Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.2 LAccepted-AOC NO 85 D OLD MARIAMMAN KOIL STREET EAST GATE THANJAVUR 613 001 | THANJAVUR | TAMIL NADU | 613001 | ₹51.2 L Quoted ₹52.3 L | L1 | Accepted-AOC AGREEMENT ACCEPTED. |
| 2 | L2₹53.3 LRejected-Finance NO 105 MELAPUDUVAYAL ROAD KEERANUR PUDUKKOTTAI 622 502 | PUDUKKOTTAI | TAMIL NADU | 622502 | ₹53.3 L | L2 | Rejected-Finance SECOND LOWEST TENDERER L3 |
| 3 | L3₹53.8 LRejected-Finance S 2 PERIYAR NAGAR RAJAGOPALAPURAM PUDUKOTTAI 622003 | PUDUKKOTTAI | TAMIL NADU | 622003 | ₹53.8 L | L3 | Rejected-Finance THIRD LOWEST TENDERER L3 |
| Sl No | Description | Qty | Unit | S SAMBASIVAM L1 | GL INFRA L3 | TST AND CO L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 23.75 | m3 | 265 ₹6,293.75 | 270 ₹6,412.50 | 267 ₹6,341.25 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 2 | m3 | 5,600 ₹11,200 | 5,696 ₹11,392 | 5,642 ₹11,284 |
| 3.00Brick work in following Cement Mortar 1:6 using best quality fly ash brick 230x110x75mm thick with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing,etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 3.01 | Foundation and Basement | 4.5 | m3 | 7,600 ₹34,200 | 7,681 ₹34,564.50 | 7,607 ₹34,231.50 |
| 3.02 | Ground floor | 7 | m3 | 7,600 ₹53,200 | 7,778 ₹54,446 | 7,704 ₹53,928 |
| 3.03 | First Floor | 1 | m3 | 7,800 ₹7,800 | 7,975 ₹7,975 | 7,899 ₹7,899 |
| 4.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1 | m3 | 1,750 ₹1,750 | 1,811 ₹1,811 | 1,794 ₹1,794 |
| 5.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental
officers. | 2.1 | m3 | 160 ₹336 | 164 ₹344.40 | 163 ₹342.30 |
| 6.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.5 | m3 | 730 ₹1,825 | 744 ₹1,860 | 737 ₹1,842.50 |
| 7.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 1 | m3 | 5,600 ₹5,600 | 5,696 ₹5,696 | 5,642 ₹5,642 |
Updated dates
Tender Value
₹51.2 L
EMD Value
₹35,700
Closing Date
10 Nov 2025, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Building Construction and Maintenance Circle, Thanjavur-1
Providing Fire Fighting arrangements in Renal block in Government Medical College Hospital at Pudukkottai
2025_PWD_618502_1
42-02-2025-2026
Open Tender
Civil Works - Buildings
150 days
Pudukkottai
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹35,700
27 Feb 2026
29 Oct 2025
11 Nov 2025
29 Oct 2025
10 Nov 2025
29 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
RENALCON.pdf
Tender Documents • 1.82 MB
BOQ_739307.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid