Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
30 May 2023, 5:00 pmClosed
Superintending Engineer
EDC, Ayodhya
Construction of 11 KV Line of 20 H.P. Nalkoop Near Laxman Ghat and Giving 20 H.P. Tubewel Connection at Near Sita Kund Ayodhya Under Electricity Distribution Division-Ist, Ayodhya
2023_MVVNL_805448_1
16 H(F)(W)/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As Per Tender Specifiation
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹7,000
2 Jun 2023
24 May 2023
31 May 2023
24 May 2023
30 May 2023
24 May 2023
Amount
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 20 Km.)
ST Pole 11 Mtr. long
ACSR Weasel Conductor
11 KV H.T. XLPE cable 3x70 sq mm
11 KV Cable Jointing Kit outdoor 3x70 sqmm
Transformer 25 KVA
Transformer 63 KVA
Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of ST Pole as per RESPO Norms.
Fabrication and Erection of Double Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Single Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Chemical Pipe for Earthing (all the material will be supplied by the contractor.)
Installation of Heat Shrinkable Type cable jointing kits outdoor end Termination suitable for 11 KV XLPE cable 3x70 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Laying of underground 11 KV 3x70 sq mm XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Laying of underground 11 KV 3x70 sq mm (Double Circuit) XLPE Cable by HDD (HORIZONTAL DRILL DIRECTION) Method by using suitable HDPE Pipe & HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Mounting of 25 KVA Transformer as Per RESSO Norms
Mounting of 63 KVA Transformer as Per RESSO Norms
Supply and Laying of G.I. Pipe 6'' dia
M/S SANTOSH KUMAR CONSTRUCTION
Hindustan Electric Work
M/S VISHWAATH CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .