| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 CrAccepted-AOC MATERE HOUSE SEC NO 14 PRADHIKARAN PUNE MAHARASHTRA INDIA 412105 | PUNE | MAHARASHTRA | 412105 | ₹25.0 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹27.8 Cr+₹2.8 Cr (11.2%)Rejected-Finance | ₹27.8 Cr+₹2.8 Cr (11.2%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹31.4 Cr+₹6.4 Cr (25.5%)Rejected-Finance 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | ₹31.4 Cr+₹6.4 Cr (25.5%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹32.3 Cr+₹7.3 Cr (29.2%)Rejected-Finance 184 MAIN STREET NASIRABAD AJMER RAJASTHAN 305601 | ₹32.3 Cr+₹7.3 Cr (29.2%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹33.6 Cr+₹8.6 Cr (34.3%)Rejected-Finance | ₹33.6 Cr+₹8.6 Cr (34.3%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Agarwal Jagdish Construction Company Private Limited L4 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L3 | V M MATERE INFRASTRUCTURES INDIA PVT LTD L1 | MAA BHAGWATI ASSOCIATES L8 | surendra infrastructure pvt ltd L7 | NARSINGH DEVELOPERS LLP L6 | SHREE VENKATESHA CONSTRUCTION COMPANY L2 | CMRGS Infrastructure Projects Ltd L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | |||||||||||
| 2.00 | Item No 01 : Design and construction of Single Men Barracks incl Cook House and Dining hall For Agniveers. Complete all specified in soil bearing capacity report, design basis report drawings and tender documents. | 2 | Each Block | 11,55,00,000 ₹23,10,00,000 | 10,86,90,867 ₹21,73,81,734 | 9,61,53,600 ₹19,23,07,200 Lowest | 10,11,00,000 ₹20,22,00,000 | 10,70,40,000 ₹21,40,80,000 | 12,00,00,000 ₹24,00,00,000 | 10,39,00,000 ₹20,78,00,000 | 12,65,00,000 ₹25,30,00,000 |
| 3.00 | Sch 'A' Part-II (External Electric Supply) Lump sum price worked out by the contractor for (External Electric Supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | 1,09,59,927.81 ₹1,09,59,927.81 | 1,37,95,725 ₹1,37,95,725 | 65,28,000 ₹65,28,000 Lowest | 1,23,20,000 ₹1,23,20,000 | 1,78,62,400 ₹1,78,62,400 | 1,44,70,200 ₹1,44,70,200 | 80,00,000 ₹80,00,000 | 1,13,00,000 ₹1,13,00,000 |
| 4.00 | Sch 'A' Part-III (External Water Supply) Lump sum price worked out by the contractor for (External Water Supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | 5,16,023.97 ₹5,16,023.97 | 6,29,395 ₹6,29,395 | 3,07,200 ₹3,07,200 Lowest | 5,95,000 ₹5,95,000 | 5,50,000 ₹5,50,000 | 5,00,000 ₹5,00,000 | 4,00,000 ₹4,00,000 | 4,25,000 ₹4,25,000 |
| 5.00 | Sch 'A' Part-IV (Road, Path Curvert) Lump sum price worked out by the contractor for (Road, Path Curvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | 1,12,63,364.92 ₹1,12,63,364.92 | 1,13,51,155 ₹1,13,51,155 | 73,34,400 ₹73,34,400 Lowest | 1,48,30,000 ₹1,48,30,000 | 1,15,00,000 ₹1,15,00,000 | 1,31,09,392.86 ₹1,31,09,392.86 | 93,00,000 ₹93,00,000 | 1,05,00,000 ₹1,05,00,000 |
| 6.00 | Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | 29,15,928.18 ₹29,15,928.18 | 22,83,665 ₹22,83,665 | 16,89,600 ₹16,89,600 Lowest | 53,50,000 ₹53,50,000 | 52,00,000 ₹52,00,000 | 25,62,530.74 ₹25,62,530.74 | 21,00,000 ₹21,00,000 | 25,00,000 ₹25,00,000 |
| 7.00 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | 25,31,572.8 ₹25,31,572.8 | 16,76,560 ₹16,76,560 | 13,82,400 ₹13,82,400 Lowest | 53,00,000 ₹53,00,000 | 70,58,000 ₹70,58,000 | 29,23,966.1 ₹29,23,966.1 | 17,00,000 ₹17,00,000 | 17,95,000 ₹17,95,000 |
| 8.00 | Sch 'A' Part-VII (Site Clearance) Lump sum price worked out by the contractor for (Site Clearance) as listed in Schedule 'A' Part-I against the lump sum price inserted by the MES. | 1 | Lump sum | 20,59,051.8 ₹20,59,051.8 | 8,33,720 ₹8,33,720 Lowest | 13,44,000 ₹13,44,000 | 1,18,00,000 ₹1,18,00,000 | 45,50,000 ₹45,50,000 | 28,04,840.36 ₹28,04,840.36 | 16,00,000 ₹16,00,000 | 17,85,000 ₹17,85,000 |
| 9.00 | Sch 'A' Part-VIII (Summer & Cooling Appliances) Lump sum price worked out by the contractor for (Summer & Cooling Appliances) as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES. | 1 | Lump sum | 61,58,708.81 ₹61,58,708.81 | 40,94,405 ₹40,94,405 | 36,09,600 ₹36,09,600 Lowest | 87,25,000 ₹87,25,000 | 77,00,000 ₹77,00,000 | 1,32,24,727.1 ₹1,32,24,727.1 | 44,00,000 ₹44,00,000 | 48,10,000 ₹48,10,000 |
| 10.00 | Sch 'A' Part-IX (Lightening Protection System) Lump sum price worked out by the contractor for (Lightening Protection System) as listed in Schedule 'A' Part-IX against the lump sum price inserted by the MES. | 1 | Lump sum | 1,55,118.06 ₹1,55,118.06 | 3,59,360 ₹3,59,360 | 1,15,200 ₹1,15,200 Lowest | 1,42,000 ₹1,42,000 | 1,50,000 ₹1,50,000 | 2,23,370.4 ₹2,23,370.4 | 1,50,000 ₹1,50,000 | 2,07,000 ₹2,07,000 |
Tender Value
₹27.9 Cr
EMD Value
₹15 L
Closing Date
2 Apr 2026, 6:00 pmClosed
Chief Engineer Jabalpur Zone
Q Chief Engineer Jabalpur Zone ridge road Jabalpur 482001
PROVN OF SINGLE MEN BARRCKS INCLUDING COOK HOUSE FOR AGNIVEER AT THE RENADIERS REGIMENTAL CENTRE JABALPUR
2025_MES_730535_2
752998A PROVN OF SINGLE MEN BARRCKS INCLUDING COOK HOUSE FOR AGNIVEER AT JABALPUR
Open Tender
Civil Works
Lump-sum
545 days
JABALPUR
AS PER NIT
8 documents required · 8 mandatory
₹3,000
GE P No 1 Jabalpur
₹15 L
Yes
18 Jun 2026
12 Mar 2026
9 Apr 2026
12 Mar 2026
2 Apr 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | - | - | - | - |
| 2 | Item No 01 : Design and construction of Single Men Barracks incl Cook House and Dining hall For Agniveers. Complete all specified in soil bearing capacity report, design basis report drawings and tender documents. | 2 | Each Block | - | - |
| 3 | Sch 'A' Part-II (External Electric Supply) Lump sum price worked out by the contractor for (External Electric Supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 4 | Sch 'A' Part-III (External Water Supply) Lump sum price worked out by the contractor for (External Water Supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 5 | Sch 'A' Part-IV (Road, Path Curvert) Lump sum price worked out by the contractor for (Road, Path Curvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 6 | Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 7 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 8 | Sch 'A' Part-VII (Site Clearance) Lump sum price worked out by the contractor for (Site Clearance) as listed in Schedule 'A' Part-I against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 9 | Sch 'A' Part-VIII (Summer & Cooling Appliances) Lump sum price worked out by the contractor for (Summer & Cooling Appliances) as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 10 | Sch 'A' Part-IX (Lightening Protection System) Lump sum price worked out by the contractor for (Lightening Protection System) as listed in Schedule 'A' Part-IX against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
drg.rar
Additional Documents • 8.71 MB
BOQ_846903.xls
BOQ • 0.75 MB
TENDER.pdf
Tender Documents • 5.52 MB
C8.pdf
PDF • 0.10 MB
C7.pdf
PDF • 0.10 MB
C6.pdf
PDF • 0.10 MB
c5.pdf
PDF • 0.10 MB
C4.pdf
PDF • 0.10 MB
C3.pdf
PDF • 0.10 MB
C1.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .