| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.0 CrAdmitted-Finance | ₹2.0 Cr | Admitted-Finance |
| 2 | ₹2.1 CrAdmitted-Finance | ₹2.1 Cr | Admitted-Finance |
| 3 | Rejected-Technical | - | Rejected-Technical The bidder has not submitted all the documents as per the tender terms and conditions |
| 4 | Rejected-Technical | - | Rejected-Technical The bidder has not submitted all the documents as per the tender terms and conditions |
| 5 | Rejected-Technical | - | Rejected-Technical The bidder has not submitted all the documents as per the tender terms and conditions |
| Sl No | Description | Qty | Unit | M/s H.R Enterprise | PARTHA PRATIM GOGOI |
|---|---|---|---|---|---|
| 1.00Total quoted Amount (incl. GST) for | |||||
| 1.01 | Total quoted Amount (incl. GST) for Sheet 1 | 1 | Nos | 1,99,94,805.43 ₹2.0 Cr | 2,12,67,134.89 ₹2.1 Cr |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
23 Mar 2026, 2:00 pmClosed
DGM, Contract and Procurement
M/s Purba Bharati Gas Pvt. Ltd. 6th Floor, Central Mall, Christian Basti, GS Road, Guwahati, Assam 781005
TENDER FOR HIRING OF SERVICES FOR CARRYING OUT COMMERCIAL/INDUSTRIAL CONNECTIONS AT GA9.03 ON 03 YEARS ARC
2026_PBGPL_270301_1
PBGPL/C and P/COMM-INDUS/2026/03
Open Tender
Pipe Laying Works
1095 days
Purba Bharati Gas Pvt. Ltd, Guwahati
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.2 L
Yes
As per Tender
7 Apr 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
23 Mar 2026
18 Mar 2026
16 Mar 2026
Total quoted Amount (incl. GST) for
Total quoted Amount (incl. GST) for Sheet 1
Percentage BoQ
BoQ_Ver4.0
Tender No: PBGPL/C&P/COMM-INDUS/2026/02
Do you want to quote for this sheet ?
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Item No.
PE PIPELINE
Pipe Laying in any type of surface like unprepared surface (Katcha surface)/ Normal Surface/ Hard surface/Rock surface etc using open cut/ Moling (without Casing)/ Moling (with Casing)/Directional Drilling technique (with and without casing pipe) methodology.
Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm,32 MM, 63MM, 90MM and 125 mm), Warning Mat etc. Handling, Stringing, uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route, laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables, equipments, labour and other inputs. In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store. -Laying of all PE pipe (PE 100 SDR11), Including supply of HDPE casing pipe (in case of HDD (with case).Moling(with case) , Couplers, End caps etc. (Ref. cl. 4.3 of Particular job specification). -Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge. -Casing details is as given below:- 1. For 20/32 mm PE pipe (in 75 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 2. For 63 mm PE pipe (in 125 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 3. For 90 mm pipe (in 180 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 4. For 125 mm pipe (in 250 mm dia. HDPE Casing Pipe, PE63/80 PN 6.0).
Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings.
Specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:
Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details and submit same to Owner for review / approval.
Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc.
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.
Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area.
Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge, installation of safety signs.
Barricading the pipeline construction area prior to execution of the works as per drawing no. enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.
Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)
Uncoiling, stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification. Note:- Coordinates to be taken for implementation for GIS for Valve pit ,Fusion welding location and MRS.
The scope of work against this item also include Electro-fusion jointing of valves, fittings wherever required and as directed by Engineer-in-charge.
The scope of work against laying of 20 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H>=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).
Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.
Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work) .
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from Owner/ PMC.
Preparation and submission of Daily progress report, Laying Graphs / PE line cards and PE fitting reports on daily basis.
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.
In case, the minimum required depth is not possible due to site condition, necessary mitigation measures with minimum permissible top cover shall be carried out by the contractor in consultation with EIC as per PNGRB Guidelines, without any time and cost implecation to owner.
Submission of all documents required for contract closure in numbers as mentioned in contract.
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.
20/32 mm PE 100 pipe
63 mm PE 100 pipe
90 mm PE 100 pipe
125 mm PE 100 pipe
NOTE i) The lengths of pipelines are tentative. ii) For restoration of asphalt / concrete roads, the item for construction of asphalt top / concrete top / Tiles/Stone slab/Paver Blocks/Curb Stones shall be paid separately as per the rates quoted for the same elsewhere in the SOR. iii) In case, contractor prefers to lay the pipeline through HDD method in place of method as per SOR item- 1, contractor shall be required to lay the pipe upto a depth not more than 1.4 m. The payment shall however be made as per SOR item No.- 1 only.
Restoration Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required, as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to the satisfaction of Engineer-in-charge.
Restoration of Asphalt / Bituminous road upto 10 cm thickness
Restoration of Concrete / Metal road beyond upto 20 cm thickness
Tiles/Stone slab/Paver Blocks/Curb Stones upto 20 cm thickness
Brick Soling / Channels, etc up to .20 cm thickness
Installation of valve in pit including supply of valves
Supply of isolation valves (as per data sheet) and installtion of valves in the valve pits as per typical drawing and specification enclosed and instructions of Engineer-in-charge. Payment of valve pits shall be paid separately as per SOR.
PE Valve 20/32 mm dia
PE Valve 63 mm dia
Construction of Valve Pits as per the enclosed tender drawing and specification. The item includes supply of all the material including Pre-cast RCC cover, shuttering, reinforcement, labour, curing etc as per the drgs, specification and instruction of EIC.
Type-I having Internal size of Minimum 1000 x 1000mm
Type-II having Internal size of Minimum 600 x 600mm
Note: The tender drawing enclosed is only for reference purpose and contractor shall be required to prepare drawings (in line with reference tender drawing) for specific sizes of Valve pits and the same shall be approved by EIC.
Fabrication & Installation of Markers
RCC Route Markers
Supply, fabrication and installation of RCC route markers as per the attached drawing in technical volume, along the route including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete.
Pole Markers with Foundation
Supply, fabrication and installation of plate markers as per the attached drawings in technical volume including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete, cleaning, stencil let.
Warning Plate Markers
Supply, fabrication and installation of plate markers, including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, etc. as per the attached drawing in technical volume to be installed near regulator.
Note: i) The quantities mentioned are indicative only. ii) For all the supply items mentioned above, procurement shall be made as per specification & preferred vendor list in tender and after due approval of engineer- in - charge.
Construction of RCC structure for protection of service line for drain/nallah Crossings
Construction of Non suspended slabs/pavement slabs including pedestal/ramp etc.using reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix with 20 mm & down size graded crushed stone aggregates) to protect the PE pipe laid. All necessary form work, finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. shall be as specified and directed by EIC. The rates shall include grouting of pockets, supply of all material, tools, reinforcement steel etc.
Installation of MRS/ Metering Skid
Receiving and taking over, handling, loading, transportation,unloading of MRS/Metering skid from owner's designated stockyard to site/contractor designated stockyards to sit/ Contractor designated fabrication yard, Installation at foundation (Including supply of all structural items) and hooking up with PE Pipe including all works as required to complete the job as per drawing and specification. The scope include supply of TF and other PE fittings as per requirement and various associated works to commission MRS/Metering skid. Note: 1) Amount towards civil work shall be payable as per related SOR, 2) Rate to include cost of all labour, tools, tackles, equpment, hire charges ,3) Bolts, Nuts, Washer etc, if required shall be procured and supplied by contractor within rate qouted, 4) Payment for supply and installation of transition fittings and other PE fittings required to complete the system ready for commissioning are inclusive in the item.
CIVIL WORKS
Earth Work
Earth in excavation and filling to the grades and levels shown in the approved drawings in all kinds of conditions including for Road embakments, using approved quality good earth from designated borrow area, for all heights and depths including clearing and stripping (min. 150 mm) of the area marked for filling, taking spot levels, consolidating the exposed natural soil surface, excavating the earth from borrow area loading, transporting & unloading, spreading in layers not exceeding 150 mm thickness, breaking clods, watering (if reqd.), ramming and compacting by manual/ mechanical means to give minimum 92% of modified Proctor's density of earth, testing & dressing including disposal of all unserviceable material all complete as per specifications and directions of Engineer-in-charge. Note: The restoration shall be executed as per original site condition and requirement.
(Rate to include cost of all labour, tools, tackles, equipment, hire chanrges, cost of borrow earth by way of royalties, right of way, cess etc., as applicable with all bye works and sundry works).
1 Cement : 2 Coarse sand : 4 stone aggregate 20mm nominal size.
1 Cement : 4 Coarse sand : 8 stone aggregate 40mm nominal size.
Reinforced Cement Concrete
Providing and laying reinforced cement of grade M-25 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers, column, equipment foundation, Non suspended slabs/pavement slabs, ramps, cable trench inlcuding construction joints, bitumen painting on surface in contact with soil, supplying and fixing reinforcing steel, shuttering, inserts, finishes, grounting etc. at all depths and heights complete as per drawings, specifications and direction of the Engineer-in-charge.
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all maerials such as minimum 43 grade cement including sulphate resistant cement for sub-structures, R/F steel, Inserts, bolts, conduits, bitumen, other minor constrcution materials, shuttering, stanging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.
Concrete Pavement
Providing and laying reinforced cement concrete of (M-25 grade) with 20mm and down grade crushed stone aggregate in pavement, including preparation of base (i.e. compacted subgrade, 200 thk sand and 50 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternate panels, filling the gaps between the panels with bitumen etc., making slopes, finishing edges, leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering, providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the Engineer-in-charge.
150 mm thick (Type I)
Brick Work
Providing brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curring, scaffolding, etc., as per specifications and drawings with all bye-works and direction of the Enfineer-in-charge.
(Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement, bricks, finishes, bitumen, other minor constrcution materials, shuttering, staging, masonry work, plastering, painting etc. with all bye-works and sundry works).
Note: The quantites of individual item can varied as per site requirement.The payment will be made as per actual certified measurement at site.
Laying of Brick layer/ Concrete
Providing single layer of Brick / Concrete / or impact resistant tape to entire width of trench above Warning Mat placed in trench over the laid pipeline as per OISD 226, standard drawing, specification and instruction of Owner. (Rate to include cost of all labour, tools, tackles, equipment, hire charges & supply of all materials, etc)
Brick Layer for width of PE pipeline trench as per drawing (75 mm thk.)
Concrete for width of PE pipeline trench as per drawing (80 mm thk.)
Demolition of PCC work below plinth level
Demolishing plain cement concrete (PCC) work (taking all necessary safety precautions) for all depths below plinth level including supply of all tools & tackles, necessary scaffolding, propping, underpinning, etc. , disposal of unserviceable material outside the boundary limits keeping the owner indemnified of any liabilities from statutory/ local bodies, all complete work as specified and directed
Excavation for foundation works
Excavation as per plan, upto 3 meters and upto any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be levelled and neatly dressed complete in all respect as per scope of work, technical specification and directions of EIC.
Upto 3.0 Mtrs
Dismantling of RCC & cutting of reinforcement (Thickness above 3”)
Installation of Commercial Regulators, Metres , GI Pipes
Installation of Commercial regulators of various sizes and capacities
Installation of Commercial meters of various sizes and capacities
Installation of GI pipes (The scope covers the installation, threading, jointing, testing, and commissioning of Galvanized Iron (GI) pipelines complete with all required fittings, accessories, supports, and allied works as per specifications, drawings, and directions of the Engineer-in-Charge.)
Installation of 1" GI Pipe
Installation of 3/4" GI pipe
Installation Of 1/2" GI pipe
Isolation Ball Valve And Appliance Valve
Supply and installation of Isolation & Appliance Ball Valves as per Technical Specification and as directed by EIC
Isolation Ball Valve 1 " max. 6 bar (g)
Isolation Ball Valve 1/2 " max. 6 bar (g)
Isolation Ball Valve 3/4 " max. 6 bar (g)
Total Price (inclusive of all applicable taxes, duties & other levies [if any] payable by the Contractor under the Contract, or for any other cause except final GST) for complete scope of work
GST : 18% on above
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_315127.pdf
techsummary_315127.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
Volume-III.pdf
Tender Documents • 34.70 MB
Volume-II.pdf
Tender Documents • 28.12 MB
VOLUMEI.pdf
Tender Documents • 3.51 MB
BOQ_315127.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid