Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAccepted-AOC | ₹7.4 Cr | L1 | Accepted-AOC Accepted, after the financial bid evaluation. |
| 2 | L2₹7.4 CrRejected-Finance | ₹7.4 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Under Cl. 4.4Aa, 4.6 of section 2 of SBD |
| 4 | Rejected-Technical | - | - | Rejected-Technical Under Cl.4.7 ii and 4.4 B b i of Section 2. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Under CL. 4.7 ii and 4.6 of section 2 |
Tender Value
Refer Docs
EMD Value
₹15.0 L
Closing Date
26 Mar 2024, 10:00 amClosed
EE RWD POMA, YUPIA on behalf of HE, Governor of AP
O/o Executive Engineer, Rural Works Division, Papum Poma Yupia, Govt. of Arunachal Pradesh
The RCC long span bridge of 72 m span (3x 24m) of Road from Upper Jote to Tapioso.
2024_CEAR_132795_1
AR070701MRL07A
Open Tender
Civil Works - Bridge Construction
720 days
At Chainage 1.010km of road from Upper Jote
Please refer Tender documents.
9 documents required · 9 mandatory
₹15,000
Empowered Officer, ARRDA, Itanagar
₹15.0 L
O/o Executive Engineer, RWD,
22 Aug 2024
9 Mar 2024
26 Mar 2024
9 Mar 2024
26 Mar 2024
16 Mar 2024
15 Mar 2024
Amount
SH: Earthwork in Foundation
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil. Upto 3 m depth.
SH: Substructure
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. ii.P.C.C grade M 15 (i) Nominal mix (1:2.5:5)
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. G. G RCC Grade M30. Case II Using Batching Plant, Transit Mixer and Concrete Pump.
Filling annular space around footing in rock as per technical specification Clause 1203.4.3. P.C.C grade M 15. Nominal mix 1:2.5:5
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. RCC Grade M30. Height upto 5m. Case II With Batching Plant, Transit Mixer and Concrete Pump.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8. I) Granular material
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
SH: SUPERSTRUCTURE
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. III. RCC. Grade M 30.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. C) RCC Grade M 30. Case II Using Batching Plant, Transit Mixer and Concrete Pump. (ii) For T-beam & slab, 25-35% of (a+b+c). (p) Height upto 5m
Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE pads providing sliding surfaces against stainless steel mating together with cast steel assemblies/ fabricated structural steel assemblies duly painted with all components
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
Drainage spouts complete as per drawing and technical specifications Clause 1209
SH: APPROACH
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211. i) Nominal mix (1:2.5:5)
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
SH: PROTECTION WORK
Providing and laying Pitching on slopes laid over prepared Filter media as per drawing and technical specifications clause 1302 I. Stone Boulder
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary Soil. (i) Upto 3m Depth
Providing and laying wire created boulder structures boulder size 22.5 cm to 45 cm having 25 kg average weight for each i/c dumping/laying in S.W.G. Wire mesh of 10 cm x 10 cm (woven diagonally) 4mm dia i/c packing with small size stone spalls and carrying of boulders from a lead of 50 mtr and lift up to 1.5 mtr i/c lying properly the mesh by cutting the mouth and hoisting of wire where felt necessary as per direction of Engineerin- Charge technical specifications Clause 1301. ( Based on SDB Rural Road Chapter- 14, Item No.14.2)
Seismic Arrestor
Painting of Structures
Total Routine Maintenance Cost
First Year
Second Year
Third Year
Fourth Year
Fifth Year
Construction Cost without GST
Add GST @ 18%
Total Construction Cost with GST
Ms North East Engineering Construction Agency
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid