| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Finance R O CHUCHOT SHAMMA | LEH LADAKH | LADAKH | 194101 | -37.00% | ₹5.4 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 L+₹8,631.99 (1.59%)Admitted-Finance SKINDYANG | -36.00% | ₹5.5 L+₹8,631.99 (1.59%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 L+₹51,878.27 (9.54%)Admitted-Finance | -30.99% | ₹6.0 L+₹51,878.27 (9.54%) | L3 | Admitted-Finance |
| 4 | L4₹7.3 L+₹1.9 L (34.9%)Admitted-Finance | -15.00% | ₹7.3 L+₹1.9 L (34.9%) | L4 | Admitted-Finance |
| 5 | L5₹7.6 L+₹2.2 L (40.5%)Admitted-Finance R O NANG | -11.50% | ₹7.6 L+₹2.2 L (40.5%) | L5 | Admitted-Finance |
Tender Value
₹8.6 L
EMD Value
₹20,360
Closing Date
14 May 2026, 4:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Construction of Nang internal road (By way of M.S Pipe and Side Drain) (Under District Plan)
2026_PWD_18722_5
CDL 04 of Leh of 2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer Construction Division Leh
₹20,360
27 May 2026
8 May 2026
15 May 2026
8 May 2026
14 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying MS pipe of 300 mm dia in trenches including cutting the road making filling after laying of pipe including loading, unloading, earthwork and carriage complete job. | 17 | Nos. | 27,118.64 | ₹4,61,016.88 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | 78.5 | Cum | 208.42 | ₹16,360.97 |
| 3 | Dumping stone in horizontall level including cost of stone and complete job | 17.55 | Cum | 953.03 | ₹16,725.68 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 17.55 | Cum | 5,725.33 | ₹1,00,479.54 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 30.42 | Cum | 6,606.08 | ₹2,00,956.95 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 221 | Sqm | 306.15 | ₹67,659.15 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_45155.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .