Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.4 L+₹15,061.23 (1.06%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹14.5 L
EMD Value
₹14,500
Closing Date
15 Apr 2025, 3:00 pmClosed
BDO(VP)
BDO, Nangavalli
Salem District - Nangavalli Block - Construction of Compound wall, CC road, Cremation shed, waiting shed, water supply at samathuvapuram Burial ground in masakaliyur sanarapatty Panchayat Sanarapatty Panchayat in AGAMT - II - 2025-2026 Work No.06
2025_RDTN_541726_12
Roc.No.942/2025/T1
Open Tender
Civil Works
Item Wise
90 days
BDO, Nangavalli
As per tender Document
3 documents required · 3 mandatory
₹0
₹14,500
23 Jul 2025
9 Apr 2025
15 Apr 2025
9 Apr 2025
15 Apr 2025
9 Apr 2025
Amount
1.)Construction of compound wall, CC Road, Cremation shed, waiting shed, water supply at samathuva burial ground in masakaliyur sanarapatty.
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Refilling in Foundation ad Basement With Excavated Earth In Layer of not more than 15cm Thick
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Supplying and Erecting shuttering including necessary supports for plane surface in foundation Basement and roof slab strutting upto 3.29m height for plane surfaces for floors for RCC Column Footing columns plinth beam and connected with foundations grade beam raft slab stair case bed blocks critical pier etc
Centering
Supplying and Fabricating and placing in position MS Steel or Ribbed Tor Steel for reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with standard specification
Reinforced Cement Concrete 1:1 1/2:3 Using 20mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and Fabricating charges centring and shuttring but including curing and providing fixtures like fan clamps in the RCC Floor or Roof Slabs
Ceiling Plastering With C.M 1:3 mix 10mm Thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering With C.M 1:5 mix 12mm Thick including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats With Approved cement paint over one coat of priming coat etc with the best approved best quality of synthetic enamel paint of approved colour the existing primimg coat etc complete
Cremation shed
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Supplying and Erecting shuttering including necessary supports for plane surface in foundation Basement and roof slab strutting upto 3.29m height for plane surfaces for floors for RCC Column Footing columns plinth beam and connected with foundations grade beam raft slab stair case bed blocks critical pier etc
Centering
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Supplying and Fabricating and placing in position MS Steel or Ribbed Tor Steel for reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with standard specification
Reinforced Cement Concrete 1:1 1/2:3 Using 20mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and Fabricating charges centring and shuttring but including curing and providing fixtures like fan clamps in the RCC Floor or Roof Slabs
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Providing Fire Resistance Clay Brick Work in White clay using Fire Resistance Bricks including curing etc., complete complying with standard specifications.
Ceiling Plastering With C.M 1:3 mix 10mm Thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering With C.M 1:5 mix 12mm Thick including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats With Approved cement paint over one coat of priming coat etc with the best approved best quality of synthetic enamel paint of approved colour the existing primimg coat etc complete
compound Wall
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Supplying and Erecting shuttering including necessary supports for plane surface in foundation Basement and roof slab strutting upto 3.29m height for plane surfaces for floors for RCC Column Footing columns plinth beam and connected with foundations grade beam raft slab stair case bed blocks critical pier etc
UPTO Basement
Lintel Level
Supplying and Fabricating and placing in position MS Steel or Ribbed Tor Steel for reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with standard specification
Reinforced Cement Concrete 1:1 1/2:3 Using 20mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and Fabricating charges centring and shuttring but including curing and providing fixtures like fan clamps in the RCC Floor or Roof Slabs
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering With C.M 1:5 mix 12mm Thick including cost and conveyance of all materials to site and all labour charges etc complete
Priming Coat Of Plastic Emulsion Cement Plasterd Wall Surface Ceiling and other new surface including cleaning preparing the surface curing scaffolding charges etc
Towards Cost and Supply of of Gril Gate(10'x6') including all Charges etc.
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Provision for HDPE 500 lit. Tank
Construction of pedestal for HDPE tank
Earth work excavation in all soils and subsoils etc., complete for pipe laying works with standard pipe trench and depth etc.,
Supply of 63mm OD 6KSC PVC pipe of ISI standards
Laying and fixing charges for PVC pipe etc., complete as per standard specifications
Refilling the pipe treanch with excavated earth as per standard specifications. Etc., complete
CC Road
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Supplying and Erecting shuttering including necessary supports for plane surface in foundation Basement and roof slab strutting upto 3.29m height for plane surfaces for floors for RCC Column Footing columns plinth beam and connected with foundations grade beam raft slab stair case bed blocks critical pier etc
Providing gravel Soling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications ect.,
Cement concrete 1:3:6 mix using 20mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S Thambidurai Contractor (BID ID -1294769)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .