| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹18.8 L+₹11,255.78 (0.60%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹18.9 L+₹20,635.60 (1.11%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹18.8 L
EMD Value
₹1.9 L
Closing Date
6 Oct 2026, 12:00 pmClosed
DDC
Office of DDC Mandi Parishad Tindwari Road Banda
Reconstruction of 125 Meter Boundary Wall at NMY Rath Under Mandi Samiti Rath
2026_RKUMP_1190652_1
Nirman Khand Banda/Tender/2026-579 dt.15September2026
Open Tender
Civil Works
Fixed-rate
90 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
DDC Mandi Parishad Banda
₹1.9 L
10 Oct 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 meters. S.I. 694 | 3.11 | Cum. | 800 | ₹2,484 |
| 2 | Dismantling brick work or stone work in lime or cement mortar and including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 meters. S.I. 692 | 18.11 | Cum. | 350 | ₹6,339.38 |
| 3 | Boring and costing of 30 cm dia piles of double under reamed of 75 cm. dia bulb and 3.50 m deep below ground level consisting 4 nos. 12 mm dia main bar and 6mm 25 cm.C/C ring filled with c.c. in 4:2:1 in 2 cm. gauge stone grit coarse sand and cement in supply of all materials labour T&P etc. required for proper completion of work . | 210 | Cum. | 4,407 | ₹9,25,470 |
| 4 | Excavation in foundation in black cotton soil including lift up to 1.5 M and lead up to 50 M. and including filling, watering and ramming of the excavated earth into the trenches or into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 50 M.from the foundation trenches. | 6 | Cum. | 120 | ₹720 |
| 5 | Sand filling in plinth including supply of necessary quantity of good quality of sand including watering, dressing etc. labour T & P required for proper completion of work. (S.I.No. 255) | 6 | Cum. | 1,100 | ₹6,600 |
| 6 | Cement concrete with 4 cm gauge stone ballast, coarse sand of cement in proportion of 1:6:12 in foundation & under floors, including supply of all materials, labour & T&P etc. required for proper completion of the work(S.I.No. 273) | 6 | Cum. | 3,800 | ₹22,800 |
| 7 | R.C.C. work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:1.5:3 in raft excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 284) | 23.04 | Cum. | 5,996 | ₹1,38,147.84 |
| 8 | R.C.C. work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:1.5:3 in column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 289) | 6.98 | Cum. | 8,031 | ₹56,078.87 |
| 9 | R.C.C. work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:1.5:3 in Plinth beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 285 ) | 8.63 | Cum. | 6,800 | ₹58,650 |
| 10 | M-150 class brick work in 1:4 cement & coarse sand in super structure of one brick thick including necessary cutting and moulding of bricks including supply of all material labour, tools and plants required for proper completion of the work. S.I.No.- 303+309+310+difrence of coarse sand. | 44.76 | Cum. | 5,340 | ₹2,39,007.72 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.54 MB
BOQ_2244368.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .