Loading…
Loading…
Tender Value
₹96,100
EMD Value
₹1,922
Closing Date
3 Aug 2026, 6:00 pm
Executive Engineer REW Doda
Office of the Executive Engineer REW Doda
Constt of Foot Bridge at Chabote W.No3 Pyt Koti Block Ghat (PRIs Grant)
2026_RDPR_317165_39
e-NIT No 38 of REW Doda 2026-27 Dated.21.07.2026
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹1,922
22 Jul 2026
22 Jul 2026
4 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 5.4 | Cum | 592.9 | ₹3,201.66 |
| 0.0 | Dry Stone Filling (Plum) | 1.62 | Cum | 900 | ₹1,458 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.78 | Cum | 5,673.4 | ₹21,445.45 |
| 0.0 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.65 | Cum | 9,821.85 | ₹16,206.05 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 166.05 | Kgs | 123.2 | ₹20,457.36 |
| 0.0 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded. | 105.88 | Kgs | 138.2 | ₹14,632.62 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 17.09 | Sqm | 286.35 | ₹4,893.72 |
| 0.0 | Carriage of sand & Bajri | 7.27 | Cum | 1,124.32 | ₹8,173.81 |
| 0.0 | Carriage of stones | 1.62 | Cum | 698.68 | ₹1,131.86 |
| 0.0 | CIB (citizen information Board ) size 2'6"x3'6"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job) | 1 | Nos | 4,500 | ₹4,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1038545.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].