Executive Officer
Executive Officer Nagar Panchayat Lalgopalganj Prayagraj
Construction of drain on Jethwara road from Naga Baba than to in front of SBI bank in ward no 14
2026_DOLBU_1150400_1
Drain ward 14 Near Naga Baba Than
Open Tender
Civil Works
Percentage
45 days
Ward no14
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,658
A/c no 50199375957
₹3.1 L
19 May 2026
19 May 2026
10 Jun 2026
19 May 2026
10 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | Earth work in excavation by mechanical means (Hydraulic excavator) I manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. ..As per DSR 2.8.1 | 378 | Cum. | 191.32 | ₹72,318.96 |
| 1.002 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) dsr-2023 4.1.8 | 31.5 | Cum. | 5,006.82 | ₹1,57,714.83 |
| 1.003 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1 :1.5:3 (1 cement : 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) dsr-2023 5.1.2 | 168.76 | Cum. | 6,648.63 | ₹11,22,022.8 |
| 1.004 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars. dsr-2023 5.22.1 | 10,598 | Kg. | 78.72 | ₹8,34,274.56 |
| 1.005 | Centering and shuttering including strutting, propping etc. and removal of form for. Foundations, footings, bases of columns, etc. for mass concrete dsr-2023 5.9.1 | 1,406.25 | Sqm. | 288.23 | ₹4,05,323.44 |
| 1.006 | Supply and fixing of granite stone for inaugration including all cmpletion of work etc…. | 1 | No. | 10,000 | ₹10,000 |
| 1.007 | Cost of Photos High Quality Resolution with GPS Coordinate of site before start of work, work onging and after completion of work etc….complete | 1 | No. | 550 | ₹550 |
| 1.008 | GST | 1 | No. | 4,68,396.41 | ₹4,68,396.41 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
Nit15thwittmay.pdf
Tender Documents • 2.60 MB
BOQ_2154069.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .