Tender Value
₹9.3 L
EMD Value
₹20,000
Closing Date
4 Jun 2026, 1:00 pmClosed
Director_General_Park_and_Square
5, S N Banerjee Road, Kolkata-700013
REPARING AND PAINTING AND OTHER ALLIED WORKS AT SADHANA SARKAR UDDYAN IN WARD-28, BR-IV.
2026_KMC_1024987_1
KMC/DG_PS/IV/28/01/25-26R2
Open Tender
CIVIL WORKS
Percentage
60 days
Kolkata
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹20,000
11 Sept 2026
21 May 2026
6 Jun 2026
22 May 2026
4 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 30 | EA | 245 | ₹7,350 |
| 2 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | 292.5 | SQM | 11 | ₹3,217.5 |
| 3 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 2.58 | M3 | 6,047 | ₹15,619.4 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL (10th Corrigenda & addenda dated 22.01.2020) | 0.17 | MT | 60,150 | ₹10,366.89 |
| 5 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 229.21 | SQM | 19 | ₹4,354.99 |
| 6 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (b) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018) | 286.33 | SQM | 175 | ₹50,107.75 |
| 7 | Supplying & laying 25 mm thick Tiles of any shade of approved quality as per relevant IS code, IS: 1237-2012 laid in pattern as directed for footpath, ramp, staircase of public building over 25 mm thick (Avg) Cement mortar (1:3) & Cement Slurry @ 4.4 kg/Sq.m ut hack side of Black. (Cement for Martar & Slurry to be supplied by Department). in all respect i.e, with all labour and material. (ii) Coloured Decorative (Border concrete if necessary to be paid separately). | 54.6 | SQM | 693 | ₹37,837.8 |
| 8 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 43.88 | M3 | 166 | ₹7,283.25 |
| 9 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m (3rd Corrigenda & addenda dated 04.06.2018) | 0.17 | MT | 72,603 | ₹12,075.33 |
| 10 | BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . A. ROOFING & SHEETWALLING 14. Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make as per IS : 15965:2012 & IS: 14246: 2013 | 40.5 | SQM | 787 | ₹31,873.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
Ten_Doc.pdf
Tender Documents • 1.08 MB
SPE_CON.pdf
Additional Documents • 0.45 MB
Ten_and_dec.pdf
Additional Documents • 0.61 MB
BOQ_2518762.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .