Loading…
Loading…
Tender Value
₹8.2 L
EMD Value
₹8,238
Closing Date
9 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
TOWN HALL, CHHATRAPATI SAMBHAJINAGAR
Repairing and Constructing UCR Retaining Wall At Aushadhi Bhawan, Chunabhatti, Moti Karanja Naala And Various Places In Zone No.02
2026_AMCA_1334895_1
CSMC/EE/ZONE02/2026/51
Open Tender
Civil Works
Percentage
90 days
TOWN HALL, CHHATRAPATI SAMBHAJINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
₹8,238
3 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. | 25 | M3 | 398.43 | ₹9,960.75 |
| 2 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete.(By manaual Means )a) Upto 1.50m lift | 25 | M3 | 250.59 | ₹6,264.75 |
| 3 | Excavation for foundation in hard murum and boulders including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete | 50 | M3 | 299.87 | ₹14,993.5 |
| 4 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. | 100 | M3 | 204.46 | ₹20,446 |
| 5 | Providing soling using 80 mm size trap metal I 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | 15 | M3 | 1,942.16 | ₹29,132.4 |
| 6 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand | 10 | M3 | 6,562.51 | ₹65,625.1 |
| 7 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete. | 30 | M3 | 5,987.62 | ₹1,79,628.6 |
| 8 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in superstructure including racking out joints when plastering is to be done / striking joints when noplastering is to be done on inside watering and scaffolding etc.complete.. | 56 | M3 | 6,521.31 | ₹3,65,193.36 |
| 9 | Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including scaffolding and curin etc. complete. | 250 | M2 | 196.15 | ₹49,037.5 |
| 10 | Providing ISI Standard Stoneware pipes including all taxes (central and local), inspection charges, railway freight, unloading from railway wagons, loading into trucks, transprt to departmental stores, unloading, stacking etc complete 250MM Dia | 5 | Rmt | 514.8 | ₹2,574 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_2283571.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .