Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
7 Sept 2022, 3:00 pmClosed
PR & CC
This Tender is for Civil, Electrical and Mechanical Jobs for development of new outlet as well as
22000382-HD-10157
22000382-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
₹2.1 L
7 Sept 2022
23 Aug 2022
7 Sept 2022
7 Sept 2022
24 Aug 2022 - 31 Aug 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SITE CLEARANCE | SITE CLEARANCE — Surface dressing of the ground including removing small plants, bushes ,vegetation (dia less than 4") and making surface levelled and disposal of rubbish outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge. | - | Square Meters |
| 2 | EXCAVATION IN EARTH UPTO | EXCAVATION IN EARTH UPTO — Excavation for foundation upto required depth below existing ground level up to 1.5m in any tyoe odf soil except hard rock. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. | - | Cubic Meters |
| 3 | EXCAVATION - 1.5 TO 3 M | EXCAVATION - 1.5 TO 3 M — Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH UPTO 3 M | - | Cubic Meters |
| 4 | EXCAVATION - 3 TO 4.5 | EXCAVATION - 3 TO 4.5 — Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN EARTH BETWEEN 3 TO 4.5 | - | Cubic Meters |
| 5 | EXCAVA SOFT ROCK UP TO | EXCAVA SOFT ROCK UP TO — EXCAVATION FOR FOUNDATION UPTO REQUIRED DEPTH BELOW EXISTING GROUND LEVEL UPTO 1.5 M. DEPTH IN SOFT ROCK BY CHISELLING/PNEUMATIC DRILLING OR BLASTING. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING, BACK FILLING AFTER THE CONSTRUCTION OF FOUNDATION, TRENCHES/PLINTH BEAM ETC. COMPACTING BY THE SIDE OF THE FOUNDATION AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING SPREADING, WATERING AND COMPACTION, COMPLETE. THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION WITH APPLICABLE RATE FOR DIFFERENT DEPTHS. EXCAVATION IN SOFT ROCK UPTO 1.5 MT. | - | Cubic Meters |
| 6 | EXCAVA SOFTROCK 1.5- 3.0 M 11355-INDORE RETAIL RO | EXCAVA SOFTROCK 1.5- 3.0 M 11355-INDORE RETAIL RO — EXCAVATION FOR FOUNDATION UPTO REQUIRED DEPTH BETWEEN 1.5 TO 3.0 MT IN SOFT ROCK AND EXCAVATION SHALL BE DONE BY CHISELLING/PNEUMATIC DRILLING OR BLASTING. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING, BACK FILLING AFTER THE CONSTRUCTION OF FOUNDATION, TRENCHES/PLINTH BEAM ETC. COMPACTING BY THE SIDE OF THE FOUNDATION AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING SPREADING, WATERING AND COMPACTION, COMPLETE. THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION WITH APPLICABLE RATE FOR DIFFERENT DEPTHS. EXCAVATION IN SOFT ROCK 1.5-3.0 MTS. | - | Cubic Meters |
| 7 | EXCAVA SOFT ROCK 3.0- 4.5 | EXCAVA SOFT ROCK 3.0- 4.5 — EXCAVATION FOR FOUNDATION UPTO REQUIRED DEPTH BETWEEN 3.0 TO 4.5 MTS IN SOFT ROCK AND EXCAVATION SHALL BE DONE BY CHISELLING/PNEUMATIC DRILLING OR BLASTING. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING, BACK FILLING AFTER THE CONSTRUCTION OF FOUNDATION, COMPACTING BY THE SIDE OF THE FOUNDATION AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING SPREADING, WATERING AND COMPACTION, COMPLETE. THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION WITH APPLICABLE RATE FOR DIFFERENT DEPTHS. EXCAVATION IN SOFT ROCK BETWEEN 3 TO 4.5. | - | Cubic Meters |
| 8 | EXCAVATION- HARD ROCK | EXCAVATION- HARD ROCK — Excavation for foundation upto required depth below existing ground level up to 1.5 m. depth in concrete road by chiselling / pneumatic drilling . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the job to restore the original state of the ground and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including curing, watering and compaction and complete . The measurement of the excavation would be based on actual depth of excavation. | - | Cubic Meters |
| 9 | -EXCAVA-HARDROCK 1.5 3.0 | -EXCAVA-HARDROCK 1.5 3.0 — Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK 1.5 mts- 3.0 mts | - | Cubic Meters |
| 10 | -EXCAVA-HARD ROCK 3.0 4.5 | -EXCAVA-HARD ROCK 3.0 4.5 — Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK BETWEEN 3 TO 4.5 | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000382-HD-10157.pdf
TENDER_DOCUMENT • 32.92 MB
Download all tender documents and submit your bid