Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹14 L
EMD Value
₹1.4 L
Closing Date
26 Nov 2026, 12:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
OFFICE OF THE EE PD PWD BANDA
OFFICE OF THE EE PD PWD BANDA
Construction of 1x1000 mm dia Hume Pipe Culvert at Chainage 9-000 Chainage 9-300 Chainage 19-200 and Chainage 19-900 on Baberu-Oran Marg ODR in District Banda
2026_CEBAN_1209793_1
3415/A-25 Date-05-11-2026
Open Tender
Civil Works
Fixed-rate
60 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹1.4 L
OFFICE OF THE EE PD PWD BANDA
18 Nov 2026
18 Nov 2026
26 Nov 2026
18 Nov 2026
26 Nov 2026
18 Nov 2026
23 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of granular sub-base by providing close Graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 . | 44 | cum. | 2,890 | ₹1,27,160 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density (As Per Clause 406-4.14) | 16.5 | cum. | 3,300 | ₹54,450 |
| - | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm usingmannual means . | 220 | sqm. | 63 | ₹13,860 |
| - | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 Percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grade-II) | 16.5 | cum. | 13,492 | ₹2,22,618 |
| - | Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with mechenical broom. As per MORT&H as per Clause 503 | 220 | sqm. | 18 | ₹3,960 |
| - | Providing and laying bituminous concrete with 100-120 tonne per hour capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 Percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specificationclause No. 507 complete in all respects (Grade-II) | 3.3 | cum. | 15,500 | ₹51,150 |
| - | Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site, spreading, grading to required slope and compacting to the meet requirement of table 300-2 as per MORT&H Specification. | 22.17 | cum. | 126 | ₹2,793.42 |
| - | Construction of 1×1000 mm dia Hume Pipe Culvert.
Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251) | 147.36 | cum | 121 | ₹17,830.56 |
| - | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) | 10.88 | cum | 1,010 | ₹10,988.8 |
| - | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. | 19.04 | cum | 4,340 | ₹82,633.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
Tendernotice_2.pdf
PDF • 3.19 MB
BOQ_2297228.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .