| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹2.3 L+₹3,569.50 (1.57%)Rejected-Finance S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation |
Tender Value
₹2.3 L
EMD Value
₹2,900
Closing Date
13 Oct 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of 3.3KV substation sub station at 20L and 2WD in RVIIA seam at Shyamsundarpur Colliery under Bankola Area .
2023_ECL_290000_1
ECL/GM/BA/E TENDER/23-24/EnM/100 Dt. 28.09.2023
Open Tender
Excavation Department Work
Item Rate
30 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹2,900
23 Dec 2023
29 Sept 2023
14 Oct 2023
29 Sept 2023
13 Oct 2023
29 Sept 2023
29 Sept 2023 - 3 Oct 2023
Amount
Item Description/ Heading
Collection of trolley and lifting to surface and loading of transwitch unit and it break over trolley and lifting it to pit top of pit no 3
Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no 3 (in RVII deam) and again refitting of cage after lowering
Transportation of transwitch unit and its breaker from pit bottom ( in RVII seam ) to 20L/2WD ( in RVIIA seam) over trackline with haulage .
Transportation of four nos of Prabhu braeaker from surface to 20L/ 2WD ( in RVIIA seam) i) Collection of trolley and loading of four nos of Prabhu make VCB s over trolley . Ii) Then transportation of VCBs from pit top to pit bottom ( in RVII seam) of pit no 3.iii) Then from pit bottom ( in RVII seam) of pit no 3 to 20L/2WD ( in RVIIA seam) over trackline with haulage .
Transportation of two nos of 550V,200A, ACBs from surface to 20L/2WD(in RVIIA seam) i)Collection of trolley and loding of two nos of ABC s over trolley .ii) Then transportation of ABC s from pit top to pit bottom ( in RVIIseam) of pit no 3. iii) Then from pit bottom ( in RVII seam) of pit no 3to 20L/2WD ( in RVIIA seam) over trackline with haulage .
Transportation of 150 sqmm 3.3KV, 250 meter PVC armound cable by carrying over shoulder from 12L/1WD substation in RVII seam to 14L/4WD substation in RVII A seam and laying it from 14L/4WD to 20L/2WD in RVIIA seam and hanging the cable all along the way to roof
Unloading of transwitch unit and its breaker and four nos of Prabhu make VCBs and two nos of ACBs at 20L/2WD ( in RVII A seam) and placing them in order .
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .