| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 CrAccepted-AOC | ₹8.5 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹9.0 Cr+₹55.5 L (6.57%)Rejected-AOC | ₹9.0 Cr+₹55.5 L (6.57%) | L2 | Rejected-AOC Not Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹18.8 L
Closing Date
24 Sept 2025, 2:00 pmClosed
Executive Engineer
Executive Engineer Const Divn PWD B and R Barnala
Modernization of 20 Nos Rural Link Roads under the Scheme Special Assistance to State for Capital Investment 2025-26 MC Dhanaula and Tapa (G-2) in District Barnala (Including Maintenance Under the Scheme Special Assistance of States for Capital Inve
2025_CEPW_149331_1
Bid no. 22 dated. 08.09.2025 (MC Dhanaula and Tapa (G-2) 20 Nos Roads)
Open Tender
Civil Works - Roads
Percentage
240 days
Barnala
Please refer Tender Documents
12 documents required · 12 mandatory
₹30,000
₹18.8 L
11 Nov 2025
9 Sept 2025
24 Sept 2025
9 Sept 2025
24 Sept 2025
9 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Aspal kalan to Badra Road to smadh | - | - | - | - |
| 2 | Compaction of earth work & Prepration of Sub grade including loosing,leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level camber,watering,rolling with road roller, compacting the bed to achieve minimun dry density as given in Table 300-2 as per technical clause 305 of MORT&H specifications (in case of link roads earth work to be done by villagers.) as per CSR 24.4(c) | 95.14 | Sqm | 1 | ₹95.04 |
| 3 | Construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORD technical specifications CSR-24.7 | 0.6 | Cum | 0.8 | ₹0.48 |
| 4 | Providing, laying, spreading and compacting stone aggregates of Grading I to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications (without screening for low volume Roads/undersigned) 24.11(ii) | - | Cum | 0.4 | - |
| 5 | Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications (without screening for low volume Roads/undersigned) 24.12(ii) | - | Sqm | 0.8 | - |
| 6 | Making 50 mm x 50 mm furrows 45 degree to the center line of the road and at one metre interval in the existing bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead complete as per technical (Full surface area will be measured for payment) CSR 24.10 | 305 | sqm | 1 | ₹304.7 |
| 7 | Dismantling brick edging as per CSR 8.5 (i) | - | cum | - | - |
| 8 | Providing and fixing brick on end edging as per CSR 24.15 | - | mtr | 0.6 | - |
| 9 | Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications (without screening for low volume Roads/undersigned) 24.12(ii) | 0.8 | cum | 0.8 | ₹0.64 |
| 10 | Credit of materials (from Strengthening)
Brick bats | - | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_302084.xls
BOQ • 0.60 MB
SBD.pdf
Tender Documents • 31.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .