| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.9 LAccepted-AOC | ₹55.9 L | L1 | Accepted-AOC Below the estimate rate |
| 2 | L2₹60.8 L+₹4.9 L (8.81%)Rejected-Finance | ₹60.8 L+₹4.9 L (8.81%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Meenu Industries PVT LTD L2 | NEHRU CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Labour for cutting open road for laying water mains or sewer. Concrete Roads including all labour charges etc., complete complying with standard specifications. WD-W0740 | 41 | m3 | 1,300 ₹53,300 | 1,185 ₹48,585 Lowest |
| 2.00 | Labour for cutting open road for laying water mains or sewer. B.T. Roads (or) Maccadam road including all labour charges etc., complete complying with standard specifications. WD-W0739 | 276 | m3 | 900 ₹2,48,400 | 840 ₹2,31,840 Lowest |
| 3.00 | Removing and Stocking of existing Paver Block of Size 83mm thick carefully reuse, as per direction of Engineer incharge are standared specification | 336 | m2 | 350 ₹1,17,600 Lowest | 750 ₹2,52,000 |
| 4.00 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 141 | m3 | 5,600 ₹7,89,600 | 4,772 ₹6,72,852 Lowest |
| 5.00 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site and cost form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | 141 | m3 | 7,000 ₹9,87,000 | 6,265 ₹8,83,365 Lowest |
| 6.00 | The Rates for Earth Work Excavation for Pipe Line Works of PVC/HDPE/GRP Having Bed Width of 1.25m and below on Linear Measurement Basis etc.,complete as per standard specification . WD-W0708 | 3,000 | Rm | 130 ₹3,90,000 | 118 ₹3,54,000 Lowest |
| 7.00 | The Rates for Refilling for Pipe Line of PVC/ HDPE/GRP Works Having Bed Width of 1.25m and below on Linear Measurement Basis.,complete as per standard specification . WD-W0708 | 3,000 | Rm | 27 ₹81,000 | 24 ₹72,000 Lowest |
| 8.00 | Towards supply and delivery of 160 mm dia HDPE PIPES - PE 100 (Pre-Compounded Resin) etc., complete complying with standard specifications. WD-M0191 | 3,000 | Rm | 750 ₹22,50,000 | 675 ₹20,25,000 Lowest |
| 9.00 | Jointing 160mm dia HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part- 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers. etc., complete complying with standard specification.WD-W0622 | 500 | Joint | 340 ₹1,70,000 | 260 ₹1,30,000 Lowest |
| 10.00Towards Supply and Delivery of following PVC and GI Specials including all charges etc., complete complying with standard specification. | |||||
Tender Value
Refer Docs
EMD Value
₹68,000
Closing Date
13 Aug 2026, 3:00 pmClosed
Commissioner, Kottakuppam Municipality
Commissioner, Kottakuppam Municipality
Providing New HDPE Pipeline from Ward no 13, Irular Colony to ward no 26, Womens Police station pump
2026_MAWS_691087_1
617/2026/E1
Open Tender
Civil Works - Water Works
Works
270 days
Kottakuppam Municipality
Yes Enclosed
4 documents required · 4 mandatory
₹0
₹68,000
5 Sept 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
5 Aug 2026 - 13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for cutting open road for laying water mains or sewer. Concrete Roads including all labour charges etc., complete complying with standard specifications. WD-W0740 | - | m3 | 1,393.67 | - |
| 2 | Labour for cutting open road for laying water mains or sewer. B.T. Roads (or) Maccadam road including all labour charges etc., complete complying with standard specifications. WD-W0739 | - | m3 | 995.08 | - |
| 3 | Removing and Stocking of existing Paver Block of Size 83mm thick carefully reuse, as per direction of Engineer incharge are standared specification | - | m2 | 468.9 | - |
| 4 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | - | m3 | 5,608.2 | - |
| 5 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site and cost form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | - | m3 | 7,362.5 | - |
| 6 | The Rates for Earth Work Excavation for Pipe Line Works of PVC/HDPE/GRP Having Bed Width of 1.25m and below on Linear Measurement Basis etc.,complete as per standard specification . WD-W0708 | - | Rm | 138.76 | - |
| 7 | The Rates for Refilling for Pipe Line of PVC/ HDPE/GRP Works Having Bed Width of 1.25m and below on Linear Measurement Basis.,complete as per standard specification . WD-W0708 | - | Rm | 27.97 | - |
| 8 | Towards supply and delivery of 160 mm dia HDPE PIPES - PE 100 (Pre-Compounded Resin) etc., complete complying with standard specifications. WD-M0191 | - | Rm | 793.3 | - |
| 9 | Jointing 160mm dia HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part- 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers. etc., complete complying with standard specification.WD-W0622 | - | Joint | 341.25 | - |
| 10Towards Supply and Delivery of following PVC and GI Specials including all charges etc., complete complying with standard specification. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
ConditionsNN.pdf
Tender Documents • 1.94 MB
68BID7.pdf
Tender Documents • 0.68 MB
BOQ_830945.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .