported with Android application for height and stagger measurement as per RDSO specifications No. RDSO/TI0LKO(OHE)/57/2020 | — | — | — | 2,54,666.66 | |
| — | 2.00 | — | — | ||
| Gearless Hand operated Pulling and Lifting Machine (Tirfor)supplied complete with Telescopic operating Handle- Lifting Capacity- 0.8Ton & Pulling Capacity 1.25Ton with 20Mtrs length of Wire rope tted with D Shackle at one end and tapered & fused at the other end as per RDSO Spec.No: TI/SPC/OHE/TOOLPL/0992 | — | — | — | 19,000 | |
| — | 2.00 | — | — | ||
| Supply of UNIVERSAL COME ALONG CLAMP (MS steel body) suitable for copper conductor of size 65 sq.mm to 150 sq.mm come along clamp shall conform to IS:2265/2062, jaw for come along clamps M.S. shall conform to IS:2062 with hardness load capacity of 3 Ton | — | — | — | 1,789 | |
| — | 4.00 | — | — | ||
| — | — | — | 3,574 | ||
| — | 2.00 | — | — | ||
| — | — | — | 2,536.82 | ||
| — | 2.00 | — | — | ||
| — | — | — | 4,259.84 | ||
| — | 2.00 | — | — | ||
| — | — | — | 1,639.54 | ||
| — | 2.00 | — | — | ||
| Double Ply Polyester Webbing Slings, 10 m Load Capacity 5 tonne | — | — | — | 5,636.72 | |
| — | 1.00 | — | — | ||
| Inclinometer :Digital inclinometer, digital level and protractor with a magnetic bottom similar to loram part No. 166044 with V-groove, resolution 0.1 degree and accuracy of 0.2 degree. The device calibration can easily be checked on any plain surface. As per latest RDSO Spec. | — | — | — | 13,366.33 | |
| — | 1.00 | — | — | ||
| Supply , Installation & Commissioning of Vacuum Circuit Breaker Analyzer VCB Testing Kit with Accessories as per Latest RDSO Specifications. | — | — | — | 3,93,900 | |
| — | 1.00 | — | — | ||
| Supply, Installation, Testing & Commissioning of IP Based Video surveillance system for Rolling Stock of Indian Railways for Tower Wagon (8 & 4 wheeler) excluding RDAS as per RDSO Spec.No. RDSO/SPN/TC/106/2025, VERSION 3.1 or latest | — | — | — | 3,77,000 | |
| — | 1.00 | — | — | ||
| Acidity Testing kit for transformer oil. | — | — | — | 1,350.67 | |
| — | 1.00 | — | — | ||
| Portable Oil filtration machine(NTPC), Flow Rate 900 (LPH) | — | — | — | 1,95,833.33 | |
| — | 1.00 | — | — | ||
| DGA : Supply , installation and Commissioning of Portable Dissolve Gas analyzer along with accessories | — | — | — | 8,06,000 | |
| — | 1.00 | — | — | ||
| Cordless Contact wire kink remover tool powered by 18V, 5.0Ah Li-Ion battery, Suitable for 107sqmm contact wires | — | — | — | 49,500 | |
| — | 3.00 | — | — | ||
| DIGITAL SPRING BALANCE OF CAPACITY 50KG | — | — | — | 3,197.46 | |
| — | 1.00 | — | — | ||
| Digital Inclinometer, Digital Level and Protractor. As per latest RDSO Spec. | — | — | — | 14,566.67 | |
| — | 3.00 | — | — | ||
| Battery Operated Cordless Impact Wrench (SOCKET 7-32 mm) (Torque Wrench) | — | — | — | 26,450.01 | |
| — | — | — | 1,83,724.17 | ||
| — | 5.49 | — | — | ||
| Erection of galvanized steel fabricated masts / other supporting structure | — | — | — | 54,032.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
0GCC-April2022.pdf
ATTACHMENT
1st Correction slip GCC 2022
ATTACHMENT
2nd Correction slip GCC 2022
ATTACHMENT
3rd Correction slip GCC 2022
ATTACHMENT
4th Correction slip GCC 2022
ATTACHMENT
5th Correction slip GCC 2022
ATTACHMENT
6.AdvanceCorrectionSlipNo.6.pdf 6th Correction slip GCC 2022
ATTACHMENT
7th Correction slip GCC 2022
ATTACHMENT
8th Correction slip GCC 2022
ATTACHMENT
9th Correction slip GCC 2022
ATTACHMENT
10th Correction slip GCC 2022
ATTACHMENT
11th Correction slip GCC 2022
ATTACHMENT
Clarification for Annexure V of GCC
ATTACHMENT
Mandatorydocuments03-TRD.pdf Mandatory documents
ATTACHMENT
Tender Document 03 TRD
ATTACHMENT
1.AmendementinGCCofApr-2022.pdf
ATTACHMENT
2.Amendement-2GCCApr-2022.pdf
ATTACHMENT
3.Amendment-3GCCofApr-2022.pdf
ATTACHMENT
4.Amendment-4GCCofApr-2022.pdf
ATTACHMENT
5.Amendment-5GCCofApr-2022.pdf
ATTACHMENT
6.AdvanceCorrectionSlipNo.6.pdf
ATTACHMENT
7.CorrectionSlipNo7GCCofApr-2022.pdf
ATTACHMENT
8.CorrectionSlipNo8GCCofApr-2022.pdf
ATTACHMENT
9.CorrectionSlipNo9GCCofApr-2022.pdf
ATTACHMENT
10.CorrectionSlipNo10GCCofApr-2022.pdf
ATTACHMENT
11.CorrectionSlipNo11GCCofApr-2022.pdf
ATTACHMENT
13.GCCClarificationAnnexure-V.pdf
ATTACHMENT
Mandatorydocuments03-TRD.pdf
ATTACHMENT
Tenderdocument03-TRDJAT2025-26.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].