Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.2 LAccepted-Finance 118 SHIRGAL DHARGAL PERNEM GOA | NORTH GOA | GOA | 403001 | L1 | Accepted-Finance low quoted | |
| 2 | L2₹70.8 L+₹16.6 L (30.6%)Rejected-Finance | L2 | Rejected-Finance high quoted |
Tender Value
₹67.8 L
EMD Value
₹1.4 L
Closing Date
2 Sept 2026, 5:30 pmClosed
Executive Engineer-V
the office of the Executive Engineer -V, PWD, Altinho Panaji Goa.
Reconstruction and Beautification of existing crematorium at Bhomwada, Tuem under MLA-LAD Scheme in Mandrem Constituency
2026_PWD_31382_1
PWD/D-V/ASW-I/27/26-27/L01
Open Tender
Civil Works - Buildings
Percentage
180 days
Altinho, Panaji -Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.4 L
23 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
2 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 4.47 | 100 sq.m. | 498 | ₹2,226.06 |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading danger lighting guarding as directed in :;All kinds of soil | 671.23 | cu.m | 286 | ₹1,91,971.78 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 284.87 | cu.m | 2,211 | ₹6,29,847.57 |
| 4 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering shuttering and finishing in:;All works upto plinth level | 142.44 | cu.m | 6,810 | ₹9,70,016.4 |
| 5 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 45.07 | cu.m | 5,186 | ₹2,33,733.02 |
| 6 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level | 61.7 | m3 | 6,115 | ₹3,77,295.5 |
| 7 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size);All works upto plinth level | 16.7 | cu.m | 7,178 | ₹1,19,872.6 |
| 8 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size);In walls (any thickness) including attached pilasters buttresses plinth and string courses fillets columns pillars piers abutments posts and structs etc. upto floor five level | 10.29 | cu.m | 8,034 | ₹82,669.86 |
| 9 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size);In beams suspended floors roofs having slope upto 15° landings balconies shelves chajjas lintels bands plain window sills staircases upto floor five level | 5.04 | cu.m | 8,109 | ₹40,869.36 |
| 10 | Centering & shuttering including Strutting Propping & removal of forms for :;Foundations Footings Bases for columns | 56.8 | sq.m | 407 | ₹23,117.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
Tendernotice_2.pdf
PDF • 1.74 MB
BOQ_31766.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .