| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | ₹20.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.4 LRejected-AOC | ₹20.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHRI DHANDAYUTHAPANI SWAMI INFRA PRIVATE LIMITED L2 | KLK Construction L1 |
|---|---|---|---|---|---|
| 1.00Drain | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 430 | cum | 175 ₹75,250 | 164 ₹70,520 |
| 1.02 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 62 | cum | 5,350 ₹3.3 L | 5,262 ₹3.3 L |
| 1.03 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 176 | cum | 6,250 ₹11 L | 6,105 ₹10.7 L |
| 1.04 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 555 | Sqm | 310 ₹1.7 L | 309 ₹1.7 L |
| 1.05 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 140.9 | Kg | 91 ₹12,821.90 | 89.8 ₹12,652.82 |
| 1.06 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 2 | Cum | 8,350 ₹16,700 | 8,164 ₹16,328 |
| 1.07 | Provision for GST 18% | 1 | No | 3,07,533 ₹3.1 L | 3,00,909 ₹3.0 L |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
26 Feb 2026, 3:00 pmClosed
Commissioner Oddanchatram Municipality
Oddanchatram Municipality
Construction of Strom Water Drain at Rsp Nagar of Ward no 3 and Dhideer Nagar West Street of Ward no 18 in Oddanchatram Municipality
2026_MAWS_665727_1
0604/2026/E1
Open Tender
Civil Works
180 days
Oddanchatram Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
13 Mar 2026
24 Feb 2026
26 Feb 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
Drain
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309)
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Provision for GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_799599.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid