Tender Value
₹13.4 L
EMD Value
₹26,900
Closing Date
29 Nov 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
President,Panchayat Office, Pachampalayam, Anthiyu
President, Panchayat Office, Pachampalayam, Anthiyur
Construction of 60000 liter capacity OHT Pallipalalyam Pirivu at Pachampalayam, Anthiyur Block, Erode District 15th CFC 2021-22
2022_RDTN_266186_1
02/2022/Pachampalayam
Open Tender
Civil Works - Water Works
Works
120 days
Pachampalayam, Anthiyur
Please refer Tender documents.
7 documents required · 7 mandatory
₹26,900
President, Pachampalayam,Anthiyur
₹26,900
Panchayat Office, Pachampalayam, Anthiyur
29 Nov 2022
21 Nov 2022
29 Nov 2022
21 Nov 2022
29 Nov 2022
21 Nov 2022
25 Nov 2022
Amount
Earth work excavationsoil, S.S. 20B up to 0-2m Depth, For Outer ¢ral column
For foundation (SDRNot requiring blasting)
DMR not required Blasting
Second depth of 2 m to 3 m, In DMR not requiring blasting For out side column & Centre Column
PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL.
RCC 1:1 1/2: 3 using 20mm HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, finishing, curing etc.Column footing below 1.50 m from GL
0 to 1.50 m below GL
0 to 4.50 m from GL
4.50 m to 7.32 m. from GL
For above 7.32m to 10.980 m from GL
Supply and erecting steel Centering, for sides and soffits of RCC works including strutting and shuttertting Charges etc. complete for the following PLANE SURFACES,Below GL
0-3.30 m Above GL
3.31m to 4.30m Above GL
6.31m to 7.30m Above GL
Curved Surface - 0 to 3.30 m Above platform
3.31 to 4.30m Above platform
Square columns Below GL
0 to 3.30 m Above GL
Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods Upto 16 mm
Plastering over the concrete potions of oht with c.m 1:5mix 12mm thick
Plastering over the concrete potions of oht with c.m 1:3mix 10mm thick
Painting two coats to the exposed surface of SR using cement paint
Supplying and fixing of Cut stone in RCC 1 : 11/2 :3 Using 20HBS below inlet pipe
Providing and fixing of RCC inner accass ledder in RCC 1:1.5:3 using 20mm HBS stone for OHT including cost of rainforcement , placing grill in position, centering shuttering charges, mixing concrete, curing, etc.,
Supply, delivery and fixing of Outside M.S. ladder of 4.5cm width made out off 50x50x6mtr M.S. angle for sides and steps in 16mm MS plain rods fixed at 30cm center to center welded, jointed etc.,
Supply and delivery of manhole cover of size 60cm x 60cm (heavy duty) with frame
Fixing of manhole cover in RCC 1:1.5:3 with suitable rainforcement in M.S angle fixed along edges
Supplying and fixing of PVC ventilating mosquito proof nylon net with 110mm PVC pipes and cowl
Provision for 65mm & 50mm G.I pipes and 65mm & 50mm Gate Valve, G.I & PVC Specials for tank connection works.
Drawing and writting details of scheme
Providing Rain water harvesting
Refilling the foundation with excavated soil (other than sand)
Providing labour charges for pipe connections to the OHT with GI pipes and Specials etc. complete.
Supply and delivery of 63 mm 6kg. PVC pipe
Earth work excavation and depositing on bank with in the lead of 10m and lift of 2m in all soil clasification .
Lowering of PVC pipes in the trunch and jointing with cement solvent ,etc.,
Refilling of the trunch with excavated earth and consolidation of surpluse earth ,depositing as directed by the officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SRI MUNIAPPAN CONSTRUCTION
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .