| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.1 L+₹14,112.35 (3.57%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P.BASKARAN&CO L1 | U3SANKAR & CO L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 1.35 | m3 | 246.4 ₹332.64 Lowest | 258 ₹348.3 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five M-sand and Ten Hard broken Stone Jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of Not more than 15cm thick well rammed, consolidated and curing etc., complete complying with standard specification. | 0.26 | m3 | 5,007.09 ₹1,301.84 Lowest | 5,268 ₹1,369.68 |
| 3.00 | Brick work in Cement Mortar 1:5 (One Cement and Five M-Sand) using best quality II class ground moulded chamber burnt of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 0.15 | m3 | 7,021.54 ₹1,053.23 Lowest | 7,463 ₹1,119.45 |
| 4.00 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 7.7 | m2 | 592.22 ₹4,560.09 Lowest | 622 ₹4,789.4 |
| 5.00 | Plain Cement Concrete 1:2:4 (One Cement, Two M-Sand and Four Hard Broken Stone Jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
for foundation and basement | 0.8 | m3 | 6,401.3 ₹5,121.04 Lowest | 6,736 ₹5,388.8 |
| 6.00 | Plastering with Cement Mortar 1:5 (One Cement and Five P-Sand), 12mm thick in all floors including Mortor plastizer at 200ml per 50kg of Cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 2.27 | m2 | 272.98 ₹619.66 Lowest | 286 ₹649.22 |
| 7.00 | Supplying, fabricating and transporting a fully finished 20' x 10' prefabricated office container. The side sheet has a thickness of 1.6mm, the roof sheet is 2mm thick, and the bottom sheet is 28mm thick. It features an 8mm MDF interior wall and a wooden frame measuring 35 x 35mm with thermocol insulation for a ceiling finish and finishing with Vinyl flooring of 1mm thick.
The container includes six workstations, each sized 2'x4' with a laminate finish and one executive MD table measuring 2'x4 1/2' for the video conference room, an MS entrance door, and an aluminum access door sized 3'x7". Internal partitions are included for the video conference cabin between E-sewa center.
It has five windows to improve lighting and ventilation. The electrical setup includes conduits, basic wiring, and 22-watt LED lights (6 units), along with two outer bulkhead lights and 6-amp switches & Sockets and 10-amp switches & sockets and provisions for five wall-mounted fans of approved quality.
This cost includes all costs for fabrication, fitting, finishing, loading, and transportation etc., complete complying with standard specification. | 1 | No | 3,22,050 ₹3,22,050 Lowest | 3,33,333 ₹3,33,333 |
| 15.00 | GST @ 18 % | 1 | Nos | 60,307 ₹60,307 Lowest | 62,460 ₹62,460 |
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
18 Sept 2026, 3:00 pmClosed
Executive Engineer PWD
Executive Engineer PWD, Buildings Construction and Maintenance Division, Chengalpattu - 603 001.
Providing Additional e-Sewa Kendra in a Prefabricated Porta Cabin in Combined Court Building at Chengalpattu District.
2026_PWD_701276_1
01 CPT / 02 / 2026-27
Open Tender
Civil Works - Buildings
Lump-sum
Combined Court Building at Chengalpattu District
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,200
12 Oct 2026
3 Sept 2026
12 Oct 2026
4 Sept 2026
18 Sept 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 1.35 | m3 | - | - |
| 2 | Cement Concrete 1:5:10 (One Cement, Five M-sand and Ten Hard broken Stone Jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of Not more than 15cm thick well rammed, consolidated and curing etc., complete complying with standard specification. | 0.26 | m3 | - | - |
| 3 | Brick work in Cement Mortar 1:5 (One Cement and Five M-Sand) using best quality II class ground moulded chamber burnt of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 0.15 | m3 | - | - |
| 4 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 7.7 | m2 | - | - |
| 5 | Plain Cement Concrete 1:2:4 (One Cement, Two M-Sand and Four Hard Broken Stone Jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
for foundation and basement | 0.8 | m3 | - | - |
| 6 | Plastering with Cement Mortar 1:5 (One Cement and Five P-Sand), 12mm thick in all floors including Mortor plastizer at 200ml per 50kg of Cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 2.27 | m2 | - | - |
| 7 | Supplying, fabricating and transporting a fully finished 20' x 10' prefabricated office container. The side sheet has a thickness of 1.6mm, the roof sheet is 2mm thick, and the bottom sheet is 28mm thick. It features an 8mm MDF interior wall and a wooden frame measuring 35 x 35mm with thermocol insulation for a ceiling finish and finishing with Vinyl flooring of 1mm thick.
The container includes six workstations, each sized 2'x4' with a laminate finish and one executive MD table measuring 2'x4 1/2' for the video conference room, an MS entrance door, and an aluminum access door sized 3'x7". Internal partitions are included for the video conference cabin between E-sewa center.
It has five windows to improve lighting and ventilation. The electrical setup includes conduits, basic wiring, and 22-watt LED lights (6 units), along with two outer bulkhead lights and 6-amp switches & Sockets and 10-amp switches & sockets and provisions for five wall-mounted fans of approved quality.
This cost includes all costs for fabrication, fitting, finishing, loading, and transportation etc., complete complying with standard specification. | 1 | No | - | - |
| 15 | GST @ 18 % | 1 | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
ETN0102.pdf
Tender Documents • 0.58 MB
GeneralCondition.pdf
Additional Documents • 0.49 MB
BOQ_842900.xls
BOQ • 0.39 MB
ChengalpattuCourt.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .