Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2 Cr
Closing Date
27 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SR. DGM (CS-G3)
Gurgaon
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling Ss b. Extension of 400kV Koppal PS associated with Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC.
TBCB/400kV/Gadag/SS01/G3
Open Limited
Power/Energy Projects/Products
Works
Gadag
₹2 Cr
27 Jun 2022
3 Jun 2022
29 Jun 2022
3 Jun 2022
27 Jun 2022
3 Jun 2022
9 Jun 2022
Package Name Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Package Code SS01
Specification No. Spec. No.: TBCB/400kV/Gadag/SS01/G3
Spec. No.: TBCB/400kV/Gadag/SS01/G3
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3 and Bid Form 2nd Envelope.
2 All the cells in Sch-5 & Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mmm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Installation Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Goods) :
● No cell is required to be filled in by the bidder in this worksheet.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Not applicable, hence no cell is required to be filled up.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid from 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Sole Bidder 1
JV (Joint Venture) 2 or More
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] Sole Bidder 0
Name of Sole Bidder
Address of Sole Bidder
Name of other Partner
Address of other Partner
Name of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
Address of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
email ID of Bid Signatory
Mobile No. of Bid Signatory
Tel No. of Bid Signatory
Fax No. of Bid Signatory
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 1 Direct Total #REF! Sole Bidder `
BO Total #REF! 0
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : Power Grid Corporation of India Ltd., &
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Activity Description Material Code HSN Code Whether HSN in column ‘ 2 ’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Item Description Unit Qty. Unit Ex-works price (excluding GST) Total Ex-works price (excluding GST) GST as confirmed by Bidder
I Extn. of 400kV Gadag PS
1 420kV, 63kA AIS Equipment 1000004501 85352913 18 420kV, 3150A, 63kA Circuit Breaker (3-Phase) without closing resistorand with Support Structure EA 8.00 Included 0.00 0 0.00
2 420kV, 63kA AIS Equipment 1000004463 85359090 18 420 kV, 3000A, 63KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 24.00 Included 0.00 0 0.00
3 420kV, 63kA AIS Equipment 1000004535 85359090 18 420 kV, 4400 pF Capacitive Voltage Transformer (1-Phase) EA 6.00 Included 0.00 0 0.00
4 420kV, 63kA AIS Equipment 1000004498 85353090 18 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S EA 29.00 Included 0.00 0 0.00
5 420kV, 63kA AIS Equipment 1000020419 85354010 18 336kV Surge Arrester (1-phase) EA 15.00 Included 0.00 0 0.00
6 420kV, 63kA AIS Equipment 1000004401 85462040 18 420 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 21.00 Included 0.00 0 0.00
7 420kV, 63kA AIS Equipment 1000004400 85462040 18 420 kV ,1 phase Bus Post Insulators for Line Traps EA 12.00 Included 0.00 0 0.00
8 420kV Erection Hardware 1000011318 72169990 18 Erection Hardware for 400kV I type layout-Bus Work (For one diameter)as per technical specification SET 3.00 Included 0.00 0 0.00
9 420kV Erection Hardware 1000011322 72169990 18 Erection Hardware for 400kV I type layout-Line bay as per technicalspecification SET 2.00 Included 0.00 0 0.00
10 420kV Erection Hardware 1000011326 72169990 18 Erection Hardware for 400kV I type layout-Spare bay of half dia as pertechnical specification SET 1.00 Included 0.00 0 0.00
11 420kV Erection Hardware 1000011327 72169990 18 Erection Hardware for 400kV I type layout-Transformer bay as pertechnical specification SET 3.00 Included 0.00 0 0.00
12 420kV Insulator and Hardware 1000055984 72169990 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 30.00 Included 0.00 0 0.00
13 420kV Insulator and Hardware 1000055991 72169990 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 30.00 Included 0.00 0 0.00
14 420kV Insulator and Hardware 1000055985 72169990 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 6.00 Included 0.00 0 0.00
15 420kV Insulator and Hardware 1000055986 72169990 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 6.00 Included 0.00 0 0.00
16 420kV Insulator and Hardware 1000055987 72169990 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 9.00 Included 0.00 0 0.00
17 Earthmat 1000032055 72159090 18 40 MM MS ROD FOR MAIN EARTHMAT KM 3.00 Included 0.00 0 0.00
18 420kV Control & Relay Panel 1000002146 85371000 18 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1.00 Included 0.00 0 0.00
19 420kV Control & Relay Panel 1000003398 85371000 18 400kV Line Protection Panel (with Automation) EA 2.00 Included 0.00 0 0.00
20 420kV Control & Relay Panel 1000055446 85371000 18 400KV CIRCUIT BREAKER RELAY PANEL (WITH AUTOMATION) EA 8.00 Included 0.00 0 0.00
21 420kV Control & Relay Panel 1000004274 85371000 18 400kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3.00 Included 0.00 0 0.00
22 SAS-Augmentation 1000003409 85371000 18 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 5.00 Included 0.00 0 0.00
23 SAS-Augmentation 1000003411 85371000 18 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 3.00 Included 0.00 0 0.00
24 SAS-Augmentation 1000001333 85371000 18 Augmentation of Substation automation System for 220kV bay as perTechnical Specification EA 7.00 Included 0.00 0 0.00
25 Visual Monitoring System 1000030433 85287390 18 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1.00 Included 0.00 0 0.00
26 PLCC Equipment 1000004290 85176210 18 400kV,3150A,0.5mH ,63kA Line Trap EA 4.00 Included 0.00 0 0.00
27 PLCC Equipment 1000010014 85176210 18 Coupling device for PLCC SET 2.00 Included 0.00 0 0.00
28 PLCC Equipment 1000000046 85176210 18 Carrier Equipment Analog type (for Speech+Data & Speech+Protection) EA 2.00 Included 0.00 0 0.00
29 PLCC Equipment 1000017887 85176210 18 Analog Protection Coupler for PLCC EA 2.00 Included 0.00 0 0.00
30 PLCC Equipment 1000010638 85176210 18 Digital Protection Coupler EA 2.00 Included 0.00 0 0.00
31 PLCC Equipment 1000025769 85176210 18 Testing & Maintenance equipment (print test kit only) for PLCC SET 1.00 Included 0.00 0 0.00
32 PLCC Equipment 1000036908 85446020 18 HF CABLE 75 OHMS FOR PLCC KM 0.50 Included 0.00 0 0.00
33 Power & Control Cable 1000056265 85446020 18 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 3.50 Included 0.00 0 0.00
34 Power & Control Cable 1000056264 85446020 18 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 3.00 Included 0.00 0 0.00
35 Power & Control Cable 1000031887 85446020 18 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 12.00 Included 0.00 0 0.00
36 Power & Control Cable 1000031987 85446020 18 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 25.00 Included 0.00 0 0.00
37 Power & Control Cable 1000031964 85446020 18 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 15.00 Included 0.00 0 0.00
38 Power & Control Cable 1000031943 85446020 18 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 0.50 Included 0.00 0 0.00
39 Power & Control Cable 1000031985 85446020 18 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 4.00 Included 0.00 0 0.00
40 Power & Control Cable 1000031953 85446020 18 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 4.00 Included 0.00 0 0.00
41 Power & Control Cable 1000031957 85446020 18 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 3.00 Included 0.00 0 0.00
42 Air Conditioning & Ventilation System 1000006285 84151090 28 Air conditioning system for Switchyard Panel Room of 9m length SET 1.00 Included 0.00 0 0.00
43 Air Conditioning & Ventilation System 1000006284 84151090 28 Air conditioning system for Switchyard Panel Room of 6m length SET 3.00 Included 0.00 0 0.00
44 Fire Fighting System 1000012019 85311020 18 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 1.00 Included 0.00 0 0.00
45 Fire Fighting System 1000012022 84241000 18 4.5 kg CO2 type Portable Fire extinguisher EA 4.00 Included 0.00 0 0.00
46 Fire Fighting System 1000055456 84248990 18 HVW SPRAY SYSTEM, HYDRANT SYSTEM AND COMPLETE U/G & O/G PIPING ANDACCESSORIES ETC. OUT SIDE THE PUMP HOUSE FOR 400KV, 3-PHASEAUTOTRANSFORMER SET 3.00 Included 0.00 0 0.00
47 Fire Fighting System 1000012018 85311020 18 Fire Detection and Alarm System for Switchyard Panel Room of 6 mlength SET 3.00 Included 0.00 0 0.00
48 Illumination System 1000014547 85371000 18 Lighting Panel type ACP-2 as per technical specification EA 2.00 Included 0.00 0 0.00
49 Illumination System 1000038387 94051090 18 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 15.00 Included 0.00 0 0.00
50 Illumination System 1000038325 94059900 18 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 15.00 Included 0.00 0 0.00
51 Illumination System 1000013796 94059900 18 Illumination System for switchyard panel room of 9 m length LS 1.00 Included 0.00 0 0.00
52 Illumination System 1000013795 94059900 18 Illumination System for switchyard panel room of 6 m length LS 3.00 Included 0.00 0 0.00
53 400kV Equipment Support Structures 1000049656 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV WAVE TRAP (1PH) EA 4.00 Included 0.00 0 0.00
54 400kV Equipment Support Structures 1000049655 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 15.00 Included 0.00 0 0.00
55 400kV Equipment Support Structures 1000049654 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CVT (1PH) EA 6.00 Included 0.00 0 0.00
56 400kV Equipment Support Structures 1000049653 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 24.00 Included 0.00 0 0.00
57 400kV Equipment Support Structures 1000049652 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 21.00 Included 0.00 0 0.00
58 400kV Equipment Support Structures 1000049657 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 29.00 Included 0.00 0 0.00
59 Mandatory Spare LOT 1000019918 85359090 18 Spares for 420kV Circuit Breaker LS 1.00 Included 0.00 0 0.00
60 Mandatory Spare LOT 1000019919 85353090 18 Spares for 420kV Double break Isolator LS 1.00 Included 0.00 0 0.00
61 Mandatory Spare LOT 1000024186 85354010 18 SPARES FOR 336KV SURGE ARRESTER LS 1.00 Included 0.00 0 0.00
62 Mandatory Spare LOT 1000025943 85359090 18 Spare-420kV CVT 1 SET 1.00 Included 0.00 0 0.00
63 Mandatory Spare LOT 1000025940 85462040 18 Spare-420kV BPI SET 1.00 Included 0.00 0 0.00
64 Mandatory Spare LOT 1000025941 85389000 18 Spare-420kV CT 1 SET 1.00 Included 0.00 0 0.00
65 Mandatory Spare LOT 1000019912 85371000 18 Relay & protection Panels (with automation) LS 1.00 Included 0.00 0 0.00
66 Mandatory Spare LOT 1000019927 85389000 18 Spares-Substation Automation System LS 1.00 Included 0.00 0 0.00
67 Mandatory Spare LOT 1000025950 85176210 18 Spare-PLCC SET 1.00 Included 0.00 0 0.00
68 Mandatory Spare LOT 1000053851 76169990 18 SPARES FOR CLAMPS & CONNECTORS LOT 1.00 Included 0.00 0 0.00
69 Mandatory Spare LOT 1000025935 85389000 18 Spare-245kV Circuit Breaker SET 1.00 Included 0.00 0 0.00
70 Mandatory Spare LOT 1000025936 85353090 18 Spare-245kV Isolator SET 1.00 Included 0.00 0 0.00
71 Mandatory Spare LOT 1000025933 85389000 18 Spare-245kV CT SET 1.00 Included 0.00 0 0.00
72 Mandatory Spare LOT 1000025932 85462040 18 Spare-245kV BPI SET 1.00 Included 0.00 0 0.00
73 Mandatory Spare LOT 1000020417 85354010 18 216kV Surge Arrester (1-phase) EA 1.00 Included 0.00 0 0.00
74 245kV, 50kA AIS Equipment 1000001683 85352912 18 245kV, 1600A, 50KA Circuit Breaker(3-Phase) with support structure EA 7.00 Included 0.00 0 0.00
75 245kV, 50kA AIS Equipment 1000001689 85353090 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S EA 7.00 Included 0.00 0 0.00
76 245kV, 50kA AIS Equipment 1000001688 85353090 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S EA 7.00 Included 0.00 0 0.00
77 245kV, 50kA AIS Equipment 1000032777 85353090 18 245KV, 1600 A, 50KA, 3-PHASE, DOUBLE BREAK TANDEM ISOLATOR WITHOUT E/S EA 14.00 Included 0.00 0 0.00
78 245kV, 50kA AIS Equipment 1000001684 85359090 18 245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 21.00 Included 0.00 0 0.00
79 245kV, 50kA AIS Equipment 1000001772 85359090 18 245 kV, 4400pf Capacitive Voltage Transformer (1- Phase) EA 12.00 Included 0.00 0 0.00
80 245kV, 50kA AIS Equipment 1000020417 85354010 18 216kV Surge Arrester (1-phase) EA 21.00 Included 0.00 0 0.00
81 245kV, 50kA AIS Equipment 1000001695 85462040 18 245 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 103.00 Included 0.00 0 0.00
82 245kV Erection Hardware 1000011261 72169990 18 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Line Bay as per technical specification SET 4.00 Included 0.00 0 0.00
83 245kV Erection Hardware 1000011264 72169990 18 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Transformer Bay as per technical specification SET 3.00 Included 0.00 0 0.00
84 245kV Erection Hardware 1000011255 72169990 18 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Bus work (one Bay) as per technical specification SET 7.00 Included 0.00 0 0.00
85 245kV Insulator and Hardware 1000055973 72169990 18 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 18.00 Included 0.00 0 0.00
86 245kV Insulator and Hardware 1000055975 72169990 18 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 12.00 Included 0.00 0 0.00
87 245kV Insulator and Hardware 1000055978 72169990 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 45.00 Included 0.00 0 0.00
88 245kV Insulator and Hardware 1000055981 72169990 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 45.00 Included 0.00 0 0.00
89 245kV Insulator and Hardware 1000055983 72169990 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 12.00 Included 0.00 0 0.00
90 245kV Control & Relay Panel 1000055443 85371000 18 220KV CIRCUIT BREAKER RELAY PANEL (WITH AUTOMATION) EA 7.00 Included 0.00 0 0.00
91 245kV Control & Relay Panel 1000001330 85371000 18 220kV Line Protection Panel (with Automation) EA 4.00 Included 0.00 0 0.00
92 245kV Control & Relay Panel 1000001166 85371000 18 220kV Bus Bar Protection Panel (Single)-(with Automation) SET 1.00 Included 0.00 0 0.00
93 245kV Equipment Support Structure 1000049647 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CT (1PH) EA 21.00 Included 0.00 0 0.00
94 245kV Equipment Support Structure 1000049651 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV ISOLATOR (3PH) EA 28.00 Included 0.00 0 0.00
95 245kV Equipment Support Structure 1000049649 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CLASS SA (1PH) EA 21.00 Included 0.00 0 0.00
96 245kV Equipment Support Structure 1000049646 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV BPI (1PH) EA 58.00 Included 0.00 0 0.00
97 245kV Equipment Support Structure 1000049650 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV WAVE TRAP (1PH) EA 8.00 Included 0.00 0 0.00
98 245kV Equipment Support Structure 1000050459 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH)(BUS HEIGHT-8M APPROX.) SET 21.00 Included 0.00 0 0.00
99 245kV Equipment Support Structure 1000049648 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CVT (1PH) EA 12.00 Included 0.00 0 0.00
100 400 kV Gantry Structures - Supply 1000015954 73082011 18 Fabrication, galvanising and supply of Lattice Structures (MS Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 135.00 Included 0.00 0 0.00
101 400 kV Gantry Structures - Supply 1000015953 73082011 18 Fabrication, galvanising and supply of Lattice Structures (HT Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 129.00 Included 0.00 0 0.00
102 400 kV Gantry Structures - Supply 1000011713 73082011 18 Fabrication, galvanising and supply of fasteners ( nuts, bolts andwashers ) including step bolts for lattice and pipe structures to bedesigned during detailed engineering MT 14.00 Included 0.00 0 0.00
103 400 kV Gantry Structures - Supply 1000012373 73082011 18 Fabrication, galvanising and supply of foundation bolts including nuts,checknut and washers for lattice and pipe structures to be designedduring detailed engineering MT 14.00 Included 0.00 0 0.00
104 BoQ of Comm Equip Supply for GADAGA PS 1000031367 85176260 18 SDH EQUIPMENT (STM-16 MADM UPTO 5 MSP PROTECTED DIRECTIONS)-BASEEQUIPMENT (COMMON CARDS, CROSS CONNECT/CONTROL CARDS, OPTICAL BASECARDS, POWER SUPPLY CARDS, POWER CABLING, OTHER HARDWARE ANDACCESSORIES INCLUDING SUB RACKS, PATCH CORD, DDF ETC FULLY EQUIPEDEXCLUDING OPTICAL INTERFACE & TRIBUTARY CARDS EA 2.00 Included 0.00 0 0.00
105 BoQ of Comm Equip Supply for GADAGA PS 1000018706 85176990 18 S16.1 SFP EA 8.00 Included 0.00 0 0.00
106 BoQ of Comm Equip Supply for GADAGA PS 1000031413 85176290 18 OPTICAL INTERFACE/SFP-V16.2 EA 2.00 Included 0.00 0 0.00
107 BoQ of Comm Equip Supply for GADAGA PS 1000014273 85176990 18 L16.2 SFP EA 8.00 Included 0.00 0 0.00
108 BoQ of Comm Equip Supply for GADAGA PS 1000031374 85176290 18 TRIBUTARY INTERFACE- E1 INTERFACE (MINIMUM 16 NOS.) SET 4.00 Included 0.00 0 0.00
109 BoQ of Comm Equip Supply for GADAGA PS 1000034950 85176990 18 ETHERNET INTERFACE 10/100 BASE T WITH LAYER-2 SWITCHING (MIN 8INTERFACES PER CARD) EA 4.00 Included 0.00 0 0.00
110 BoQ of Comm Equip Supply for GADAGA PS 1000031381 85176290 18 TRIBUTARY INTERFACE-GIGABIT ETHERNET INTERFACES 10/100 MBPS WITH LAYER-2 SWITCHING (MINIMUM 2 NOS.) SET 2.00 Included 0.00 0 0.00
111 BoQ of Comm Equip Supply for GADAGA PS 1000026228 85176290 18 Equipment Cabinets For SDH EA 2.00 Included 0.00 0 0.00
112 BoQ of Comm Equip Supply for GADAGA PS 1000028495 84715000 18 NMS- CRAFT TERMINAL-HARDWARE EA 1.00 Included 0.00 0 0.00
113 BoQ of Comm Equip Supply for GADAGA PS 1000028265 85238020 18 Software for Craft Terminal EA 1.00 Included 0.00 0 0.00
114 BoQ of Comm Equip Supply for GADAGA PS 1000034998 85171890 18 VOIP TELEPHONE INSTRUMENT WITH ONE COMMON SWITCH (MIN. 8 PORT) EA 4.00 Included 0.00 0 0.00
115 BoQ of Comm Equip Supply for GADAGA PS 1000030942 85447090 18 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 2.50 Included 0.00 0 0.00
116 BoQ of Comm Equip Supply for GADAGA PS 1000023471 85372000 18 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F EA 2.00 Included 0.00 0 0.00
117 Comm Equip BoQ Spares GADAG PS 1000031369 85176260 18 SDH EQUIPMENT (STM-16 MADM UPTO 5 MSP PROTECTED DIRECTIONS)-COMMONCARDS, CROSS-CONNECT/CONTROL CARDS, OPTICAL BASE CARD, POWER SUPPLYCARDS, POWER CABLING, OTHER HARDWARE & ACCESSORIES (EACH). SET 1.00 Included 0.00 0 0.00
118 Comm Equip BoQ Spares GADAG PS 1000018706 85176990 18 S16.1 SFP EA 1.00 Included 0.00 0 0.00
119 Comm Equip BoQ Spares GADAG PS 1000031413 85176290 18 OPTICAL INTERFACE/SFP-V16.2 EA 1.00 Included 0.00 0 0.00
120 Comm Equip BoQ Spares GADAG PS 1000014273 85176990 18 L16.2 SFP EA 1.00 Included 0.00 0 0.00
121 Comm Equip BoQ Spares GADAG PS 1000031374 85176290 18 TRIBUTARY INTERFACE- E1 INTERFACE (MINIMUM 16 NOS.) SET 1.00 Included 0.00 0 0.00
122 Comm Equip BoQ Spares GADAG PS 1000034950 85176990 18 ETHERNET INTERFACE 10/100 BASE T WITH LAYER-2 SWITCHING (MIN 8INTERFACES PER CARD) EA 1.00 Included 0.00 0 0.00
123 Comm Equip BoQ Spares GADAG PS 1000031381 85176290 18 TRIBUTARY INTERFACE-GIGABIT ETHERNET INTERFACES 10/100 MBPS WITH LAYER-2 SWITCHING (MINIMUM 2 NOS.) SET 1.00 Included 0.00 0 0.00
124 Comm Equip BoQ Spares GADAG PS 1000034998 85171890 18 VOIP TELEPHONE INSTRUMENT WITH ONE COMMON SWITCH (MIN. 8 PORT) EA 1.00 Included 0.00 0 0.00
125 Comm Equip BoQ Spares GADAG PS 1000031398 85171890 18 PRE CONNECTORIZED OPTICAL FIBER PATCH CORDS(10 MTRS) – PACK OF SIXPATCH CORDS SET 1.00 Included 0.00 0 0.00
126 Comm Equip BoQ Spares GADAG PS 1000030942 85447090 18 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 1.00 Included 0.00 0 0.00
127 BoQ of PMU for GADAG-Supply 1000017518 85364900 18 PMU with GPS Clock (clock can be either internal or external) EA 2.00 Included 0.00 0 0.00
128 BoQ of PMU for GADAG-Supply 1000022512 90311000 18 WAMS Hardware - Time System (GPS receiver) EA 2.00 Included 0.00 0 0.00
129 BoQ of PMU for GADAG-Supply 1000022510 85176290 18 WAMS Hardware - Substation Grade Layer-3 LAN Switches with minimum 4 x10/100 Mbps Ethernet ports and 2 x 1 Gbps Ethernet ports EA 3.00 Included 0.00 0 0.00
130 BoQ of PMU for GADAG-Supply 1000022487 85447090 18 WAMS Miscellaneous - Armored Fibre Optic Cable and associatedtermination (e.g. L2 Switch) for connecting PMU panels located indifferent control room of a station EA 1.00 Included 0.00 0 0.00
II Extn. of 400kV Koppal PS
131 420kV, 63kA AIS EQUIPMENT 1000004501 85352913 18 420kV, 3150A, 63kA Circuit Breaker (3-Phase) without closing resistorand with Support Structure EA 4.00 Included 0.00 0 0.00
132 420kV, 63kA AIS EQUIPMENT 1000004463 85359090 18 420 kV, 3000A, 63KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 12.00 Included 0.00 0 0.00
133 420kV, 63kA AIS EQUIPMENT 1000004535 85359090 18 420 kV, 4400 pF Capacitive Voltage Transformer (1-Phase) EA 6.00 Included 0.00 0 0.00
134 420kV, 63kA AIS EQUIPMENT 1000004498 85353090 18 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S EA 10.00 Included 0.00 0 0.00
135 420kV, 63kA AIS EQUIPMENT 1000020419 85354010 18 336kV Surge Arrester (1-phase) EA 6.00 Included 0.00 0 0.00
136 420kV, 63kA AIS EQUIPMENT 1000004401 85462040 18 420 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 10.00 Included 0.00 0 0.00
137 420kV, 63kA AIS EQUIPMENT 1000004400 85462040 18 420 kV ,1 phase Bus Post Insulators for Line Traps EA 12.00 Included 0.00 0 0.00
138 420kV Erection Hardware 1000011318 72169990 18 Erection Hardware for 400kV I type layout-Bus Work (For one diameter)as per technical specification SET 2.00 Included 0.00 0 0.00
139 420kV Erection Hardware 1000011322 72169990 18 Erection Hardware for 400kV I type layout-Line bay as per technicalspecification SET 2.00 Included 0.00 0 0.00
140 420kV Erection Hardware 1000011326 72169990 18 Erection Hardware for 400kV I type layout-Spare bay of half dia as pertechnical specification SET 2.00 Included 0.00 0 0.00
141 420kV Insulator and Hardware 1000055984 72169990 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 12.00 Included 0.00 0 0.00
142 420kV Insulator and Hardware 1000055991 72169990 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 12.00 Included 0.00 0 0.00
143 420kV Insulator and Hardware 1000055985 72169990 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 6.00 Included 0.00 0 0.00
144 420kV Insulator and Hardware 1000055986 72169990 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 6.00 Included 0.00 0 0.00
145 Earthmat 1000032055 72159090 18 40 MM MS ROD FOR MAIN EARTHMAT KM 2.50 Included 0.00 0 0.00
146 420kV Control & Relay Panel 1000002146 85371000 18 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1.00 Included 0.00 0 0.00
147 420kV Control & Relay Panel 1000003398 85371000 18 400kV Line Protection Panel (with Automation) EA 2.00 Included 0.00 0 0.00
148 420kV Control & Relay Panel 1000055446 85371000 18 400KV CIRCUIT BREAKER RELAY PANEL (WITH AUTOMATION) EA 4.00 Included 0.00 0 0.00
149 SAS-Augmentation 1000003409 85371000 18 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 2.00 Included 0.00 0 0.00
150 SAS-Augmentation 1000003411 85371000 18 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 2.00 Included 0.00 0 0.00
151 Visual Monitoring System 1000030433 85287390 18 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1.00 Included 0.00 0 0.00
152 PLCC Equipment 1000004290 85176210 18 400kV,3150A,0.5mH ,63kA Line Trap EA 4.00 Included 0.00 0 0.00
153 PLCC Equipment 1000010014 85176210 18 Coupling device for PLCC SET 2.00 Included 0.00 0 0.00
154 PLCC Equipment 1000000046 85176210 18 Carrier Equipment Analog type (for Speech+Data & Speech+Protection) EA 2.00 Included 0.00 0 0.00
155 PLCC Equipment 1000017887 85176210 18 Analog Protection Coupler for PLCC EA 2.00 Included 0.00 0 0.00
156 PLCC Equipment 1000010638 85176210 18 Digital Protection Coupler EA 2.00 Included 0.00 0 0.00
157 PLCC Equipment 1000025769 85176210 18 Testing & Maintenance equipment (print test kit only) for PLCC SET 1.00 Included 0.00 0 0.00
158 PLCC Equipment 1000036908 85446020 18 HF CABLE 75 OHMS FOR PLCC KM 0.50 Included 0.00 0 0.00
159 Power & Control Cable 1000056265 85446020 18 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 2.50 Included 0.00 0 0.00
160 Power & Control Cable 1000056264 85446020 18 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 2.00 Included 0.00 0 0.00
161 Power & Control Cable 1000031887 85446020 18 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 4.00 Included 0.00 0 0.00
162 Power & Control Cable 1000031987 85446020 18 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 5.00 Included 0.00 0 0.00
163 Power & Control Cable 1000031964 85446020 18 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 3.00 Included 0.00 0 0.00
164 Power & Control Cable 1000031943 85446020 18 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 0.50 Included 0.00 0 0.00
165 Power & Control Cable 1000031985 85446020 18 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 4.00 Included 0.00 0 0.00
166 Power & Control Cable 1000031953 85446020 18 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 1.20 Included 0.00 0 0.00
167 Power & Control Cable 1000031957 85446020 18 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 1.00 Included 0.00 0 0.00
168 Air Conditioning & Ventilation System 1000006285 84151090 28 Air conditioning system for Switchyard Panel Room of 9m length SET 1.00 Included 0.00 0 0.00
169 Fire Fighting System 1000012019 85311020 18 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 1.00 Included 0.00 0 0.00
170 Fire Fighting System 1000012022 84241000 18 4.5 kg CO2 type Portable Fire extinguisher EA 1.00 Included 0.00 0 0.00
171 Illumination System 1000014547 85371000 18 Lighting Panel type ACP-2 as per technical specification EA 2.00 Included 0.00 0 0.00
172 Illumination System 1000038387 94051090 18 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 10.00 Included 0.00 0 0.00
173 Illumination System 1000038325 94059900 18 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 10.00 Included 0.00 0 0.00
174 Illumination System 1000013796 94059900 18 Illumination System for switchyard panel room of 9 m length LS 1.00 Included 0.00 0 0.00
175 420kV Equipment Support Structure 1000049656 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV WAVE TRAP (1PH) EA 4.00 Included 0.00 0 0.00
176 420kV Equipment Support Structure 1000049655 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 6.00 Included 0.00 0 0.00
177 420kV Equipment Support Structure 1000049654 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CVT (1PH) EA 6.00 Included 0.00 0 0.00
178 420kV Equipment Support Structure 1000049653 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 12.00 Included 0.00 0 0.00
179 420kV Equipment Support Structure 1000049652 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 10.00 Included 0.00 0 0.00
180 420kV Equipment Support Structure 1000049657 73045930 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 10.00 Included 0.00 0 0.00
181 Mandatory Spare LOT 1000019918 85359090 18 Spares for 420kV Circuit Breaker LS 1.00 Included 0.00 0 0.00
182 Mandatory Spare LOT 1000019919 85353090 18 Spares for 420kV Double break Isolator LS 1.00 Included 0.00 0 0.00
183 Mandatory Spare LOT 1000024186 85354010 18 SPARES FOR 336KV SURGE ARRESTER LS 1.00 Included 0.00 0 0.00
184 Mandatory Spare LOT 1000025943 85359090 18 Spare-420kV CVT 1 SET 1.00 Included 0.00 0 0.00
185 Mandatory Spare LOT 1000025940 85462040 18 Spare-420kV BPI SET 1.00 Included 0.00 0 0.00
186 Mandatory Spare LOT 1000025941 85389000 18 Spare-420kV CT 1 SET 1.00 Included 0.00 0 0.00
187 Mandatory Spare LOT 1000019912 85371000 18 Relay & protection Panels (with automation) LS 1.00 Included 0.00 0 0.00
188 Mandatory Spare LOT 1000019927 85389000 18 Spares-Substation Automation System LS 1.00 Included 0.00 0 0.00
189 Mandatory Spare LOT 1000025950 85176210 18 Spare-PLCC SET 1.00 Included 0.00 0 0.00
190 Mandatory Spare LOT 1000053851 76169990 18 SPARES FOR CLAMPS & CONNECTORS LOT 1.00 Included 0.00 0 0.00
191 BoQ of Comm Equip Supply at Kopal PS 1000031367 85176260 18 SDH EQUIPMENT (STM-16 MADM UPTO 5 MSP PROTECTED DIRECTIONS)-BASEEQUIPMENT (COMMON CARDS, CROSS CONNECT/CONTROL CARDS, OPTICAL BASECARDS, POWER SUPPLY CARDS, POWER CABLING, OTHER HARDWARE ANDACCESSORIES INCLUDING SUB RACKS, PATCH CORD, DDF ETC FULLY EQUIPEDEXCLUDING OPTICAL INTERFACE & TRIBUTARY CARDS EA 1.00 Included 0.00 0 0.00
192 BoQ of Comm Equip Supply at Kopal PS 1000018706 85176990 18 S16.1 SFP EA 4.00 Included 0.00 0 0.00
193 BoQ of Comm Equip Supply at Kopal PS 1000031413 85176290 18 OPTICAL INTERFACE/SFP-V16.2 EA 2.00 Included 0.00 0 0.00
194 BoQ of Comm Equip Supply at Kopal PS 1000031374 85176290 18 TRIBUTARY INTERFACE- E1 INTERFACE (MINIMUM 16 NOS.) SET 2.00 Included 0.00 0 0.00
195 BoQ of Comm Equip Supply at Kopal PS 1000034950 85176990 18 ETHERNET INTERFACE 10/100 BASE T WITH LAYER-2 SWITCHING (MIN 8INTERFACES PER CARD) EA 2.00 Included 0.00 0 0.00
196 BoQ of Comm Equip Supply at Kopal PS 1000031381 85176290 18 TRIBUTARY INTERFACE-GIGABIT ETHERNET INTERFACES 10/100 MBPS WITH LAYER-2 SWITCHING (MINIMUM 2 NOS.) SET 1.00 Included 0.00 0 0.00
197 BoQ of Comm Equip Supply at Kopal PS 1000026228 85176290 18 Equipment Cabinets For SDH EA 1.00 Included 0.00 0 0.00
198 BoQ of Comm Equip Supply at Kopal PS 1000034998 85171890 18 VOIP TELEPHONE INSTRUMENT WITH ONE COMMON SWITCH (MIN. 8 PORT) EA 2.00 Included 0.00 0 0.00
199 BoQ of Comm Equip Supply at Kopal PS 1000030942 85447090 18 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 1.00 Included 0.00 0 0.00
200 BoQ of Comm Equip Supply at Kopal PS 1000023471 85372000 18 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F EA 1.00 Included 0.00 0 0.00
201 BoQ of PMU for KOPPAL-Supply 1000017518 85364900 18 PMU with GPS Clock (clock can be either internal or external) EA 2.00 Included 0.00 0 0.00
202 BoQ of PMU for KOPPAL-Supply 1000022512 90311000 18 WAMS Hardware - Time System (GPS receiver) EA 2.00 Included 0.00 0 0.00
203 BoQ of PMU for KOPPAL-Supply 1000022510 85176290 18 WAMS Hardware - Substation Grade Layer-3 LAN Switches with minimum 4 x10/100 Mbps Ethernet ports and 2 x 1 Gbps Ethernet ports EA 3.00 Included 0.00 0 0.00
204 BoQ of PMU for KOPPAL-Supply 1000022487 85447090 18 WAMS Miscellaneous - Armored Fibre Optic Cable and associatedtermination (e.g. L2 Switch) for connecting PMU panels located indifferent control room of a station EA 1.00 Included 0.00 0 0.00
205 400 kV Gantry Structures - Supply 1000015954 73082011 18 Fabrication, galvanising and supply of Lattice Structures (MS Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 39.60 Included 0.00 0 0.00
206 400 kV Gantry Structures - Supply 1000015953 73082011 18 Fabrication, galvanising and supply of Lattice Structures (HT Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 40.60 Included 0.00 0 0.00
207 400 kV Gantry Structures - Supply 1000011713 73082011 18 Fabrication, galvanising and supply of fasteners ( nuts, bolts andwashers ) including step bolts for lattice and pipe structures to bedesigned during detailed engineering MT 3.60 Included 0.00 0 0.00
208 400 kV Gantry Structures - Supply 1000012373 73082011 18 Fabrication, galvanising and supply of foundation bolts including nuts,checknut and washers for lattice and pipe structures to be designed during detailed engineering MT 3.60 Included 0.00 0 0.00
Total Ex-works Price 0.00 0 0.00
Total GST as confirmed by Bidder 0.00
Total Ex-works Price 0.00
Total Type Test charges as per Schedule-7 Not Applicable
Total Ex-works Price including Type Test charges 0.00
Total GST Tax as confirmed by Bidder 0.00
Note : Specify amount of GST on the transaction between the Contractor and the Employer.
* In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 1 Direct Total 0 Sole Bidder `
BO Total #REF! 0
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(SCHEDULE OF RATES AND PRICES : EX-WORKS PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd., &
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted. Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Item Description Unit Qty. Unit Ex-works price Total Ex-works price Mode of Transaction (Direct / Bought-out)
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total Ex-Works Price Direct 0.00 Direct
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 0.00 #REF! #REF!
Total Ex-works Price including Type Test charges 0.00 #REF! #REF!
Discount Sch-1 #REF! MPD Sch-1 #REF!
Dis Alert #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
Place : Printed Name :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 2 Dis
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES : FREIGHT & INSURANCE CHARGES) AS per Percent #REF!
As per lum-sum on Sch-2 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-2 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Sector-29, Multipackage Discount 0.00%
Gurgaon (Haryana) - 122001
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total F&I Price #REF!
Place : Printed Name :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 2 Direct Total #REF! Sole Bidder `
BO Total #REF! 0
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : Power Grid Corporation of India Ltd., &
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Local Transportation, Insurance and other Incidental Services Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Activity Description Material Code Item Description Unit Qty. Unit F&I price Total F&I price
I Extn. of 400kV Gadag PS
1 420kV, 63kA AIS Equipment 1000004501 420kV, 3150A, 63kA Circuit Breaker (3-Phase) without closing resistorand with Support Structure EA 8.00 Included
2 420kV, 63kA AIS Equipment 1000004463 420 kV, 3000A, 63KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 24.00 Included
3 420kV, 63kA AIS Equipment 1000004535 420 kV, 4400 pF Capacitive Voltage Transformer (1-Phase) EA 6.00 Included
4 420kV, 63kA AIS Equipment 1000004498 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S EA 29.00 Included
5 420kV, 63kA AIS Equipment 1000020419 336kV Surge Arrester (1-phase) EA 15.00 Included
6 420kV, 63kA AIS Equipment 1000004401 420 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 21.00 Included
7 420kV, 63kA AIS Equipment 1000004400 420 kV ,1 phase Bus Post Insulators for Line Traps EA 12.00 Included
8 420kV Erection Hardware 1000011318 Erection Hardware for 400kV I type layout-Bus Work (For one diameter)as per technical specification SET 3.00 Included
9 420kV Erection Hardware 1000011322 Erection Hardware for 400kV I type layout-Line bay as per technicalspecification SET 2.00 Included
10 420kV Erection Hardware 1000011326 Erection Hardware for 400kV I type layout-Spare bay of half dia as pertechnical specification SET 1.00 Included
11 420kV Erection Hardware 1000011327 Erection Hardware for 400kV I type layout-Transformer bay as pertechnical specification SET 3.00 Included
12 420kV Insulator and Hardware 1000055984 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 30.00 Included
13 420kV Insulator and Hardware 1000055991 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 30.00 Included
14 420kV Insulator and Hardware 1000055985 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 6.00 Included
15 420kV Insulator and Hardware 1000055986 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 6.00 Included
16 420kV Insulator and Hardware 1000055987 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 9.00 Included
17 Earthmat 1000032055 40 MM MS ROD FOR MAIN EARTHMAT KM 3.00 Included
18 420kV Control & Relay Panel 1000002146 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1.00 Included
19 420kV Control & Relay Panel 1000003398 400kV Line Protection Panel (with Automation) EA 2.00 Included
20 420kV Control & Relay Panel 1000055446 400KV CIRCUIT BREAKER RELAY PANEL (WITH AUTOMATION) EA 8.00 Included
21 420kV Control & Relay Panel 1000004274 400kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3.00 Included
22 SAS-Augmentation 1000003409 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 5.00 Included
23 SAS-Augmentation 1000003411 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 3.00 Included
24 SAS-Augmentation 1000001333 Augmentation of Substation automation System for 220kV bay as perTechnical Specification EA 7.00 Included
25 Visual Monitoring System 1000030433 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1.00 Included
26 PLCC Equipment 1000004290 400kV,3150A,0.5mH ,63kA Line Trap EA 4.00 Included
27 PLCC Equipment 1000010014 Coupling device for PLCC SET 2.00 Included
28 PLCC Equipment 1000000046 Carrier Equipment Analog type (for Speech+Data & Speech+Protection) EA 2.00 Included
29 PLCC Equipment 1000017887 Analog Protection Coupler for PLCC EA 2.00 Included
30 PLCC Equipment 1000010638 Digital Protection Coupler EA 2.00 Included
31 PLCC Equipment 1000025769 Testing & Maintenance equipment (print test kit only) for PLCC SET 1.00 Included
32 PLCC Equipment 1000036908 HF CABLE 75 OHMS FOR PLCC KM 0.50 Included
33 Power & Control Cable 1000056265 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 3.50 Included
34 Power & Control Cable 1000056264 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 3.00 Included
35 Power & Control Cable 1000031887 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 12.00 Included
36 Power & Control Cable 1000031987 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 25.00 Included
37 Power & Control Cable 1000031964 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 15.00 Included
38 Power & Control Cable 1000031943 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 0.50 Included
39 Power & Control Cable 1000031985 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 4.00 Included
40 Power & Control Cable 1000031953 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 4.00 Included
41 Power & Control Cable 1000031957 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 3.00 Included
42 Air Conditioning & Ventilation System 1000006285 Air conditioning system for Switchyard Panel Room of 9m length SET 1.00 Included
43 Air Conditioning & Ventilation System 1000006284 Air conditioning system for Switchyard Panel Room of 6m length SET 3.00 Included
44 Fire Fighting System 1000012019 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 1.00 Included
45 Fire Fighting System 1000012022 4.5 kg CO2 type Portable Fire extinguisher EA 4.00 Included
46 Fire Fighting System 1000055456 HVW SPRAY SYSTEM, HYDRANT SYSTEM AND COMPLETE U/G & O/G PIPING ANDACCESSORIES ETC. OUT SIDE THE PUMP HOUSE FOR 400KV, 3-PHASEAUTOTRANSFORMER SET 3.00 Included
47 Fire Fighting System 1000012018 Fire Detection and Alarm System for Switchyard Panel Room of 6 mlength SET 3.00 Included
48 Illumination System 1000014547 Lighting Panel type ACP-2 as per technical specification EA 2.00 Included
49 Illumination System 1000038387 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 15.00 Included
50 Illumination System 1000038325 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 15.00 Included
51 Illumination System 1000013796 Illumination System for switchyard panel room of 9 m length LS 1.00 Included
52 Illumination System 1000013795 Illumination System for switchyard panel room of 6 m length LS 3.00 Included
53 400kV Equipment Support Structures 1000049656 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV WAVE TRAP (1PH) EA 4.00 Included
54 400kV Equipment Support Structures 1000049655 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 15.00 Included
55 400kV Equipment Support Structures 1000049654 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CVT (1PH) EA 6.00 Included
56 400kV Equipment Support Structures 1000049653 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 24.00 Included
57 400kV Equipment Support Structures 1000049652 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 21.00 Included
58 400kV Equipment Support Structures 1000049657 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 29.00 Included
59 Mandatory Spare LOT 1000019918 Spares for 420kV Circuit Breaker LS 1.00 Included
60 Mandatory Spare LOT 1000019919 Spares for 420kV Double break Isolator LS 1.00 Included
61 Mandatory Spare LOT 1000024186 SPARES FOR 336KV SURGE ARRESTER LS 1.00 Included
62 Mandatory Spare LOT 1000025943 Spare-420kV CVT 1 SET 1.00 Included
63 Mandatory Spare LOT 1000025940 Spare-420kV BPI SET 1.00 Included
64 Mandatory Spare LOT 1000025941 Spare-420kV CT 1 SET 1.00 Included
65 Mandatory Spare LOT 1000019912 Relay & protection Panels (with automation) LS 1.00 Included
66 Mandatory Spare LOT 1000019927 Spares-Substation Automation System LS 1.00 Included
67 Mandatory Spare LOT 1000025950 Spare-PLCC SET 1.00 Included
68 Mandatory Spare LOT 1000053851 SPARES FOR CLAMPS & CONNECTORS LOT 1.00 Included
69 Mandatory Spare LOT 1000025935 Spare-245kV Circuit Breaker SET 1.00 Included
70 Mandatory Spare LOT 1000025936 Spare-245kV Isolator SET 1.00 Included
71 Mandatory Spare LOT 1000025933 Spare-245kV CT SET 1.00 Included
72 Mandatory Spare LOT 1000025932 Spare-245kV BPI SET 1.00 Included
73 Mandatory Spare LOT 1000020417 216kV Surge Arrester (1-phase) EA 1.00 Included
74 245kV, 50kA AIS Equipment 1000001683 245kV, 1600A, 50KA Circuit Breaker(3-Phase) with support structure EA 7.00 Included
75 245kV, 50kA AIS Equipment 1000001689 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S EA 7.00 Included
76 245kV, 50kA AIS Equipment 1000001688 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S EA 7.00 Included
77 245kV, 50kA AIS Equipment 1000032777 245KV, 1600 A, 50KA, 3-PHASE, DOUBLE BREAK TANDEM ISOLATOR WITHOUT E/S EA 14.00 Included
78 245kV, 50kA AIS Equipment 1000001684 245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 21.00 Included
79 245kV, 50kA AIS Equipment 1000001772 245 kV, 4400pf Capacitive Voltage Transformer (1- Phase) EA 12.00 Included
80 245kV, 50kA AIS Equipment 1000020417 216kV Surge Arrester (1-phase) EA 21.00 Included
81 245kV, 50kA AIS Equipment 1000001695 245 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 103.00 Included
82 245kV Erection Hardware 1000011261 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Line Bay as per technical specification SET 4.00 Included
83 245kV Erection Hardware 1000011264 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Transformer Bay as per technical specification SET 3.00 Included
84 245kV Erection Hardware 1000011255 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Bus work (one Bay) as per technical specification SET 7.00 Included
85 245kV Insulator and Hardware 1000055973 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 18.00 Included
86 245kV Insulator and Hardware 1000055975 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 12.00 Included
87 245kV Insulator and Hardware 1000055978 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 45.00 Included
88 245kV Insulator and Hardware 1000055981 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 45.00 Included
89 245kV Insulator and Hardware 1000055983 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 12.00 Included
90 245kV Control & Relay Panel 1000055443 220KV CIRCUIT BREAKER RELAY PANEL (WITH AUTOMATION) EA 7.00 Included
91 245kV Control & Relay Panel 1000001330 220kV Line Protection Panel (with Automation) EA 4.00 Included
92 245kV Control & Relay Panel 1000001166 220kV Bus Bar Protection Panel (Single)-(with Automation) SET 1.00 Included
93 245kV Equipment Support Structure 1000049647 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CT (1PH) EA 21.00 Included
94 245kV Equipment Support Structure 1000049651 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV ISOLATOR (3PH) EA 28.00 Included
95 245kV Equipment Support Structure 1000049649 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CLASS SA (1PH) EA 21.00 Included
96 245kV Equipment Support Structure 1000049646 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV BPI (1PH) EA 58.00 Included
97 245kV Equipment Support Structure 1000049650 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV WAVE TRAP (1PH) EA 8.00 Included
98 245kV Equipment Support Structure 1000050459 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH)(BUS HEIGHT-8M APPROX.) SET 21.00 Included
99 245kV Equipment Support Structure 1000049648 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CVT (1PH) EA 12.00 Included
100 400 kV Gantry Structures - Supply 1000015954 Fabrication, galvanising and supply of Lattice Structures (MS Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 135.00 Included
101 400 kV Gantry Structures - Supply 1000015953 Fabrication, galvanising and supply of Lattice Structures (HT Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 129.00 Included
102 400 kV Gantry Structures - Supply 1000011713 Fabrication, galvanising and supply of fasteners ( nuts, bolts andwashers ) including step bolts for lattice and pipe structures to bedesigned during detailed engineering MT 14.00 Included
103 400 kV Gantry Structures - Supply 1000012373 Fabrication, galvanising and supply of foundation bolts including nuts,checknut and washers for lattice and pipe structures to be designedduring detailed engineering MT 14.00 Included
104 BoQ of Comm Equip Supply for GADAGA PS 1000031367 SDH EQUIPMENT (STM-16 MADM UPTO 5 MSP PROTECTED DIRECTIONS)-BASEEQUIPMENT (COMMON CARDS, CROSS CONNECT/CONTROL CARDS, OPTICAL BASECARDS, POWER SUPPLY CARDS, POWER CABLING, OTHER HARDWARE ANDACCESSORIES INCLUDING SUB RACKS, PATCH CORD, DDF ETC FULLY EQUIPEDEXCLUDING OPTICAL INTERFACE & TRIBUTARY CARDS EA 2.00 Included
105 BoQ of Comm Equip Supply for GADAGA PS 1000018706 S16.1 SFP EA 8.00 Included
106 BoQ of Comm Equip Supply for GADAGA PS 1000031413 OPTICAL INTERFACE/SFP-V16.2 EA 2.00 Included
107 BoQ of Comm Equip Supply for GADAGA PS 1000014273 L16.2 SFP EA 8.00 Included
108 BoQ of Comm Equip Supply for GADAGA PS 1000031374 TRIBUTARY INTERFACE- E1 INTERFACE (MINIMUM 16 NOS.) SET 4.00 Included
109 BoQ of Comm Equip Supply for GADAGA PS 1000034950 ETHERNET INTERFACE 10/100 BASE T WITH LAYER-2 SWITCHING (MIN 8INTERFACES PER CARD) EA 4.00 Included
110 BoQ of Comm Equip Supply for GADAGA PS 1000031381 TRIBUTARY INTERFACE-GIGABIT ETHERNET INTERFACES 10/100 MBPS WITH LAYER-2 SWITCHING (MINIMUM 2 NOS.) SET 2.00 Included
111 BoQ of Comm Equip Supply for GADAGA PS 1000026228 Equipment Cabinets For SDH EA 2.00 Included
112 BoQ of Comm Equip Supply for GADAGA PS 1000028495 NMS- CRAFT TERMINAL-HARDWARE EA 1.00 Included
113 BoQ of Comm Equip Supply for GADAGA PS 1000028265 Software for Craft Terminal EA 1.00 Included
114 BoQ of Comm Equip Supply for GADAGA PS 1000034998 VOIP TELEPHONE INSTRUMENT WITH ONE COMMON SWITCH (MIN. 8 PORT) EA 4.00 Included
115 BoQ of Comm Equip Supply for GADAGA PS 1000030942 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 2.50 Included
116 BoQ of Comm Equip Supply for GADAGA PS 1000023471 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F EA 2.00 Included
117 Comm Equip BoQ Spares GADAG PS 1000031369 SDH EQUIPMENT (STM-16 MADM UPTO 5 MSP PROTECTED DIRECTIONS)-COMMONCARDS, CROSS-CONNECT/CONTROL CARDS, OPTICAL BASE CARD, POWER SUPPLYCARDS, POWER CABLING, OTHER HARDWARE & ACCESSORIES (EACH). SET 1.00 Included
118 Comm Equip BoQ Spares GADAG PS 1000018706 S16.1 SFP EA 1.00 Included
119 Comm Equip BoQ Spares GADAG PS 1000031413 OPTICAL INTERFACE/SFP-V16.2 EA 1.00 Included
120 Comm Equip BoQ Spares GADAG PS 1000014273 L16.2 SFP EA 1.00 Included
121 Comm Equip BoQ Spares GADAG PS 1000031374 TRIBUTARY INTERFACE- E1 INTERFACE (MINIMUM 16 NOS.) SET 1.00 Included
122 Comm Equip BoQ Spares GADAG PS 1000034950 ETHERNET INTERFACE 10/100 BASE T WITH LAYER-2 SWITCHING (MIN 8INTERFACES PER CARD) EA 1.00 Included
123 Comm Equip BoQ Spares GADAG PS 1000031381 TRIBUTARY INTERFACE-GIGABIT ETHERNET INTERFACES 10/100 MBPS WITH LAYER-2 SWITCHING (MINIMUM 2 NOS.) SET 1.00 Included
124 Comm Equip BoQ Spares GADAG PS 1000034998 VOIP TELEPHONE INSTRUMENT WITH ONE COMMON SWITCH (MIN. 8 PORT) EA 1.00 Included
125 Comm Equip BoQ Spares GADAG PS 1000031398 PRE CONNECTORIZED OPTICAL FIBER PATCH CORDS(10 MTRS) – PACK OF SIXPATCH CORDS SET 1.00 Included
126 Comm Equip BoQ Spares GADAG PS 1000030942 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 1.00 Included
127 BoQ of PMU for GADAG-Supply 1000017518 PMU with GPS Clock (clock can be either internal or external) EA 2.00 Included
128 BoQ of PMU for GADAG-Supply 1000022512 WAMS Hardware - Time System (GPS receiver) EA 2.00 Included
129 BoQ of PMU for GADAG-Supply 1000022510 WAMS Hardware - Substation Grade Layer-3 LAN Switches with minimum 4 x10/100 Mbps Ethernet ports and 2 x 1 Gbps Ethernet ports EA 3.00 Included
130 BoQ of PMU for GADAG-Supply 1000022487 WAMS Miscellaneous - Armored Fibre Optic Cable and associatedtermination (e.g. L2 Switch) for connecting PMU panels located indifferent control room of a station EA 1.00 Included
II Extn. of 400kV Koppal PS
131 420kV, 63kA AIS EQUIPMENT 1000004501 420kV, 3150A, 63kA Circuit Breaker (3-Phase) without closing resistorand with Support Structure EA 4.00 Included
132 420kV, 63kA AIS EQUIPMENT 1000004463 420 kV, 3000A, 63KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 12.00 Included
133 420kV, 63kA AIS EQUIPMENT 1000004535 420 kV, 4400 pF Capacitive Voltage Transformer (1-Phase) EA 6.00 Included
134 420kV, 63kA AIS EQUIPMENT 1000004498 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S EA 10.00 Included
135 420kV, 63kA AIS EQUIPMENT 1000020419 336kV Surge Arrester (1-phase) EA 6.00 Included
136 420kV, 63kA AIS EQUIPMENT 1000004401 420 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 10.00 Included
137 420kV, 63kA AIS EQUIPMENT 1000004400 420 kV ,1 phase Bus Post Insulators for Line Traps EA 12.00 Included
138 420kV Erection Hardware 1000011318 Erection Hardware for 400kV I type layout-Bus Work (For one diameter)as per technical specification SET 2.00 Included
139 420kV Erection Hardware 1000011322 Erection Hardware for 400kV I type layout-Line bay as per technicalspecification SET 2.00 Included
140 420kV Erection Hardware 1000011326 Erection Hardware for 400kV I type layout-Spare bay of half dia as pertechnical specification SET 2.00 Included
141 420kV Insulator and Hardware 1000055984 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 12.00 Included
142 420kV Insulator and Hardware 1000055991 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 12.00 Included
143 420kV Insulator and Hardware 1000055985 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 6.00 Included
144 420kV Insulator and Hardware 1000055986 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 6.00 Included
145 Earthmat 1000032055 40 MM MS ROD FOR MAIN EARTHMAT KM 2.50 Included
146 420kV Control & Relay Panel 1000002146 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1.00 Included
147 420kV Control & Relay Panel 1000003398 400kV Line Protection Panel (with Automation) EA 2.00 Included
148 420kV Control & Relay Panel 1000055446 400KV CIRCUIT BREAKER RELAY PANEL (WITH AUTOMATION) EA 4.00 Included
149 SAS-Augmentation 1000003409 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 2.00 Included
150 SAS-Augmentation 1000003411 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 2.00 Included
151 Visual Monitoring System 1000030433 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1.00 Included
152 PLCC Equipment 1000004290 400kV,3150A,0.5mH ,63kA Line Trap EA 4.00 Included
153 PLCC Equipment 1000010014 Coupling device for PLCC SET 2.00 Included
154 PLCC Equipment 1000000046 Carrier Equipment Analog type (for Speech+Data & Speech+Protection) EA 2.00 Included
155 PLCC Equipment 1000017887 Analog Protection Coupler for PLCC EA 2.00 Included
156 PLCC Equipment 1000010638 Digital Protection Coupler EA 2.00 Included
157 PLCC Equipment 1000025769 Testing & Maintenance equipment (print test kit only) for PLCC SET 1.00 Included
158 PLCC Equipment 1000036908 HF CABLE 75 OHMS FOR PLCC KM 0.50 Included
159 Power & Control Cable 1000056265 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 2.50 Included
160 Power & Control Cable 1000056264 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 2.00 Included
161 Power & Control Cable 1000031887 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 4.00 Included
162 Power & Control Cable 1000031987 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 5.00 Included
163 Power & Control Cable 1000031964 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 3.00 Included
164 Power & Control Cable 1000031943 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 0.50 Included
165 Power & Control Cable 1000031985 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 4.00 Included
166 Power & Control Cable 1000031953 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 1.20 Included
167 Power & Control Cable 1000031957 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 1.00 Included
168 Air Conditioning & Ventilation System 1000006285 Air conditioning system for Switchyard Panel Room of 9m length SET 1.00 Included
169 Fire Fighting System 1000012019 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 1.00 Included
170 Fire Fighting System 1000012022 4.5 kg CO2 type Portable Fire extinguisher EA 1.00 Included
171 Illumination System 1000014547 Lighting Panel type ACP-2 as per technical specification EA 2.00 Included
172 Illumination System 1000038387 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 10.00 Included
173 Illumination System 1000038325 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 10.00 Included
174 Illumination System 1000013796 Illumination System for switchyard panel room of 9 m length LS 1.00 Included
175 420kV Equipment Support Structure 1000049656 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV WAVE TRAP (1PH) EA 4.00 Included
176 420kV Equipment Support Structure 1000049655 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 6.00 Included
177 420kV Equipment Support Structure 1000049654 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CVT (1PH) EA 6.00 Included
178 420kV Equipment Support Structure 1000049653 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 12.00 Included
179 420kV Equipment Support Structure 1000049652 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 10.00 Included
180 420kV Equipment Support Structure 1000049657 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 10.00 Included
181 Mandatory Spare LOT 1000019918 Spares for 420kV Circuit Breaker LS 1.00 Included
182 Mandatory Spare LOT 1000019919 Spares for 420kV Double break Isolator LS 1.00 Included
183 Mandatory Spare LOT 1000024186 SPARES FOR 336KV SURGE ARRESTER LS 1.00 Included
184 Mandatory Spare LOT 1000025943 Spare-420kV CVT 1 SET 1.00 Included
185 Mandatory Spare LOT 1000025940 Spare-420kV BPI SET 1.00 Included
186 Mandatory Spare LOT 1000025941 Spare-420kV CT 1 SET 1.00 Included
187 Mandatory Spare LOT 1000019912 Relay & protection Panels (with automation) LS 1.00 Included
188 Mandatory Spare LOT 1000019927 Spares-Substation Automation System LS 1.00 Included
189 Mandatory Spare LOT 1000025950 Spare-PLCC SET 1.00 Included
190 Mandatory Spare LOT 1000053851 SPARES FOR CLAMPS & CONNECTORS LOT 1.00 Included
191 BoQ of Comm Equip Supply at Kopal PS 1000031367 SDH EQUIPMENT (STM-16 MADM UPTO 5 MSP PROTECTED DIRECTIONS)-BASEEQUIPMENT (COMMON CARDS, CROSS CONNECT/CONTROL CARDS, OPTICAL BASECARDS, POWER SUPPLY CARDS, POWER CABLING, OTHER HARDWARE ANDACCESSORIES INCLUDING SUB RACKS, PATCH CORD, DDF ETC FULLY EQUIPEDEXCLUDING OPTICAL INTERFACE & TRIBUTARY CARDS EA 1.00 Included
192 BoQ of Comm Equip Supply at Kopal PS 1000018706 S16.1 SFP EA 4.00 Included
193 BoQ of Comm Equip Supply at Kopal PS 1000031413 OPTICAL INTERFACE/SFP-V16.2 EA 2.00 Included
194 BoQ of Comm Equip Supply at Kopal PS 1000031374 TRIBUTARY INTERFACE- E1 INTERFACE (MINIMUM 16 NOS.) SET 2.00 Included
195 BoQ of Comm Equip Supply at Kopal PS 1000034950 ETHERNET INTERFACE 10/100 BASE T WITH LAYER-2 SWITCHING (MIN 8INTERFACES PER CARD) EA 2.00 Included
196 BoQ of Comm Equip Supply at Kopal PS 1000031381 TRIBUTARY INTERFACE-GIGABIT ETHERNET INTERFACES 10/100 MBPS WITH LAYER-2 SWITCHING (MINIMUM 2 NOS.) SET 1.00 Included
197 BoQ of Comm Equip Supply at Kopal PS 1000026228 Equipment Cabinets For SDH EA 1.00 Included
198 BoQ of Comm Equip Supply at Kopal PS 1000034998 VOIP TELEPHONE INSTRUMENT WITH ONE COMMON SWITCH (MIN. 8 PORT) EA 2.00 Included
199 BoQ of Comm Equip Supply at Kopal PS 1000030942 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 1.00 Included
200 BoQ of Comm Equip Supply at Kopal PS 1000023471 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F EA 1.00 Included
201 BoQ of PMU for KOPPAL-Supply 1000017518 PMU with GPS Clock (clock can be either internal or external) EA 2.00 Included
202 BoQ of PMU for KOPPAL-Supply 1000022512 WAMS Hardware - Time System (GPS receiver) EA 2.00 Included
203 BoQ of PMU for KOPPAL-Supply 1000022510 WAMS Hardware - Substation Grade Layer-3 LAN Switches with minimum 4 x10/100 Mbps Ethernet ports and 2 x 1 Gbps Ethernet ports EA 3.00 Included
204 BoQ of PMU for KOPPAL-Supply 1000022487 WAMS Miscellaneous - Armored Fibre Optic Cable and associatedtermination (e.g. L2 Switch) for connecting PMU panels located indifferent control room of a station EA 1.00 Included
205 400 kV Gantry Structures - Supply 1000015954 Fabrication, galvanising and supply of Lattice Structures (MS Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 39.60 Included
206 400 kV Gantry Structures - Supply 1000015953 Fabrication, galvanising and supply of Lattice Structures (HT Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 40.60 Included
207 400 kV Gantry Structures - Supply 1000011713 Fabrication, galvanising and supply of fasteners ( nuts, bolts andwashers ) including step bolts for lattice and pipe structures to bedesigned during detailed engineering MT 3.60 Included
208 400 kV Gantry Structures - Supply 1000012373 Fabrication, galvanising and supply of foundation bolts including nuts,checknut and washers for lattice and pipe structures to be designedduring detailed engineering MT 3.60 Included
Total F&I Price 0.00
Total F&I Price 0.00
Date : -- Printed Name :
Place : Designation :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 3
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Sector-29, Multipackage lum-sum 0.00%
Gurgaon (Haryana) - 122001
Installation Charges : Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
All Prices are in Indian Rupees.
SI. No. Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '2’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Erection Charges Total Erection Charges Total GST as confirmed by Bidder Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
I Extn. of 400kV Gadag PS
1 420kV, 63kA AIS Equipment 100000267 998736 18 420kV, 3150A, 63kA Circuit Breaker(3-Phase) without closing resistor(with support structure) EA 8.00 Included 0.00 0 0.00
2 420kV, 63kA AIS Equipment 100000274 998736 18 420 kV, 3000A, 63KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 24.00 Included 0.00 0 0.00
3 420kV, 63kA AIS Equipment 100000275 998736 18 420 kV, 4400 pF Capacitive Voltage Transformer (1-Phase) EA 6.00 Included 0.00 0 0.00
4 420kV, 63kA AIS Equipment 100000287 998736 18 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S EA 29.00 Included 0.00 0 0.00
5 420kV, 63kA AIS Equipment 100000328 998736 18 336kV Surge Arrester (1-phase) EA 15.00 Included 0.00 0 0.00
6 420kV, 63kA AIS Equipment 100005443 998734 18 420KV, 1-PHASE BUS POST INSULATORS EA 21.00 Included 0.00 0 0.00
7 420kV, 63kA AIS Equipment 100000883 998734 18 420 kV ,1 phase Bus Post Insulators for Line Traps EA 12.00 Included 0.00 0 0.00
8 400 kV Erection Hardware 100000338 998731 18 Erection Hardware for 400kV I type layout-Bus Work (For one diameter) as per specification SET 3.00 Included 0.00 0 0.00
9 400 kV Erection Hardware 100000329 998731 18 Erection Hardware for 400kV I type layout-Line bay as per specification SET 2.00 Included 0.00 0 0.00
10 400 kV Erection Hardware 100000335 998731 18 Erection Hardware for 400kV I type layout-Spare bay of half dia as per specification SET 1.00 Included 0.00 0 0.00
11 400 kV Erection Hardware 100000330 998731 18 Erection Hardware for 400kV I type layout-Transformer bay as per specification SET 3.00 Included 0.00 0 0.00
12 400 kV Insulator and Hardware 100017133 998731 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 6.00 Included 0.00 0 0.00
13 400 kV Insulator and Hardware 100017128 998731 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH TURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 6.00 Included 0.00 0 0.00
14 400 kV Insulator and Hardware 100017126 998731 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 30.00 Included 0.00 0 0.00
15 400 kV Insulator and Hardware 100017127 998731 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 30.00 Included 0.00 0 0.00
16 400 kV Insulator and Hardware 100017131 998731 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 9.00 Included 0.00 0 0.00
17 Earthmat 100003103 998731 18 40 mm MS rod for Main Earthmat KM 3.00 Included 0.00 0 0.00
18 420kV Control & Relay Panel 100016779 998736 18 400kV Circuit Breaker Relay Panel (with Automation) EA 8.00 Included 0.00 0 0.00
19 420kV Control & Relay Panel 100000730 998736 18 400kV Line Protection Panel (with Automation) EA 2.00 Included 0.00 0 0.00
20 420kV Control & Relay Panel 100000735 998736 18 Augmentation of existing 400kV bus bar protection scheme.(No. of bays as per specification)-(with Automation) SET 1.00 Included 0.00 0 0.00
21 420kV Control & Relay Panel 100000731 998736 18 400kV Transformer Protection Panel (For both HV & MV side)-(with Automation) EA 3.00 Included 0.00 0 0.00
22 SAS-Augmentation 100002069 998736 18 Augmentation of Substation automation System for 400kV Main bay as per Technical Specification EA 5.00 Included 0.00 0 0.00
23 SAS-Augmentation 100002075 998736 18 Augmentation of Substation automation System for 400kV Tie bay as per Technical Specification EA 3.00 Included 0.00 0 0.00
24 SAS-Augmentation 100002070 998736 18 Augmentation of Substation automation System for 220kV bay as per Technical Specification EA 7.00 Included 0.00 0 0.00
25 Visual Monitoring System 100002500 998731 18 Color IP camera, with PAN, TILT and ZOOM facilities, alongwith all required Items, Accessories, Line Interface units, Fiber patchcords, Power supply units, Junction Boxes, Cables, Fiber Optic Cables, etc., and including Integration in existing Hardware andSoftware for Augmentation of Visual Monitoring System as per technical specification. SET 1.00 Included 0.00 0 0.00
26 PLCC 100003517 998734 18 HF CABLE FOR PLCC-75 OHM (KM) KM 0.50 Included 0.00 0 0.00
27 PLCC 100000891 998734 18 Digital Protection Coupler EA 2.00 Included 0.00 0 0.00
28 PLCC 100000890 998734 18 Protection Coupler (Analog) EA 2.00 Included 0.00 0 0.00
29 PLCC 100000888 998734 18 Carrier Equipment Analog type (for Speech+Data & Speech+Protection) EA 2.00 Included 0.00 0 0.00
30 PLCC 100000886 998734 18 Coupling device for PLCC EA 2.00 Included 0.00 0 0.00
31 PLCC 100002042 998734 18 400kV,3150A,0.5mH ,63kA Line Trap EA 4.00 Included 0.00 0 0.00
32 Power and Control Cable 100002181 998736 18 1.1kV grade Power Cables (PVCinsulated)along withlugs,glands,straight joints &accessories,etc. LS 1.00 Included 0.00 0 0.00
33 Power and Control Cable 100002182 998736 18 1.1kV grade Control Cables (PVCinsulated) along withlugs,glands,straight joints &accessories,etc. LS 1.00 Included 0.00 0 0.00
34 Air Conditioning & Ventilation System 100001881 995463 18 Air conditioning system for Switchyard Panel Room of 9m length SET 1.00 Included 0.00 0 0.00
35 Air Conditioning & Ventilation System 100001882 995463 18 Air conditioning system for Switchyard Panel Room of 6m length SET 3.00 Included 0.00 0 0.00
36 Fire Fighting System 100001871 995461 18 Fire Detection and Alarm System for Switchyard Panel Room of 9 m length SET 1.00 Included 0.00 0 0.00
37 Fire Fighting System 100000975 995461 18 4.5 kg CO2 type Portable Fire extinguisher EA 4.00 Included 0.00 0 0.00
38 Fire Fighting System 100002062 995461 18 Fire Detection and Alarm System for Switchyard Panel Room of 6 m length SET 3.00 Included 0.00 0 0.00
39 Fire Fighting System 100016783 998736 18 HVW spray system, Hydrant system and complete U/G & O/G piping and accessories etc. out side the pump house for 400kV, 3-phaseAutotransformer SET 3.00 Included 0.00 0 0.00
40 Illumination System 100001021 995461 18 Lighting Panel type ACP-2 as per technical specification EA 2.00 Included 0.00 0 0.00
41 Illumination System 100004852 998731 18 Lighting Fixture LED Luminaires type FL-1 as per tech. specifications EA 15.00 Included 0.00 0 0.00
42 Illumination System 100004926 998731 18 Lighting Fixture LED Luminaires type FL2 as per tech. specifications EA 15.00 Included 0.00 0 0.00
43 Illumination System 100001115 998739 18 Illumination System for switchyard panel room of 9 m length SET 1.00 Included 0.00 0 0.00
44 Illumination System 100001116 998739 18 Illumination System for switchyard panel room of 6 m length SET 3.00 Included 0.00 0 0.00
45 400kV Equipment Support Structures 100008221 995455 18 Equipment Structure including Foundation bolt-400kV Isolator (3Ph) EA 29.00 Included 0.00 0 0.00
46 400kV Equipment Support Structures 100008223 995455 18 Equipment Structure including Foundation bolt-400kV BPI (1Ph) EA 21.00 Included 0.00 0 0.00
47 400kV Equipment Support Structures 100008219 995455 18 Equipment Structure including Foundation bolt-400kV CT (1Ph) EA 24.00 Included 0.00 0 0.00
48 400kV Equipment Support Structures 100008220 995455 18 Equipment Structure including Foundation bolt-400kV CVT (1Ph) EA 6.00 Included 0.00 0 0.00
49 400kV Equipment Support Structures 100008222 995455 18 Equipment Structure including Foundation bolt-400kV class SA (1Ph) EA 15.00 Included 0.00 0 0.00
50 400kV Equipment Support Structures 100008224 995455 18 Equipment Structure including Foundation bolt-400kV Wave Trap (1Ph) EA 4.00 Included 0.00 0 0.00
51 245kV, 50kA AIS Equipment 100003634 998736 18 245 kV 1600A, 50KA Circuit Breakers (3-Phase) with support EA 7.00 Included 0.00 0 0.00
52 245kV, 50kA AIS Equipment 100002016 998736 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Tandem Isolator without E/S EA 14.00 Included 0.00 0 0.00
53 245kV, 50kA AIS Equipment 100002014 998736 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S EA 7.00 Included 0.00 0 0.00
54 245kV, 50kA AIS Equipment 100002013 998736 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S EA 7.00 Included 0.00 0 0.00
55 245kV, 50kA AIS Equipment 100001989 998736 18 245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 21.00 Included 0.00 0 0.00
56 245kV, 50kA AIS Equipment 100000448 998736 18 245 kV, 4400pf Capacitive Voltage Transformer (1- Phase) EA 12.00 Included 0.00 0 0.00
57 245kV, 50kA AIS Equipment 100000484 998736 18 216kV Surge Arrester (1-phase) EA 21.00 Included 0.00 0 0.00
58 245kV, 50kA AIS Equipment 100001907 998736 18 245 kV,1 phase Bus Post Insulator (except for Line Traps) EA 103.00 Included 0.00 0 0.00
59 245kV Erection Hardware 100000485 998731 18 Erection Hardware for 220kV layout (Double Main and Transfer Scheme as per SLD)-Line Bay as per specification SET 4.00 Included 0.00 0 0.00
60 245kV Erection Hardware 100000486 998731 18 Erection Hardware for 220kV layout (Double Main and Transfer Scheme as per SLD)-Transformer Bay as per specification SET 3.00 Included 0.00 0 0.00
61 245kV Erection Hardware 100000489 998731 18 Erection Hardware for 220kV layout (Double Main and Transfer Scheme as per SLD)-Bus work (one Bay) as per specification SET 7.00 Included 0.00 0 0.00
62 245kV Insulator and Hardware 100017123 998731 18 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 18.00 Included 0.00 0 0.00
63 245kV Insulator and Hardware 100017122 998731 18 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 12.00 Included 0.00 0 0.00
64 245kV Insulator and Hardware 100017116 998731 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 45.00 Included 0.00 0 0.00
65 245kV Insulator and Hardware 100017115 998731 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 45.00 Included 0.00 0 0.00
66 245kV Insulator and Hardware 100017117 998731 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH TURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 12.00 Included 0.00 0 0.00
67 245kV Control & Relay Panel 100016778 998736 18 220kV Circuit Breaker Relay Panel (with Automation) EA 7.00 Included 0.00 0 0.00
68 245kV Control & Relay Panel 100000741 998736 18 220kV Bus Bar Protection Panel (Single)-(with Automation) SET 1.00 Included 0.00 0 0.00
69 245kV Control & Relay Panel 100000738 998736 18 220kV Line Protection Panel (with Automation) EA 4.00 Included 0.00 0 0.00
70 245kV Equipment Support Structure 100008225 995455 18 Equipment Structure including Foundation bolt-220kV CT (1Ph) EA 21.00 Included 0.00 0 0.00
71 245kV Equipment Support Structure 100008226 995455 18 Equipment Structure including Foundation bolt-220kV CVT (1Ph) EA 12.00 Included 0.00 0 0.00
72 245kV Equipment Support Structure 100008227 995455 18 Equipment Structure including Foundation bolt-220kV Isolator (3Ph) EA 28.00 Included 0.00 0 0.00
73 245kV Equipment Support Structure 100008228 995455 18 Equipment Structure including Foundation bolt-220kV class SA (1Ph) EA 21.00 Included 0.00 0 0.00
74 245kV Equipment Support Structure 100008229 995455 18 Equipment Structure including Foundation bolt-220kV Wave Trap (1Ph) EA 8.00 Included 0.00 0 0.00
75 245kV Equipment Support Structure 100008230 995455 18 Equipment Structure including Foundation bolt-220kV BPI (1Ph) EA 58.00 Included 0.00 0 0.00
76 245kV Equipment Support Structure 100008640 995455 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH) (BUS HEIGHT-8M APPROX.) SET 21.00 Included 0.00 0 0.00
77 Civil Works 100004518 995433 18 Excavation in all kind of soil including rock for all leads and lifts, backfilling, disposal of surplus earth within a lead up to2Km as per technical specification. The surplus earth shall be roughly graded . M3 15690.00 Included 0.00 0 0.00
78 Civil Works 100001325 995454 18 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) M3 528.00 Included 0.00 0 0.00
79 Civil Works 100001326 995454 18 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) M3 43.00 Included 0.00 0 0.00
80 Civil Works 100001328 995454 18 Providing and laying Plain Cement Concrete 1:5:10 (1 cement : 5 sand : 10 brick aggregate) M3 1775.00 Included 0.00 0 0.00
81 Civil Works 100001327 995454 18 Providing and laying of Reinforced Cement Concrete M25 mix including pre cast, shuttering, Grouting of pockets & underpinning butexcluding steel reinforcement M3 3315.00 Included 0.00 0 0.00
82 Civil Works 100001329 995454 18 Steel Reinforcement MT 201.00 Included 0.00 0 0.00
83 Civil Works 100001331 995455 18 Misc. Structural steel including rails, embedments, edge protection angles, gratings etc. but excluding the reinforcement steel andsteel for lattice and pipe structures. MT 39.00 Included 0.00 0 0.00
84 Civil Works 100001714 995428 18 Stone spreading in switchyard excluding PCC M2 23200.00 Included 0.00 0 0.00
85 Civil Works 100001713 995424 18 Antiweed treatment M2 23200.00 Included 0.00 0 0.00
86 Civil Works 100008110 995421 18 3.75m wide Bitumen road with earthen shoulder including 100 mm dia RCC Hume Pipe @ 100 metre interval as per drawing and TS (as perDSR item no 16.35 and 16.30.1) and including 225 mm thick WBM in three equal layers of 75 mm each as per CPWD specification. M2 1500.00 Included 0.00 0 0.00
87 Civil Works 100008611 995477 18 Swtichyard fencing: Providing and fixing fencing of GI barbed wire consisting of galvanized MS tubular posts at 3 m intervals; GIbarded wire shall run horizontally from post to post at a spacing of 300 mm (vertically) and a cross formation in each panel,complete as per technical specification and drawing. M 150.00 Included 0.00 0 0.00
88 Civil Works 100001542 995429 18 Dismantling & Re-erection of Existing fence M 350.00 Included 0.00 0 0.00
89 Civil Works 100007701 995462 18 Supplying and erecting dewatering pumps- 2 HP EA 4.00 Included 0.00 0 0.00
90 Civil Works 100001478 995454 18 Cable Trench including all types of crossings, all metallic works and sump pit including concrte and reinforcement steel Section 2-2 M 200.00 Included 0.00 0 0.00
91 Civil Works 100001479 995454 18 Cable Trench including all types of crossings, all metallic works and sump pit including concrte and reinforcement steel Section 3-3 M 150.00 Included 0.00 0 0.00
92 Civil Works 100001480 995454 18 Cable Trench including all types of crossings, all metallic works and sump pit including concrte and reinforcement steel Section 4-4 M 150.00 Included 0.00 0 0.00
93 Civil Works 100016667 995451 18 Cable Trench including all types of crossings, all metallic works and sump pit including concrete and reinforcement steel Section2A-2A M 75.00 Included 0.00 0 0.00
94 Civil Works 100001761 995462 18 Drains section A-A including culverts but excluding concrete & reinforcement steel M 300.00 Included 0.00 0 0.00
95 Civil Works 100001762 995462 18 Drains Section B-B including culverts but excluding concrete & reinforcement steel M 300.00 Included 0.00 0 0.00
96 Civil Works 100001763 995462 18 Drains Section C-C including culverts but excluding concrete & reinforcement steel M 100.00 Included 0.00 0 0.00
97 Civil Works 100001764 995462 18 Drains Section D-D including culverts but excluding concrete & reinforcement steel M 100.00 Included 0.00 0 0.00
98 Civil Works 100002911 995432 18 Earthwork in excavation & filling in all types of soil and soft/disintegrated rock in open areas/nallas/channels, to the requiredslopes, shapes, levels, elevations and profile, including trimming of bottom and slopes of excavation, bailing out rain(dewatering), pumping, removal of slush, preparing embankments/marginal banks, loosening, dressing, spreading material in layers notexceeding 200mm, as per direction of Engineer-in-Charge, water flooding, compacting to achieve 95% consolidation at optimum moisturecontent, finishing etc. all complete, for all leads and lifts within leveling boundary, including disposal of surplus earth andstacking of unsuitable material within a lead of 2.0 Km beyond substation boundary, with all labour, material, tools, tackles andequipment, safeguards and incidentals, Royalty,taxes etc. as necessary, as per drawings, specification and directions of theEngineer-in-Charge. Clearing of jungle is included in this item. (Only excavation/cutting will be measured for payment purpose.) M3 2900.00 Included 0.00 0 0.00
99 Civil Works 100002583 995432 18 Supply of earth (excluding rock & boulders) at site including royalty, carriage and filling in specified areas in layers notexceeding 200mm in depth, compacting under optimum moisture condition to achieve 95% of Proctor density, finishing etc. allcomplete, for all leads & lifts, with all labour, material, tools, tackles, equipments, safeguards & incidentals as necessary as perdrawings, specification and direction of the Engineer- in- Charge. M3 26100.00 Included 0.00 0 0.00
100 Civil Works 100001720 995428 18 Supplying, filling and compacting CNS material as per specification under floors, foundations, roads, cable trenches, drains etc inlayers not exceeding 200 mm thickness M3 2112.00 Included 0.00 0 0.00
101 Civil Works 100001721 995428 18 Supplying, filling and compacting stone boulders mixed with sand under foundations, roads, cable trenches, drains etc in layers notexceeding 250mm thickness including ramming, watering compacting M3 500.00 Included 0.00 0 0.00
102 Civil Works 100001210 995455 18 Erection of Lattice Structures (MS Steel), to be designed during detailed engineering, for towers, beams and equipment supportstructure including pack plates / packwashers and gusset plates excluding fasteners and foundation bolts MT 135.00 Included 0.00 0 0.00
103 Civil Works 100001209 995455 18 Erection of Lattice Structures (HT Steel), to be designed during detailed engineering, for towers, beams and equipment supportstructure including pack plates / packwashers and gusset plates excluding fasteners and foundation bolts. MT 129.00 Included 0.00 0 0.00
104 Civil Works 100001680 995455 18 Erection of fasteners ( nuts, bolts and washers ) including step bolts for lattice and pipe structures to be designed duringdetailed engineering MT 14.00 Included 0.00 0 0.00
105 Civil Works 100001681 995455 18 Erection of foundation bolts including nuts, checknut and washers for lattice and pipe structures to be designed during detailedengineering MT 14.00 Included 0.00 0 0.00
106 Civil Works 100001433 995435 18 Soil Investigation: As per technical specification including all laboratory and field tests, report and recommendations. LOT 1.00 Included 0.00 0 0.00
107 Civil Works 100003437 995454 18 Switchyard Panel Room - Civil Works. All civil works as per drawing and specifications complete, including - brickwork, finishing(external and internal), windows etc. However, excavation, PCC, RCC and reinforcement shall be paid separately as per BPS. M2 122.00 Included 0.00 0 0.00
108 Civil Works 100001330 995428 18 Stone filling (40 mm size) for transformer/Reactor foundation M3 56.00 Included 0.00 0 0.00
109 Civil Works 100002580 995421 18 Construction of rail cum road as per drawing including all item such as excavation,compactions, rolling watering, WBM etc. butexcluding concrete reinforcement and structural steel-Section having four rails M2 295.00 Included 0.00 0 0.00
110 Civil Works 100003114 995454 18 External finishing / painting of fire wall (water proofing cement paint) (DSR 13.44.1) M2 600.00 Included 0.00 0 0.00
111 Civil Works 100001735 995462 18 RCC culverts and cable trench crossings including supplying and laying hume pipe 250mm dia of grade (NP-3) excluding concrete as perspecification. M 10.00 Included 0.00 0 0.00
112 Civil Works 100001736 995462 18 RCC culverts and cable trench crossings including supplying and laying hume pipe 300mm dia of grade (NP-3) excluding concrete as perspecification. M 10.00 Included 0.00 0 0.00
113 Civil Works 100001737 995462 18 RCC culverts and cable trench crossings including supplying and laying hume pipe 450mm dia of grade (NP-3) excluding concrete as perspecification. M 10.00 Included 0.00 0 0.00
114 Civil Works 100001405 995462 18 Supplying & laying hume pipe of grade (NP-3) excluding reinforcement and concrete as per drawing-250mm dia M 10.00 Included 0.00 0 0.00
115 Civil Works 100001404 995462 18 Supplying & laying hume pipe of grade (NP-3) excluding reinforcement and concrete as per drawing-100mm dia M 10.00 Included 0.00 0 0.00
116 Install of Comm Equip at GADAG PS 100002812 998734 18 SDH Equipment (STM-16 MADM upto 5 MSP protected directions)-Base Equipment (Common cards, Cross Connect/control cards, optical basecards, power supply cards, power cabling, other hardware and accessories including sub racks, patch cord, DDF etc fully equipedexcluding optical interface & Tributary cards EA 2.00 Included 0.00 0 0.00
117 Install of Comm Equip at GADAG PS 170000433 998734 18 Optical Interface Cards/SFP# -S16.1 for SDH Equipment-STM-16 EA 8.00 Included 0.00 0 0.00
118 Install of Comm Equip at GADAG PS 100002813 998734 18 Optical Interface/SFP-V16.2 EA 2.00 Included 0.00 0 0.00
119 Install of Comm Equip at GADAG PS 100002825 998734 18 Tributary interface- E1 interface (Minimum 16 nos.) SET 4.00 Included 0.00 0 0.00
120 Install of Comm Equip at GADAG PS 170000550 998336 18 Ethernet Interface 10/100 Base T with Layer-2 switching (Min 8 Interfaces per card) EA 4.00 Included 0.00 0 0.00
121 Install of Comm Equip at GADAG PS 100002829 998734 18 Tributary interface-Gigabit Ethernet Interfaces 10/100 Mbps with Layer -2 Switching (minimum 2 nos.) SET 2.00 Included 0.00 0 0.00
122 Install of Comm Equip at GADAG PS 170000375 998734 18 Equipment Cabinets-For SDH Equipments EA 2.00 Included 0.00 0 0.00
123 Install of Comm Equip at GADAG PS 170000376 998734 18 NMS-Craft Terminal-Hardware EA 1.00 Included 0.00 0 0.00
124 Install of Comm Equip at GADAG PS 170000377 998734 18 NMS-Craft Terminal-Software EA 1.00 Included 0.00 0 0.00
125 Install of Comm Equip at GADAG PS 170000551 998336 18 VOIP telephone instrument with one common switch (min. 8 port) EA 4.00 Included 0.00 0 0.00
126 Install of Comm Equip at GADAG PS 100002882 998336 18 Fibre Optic Approach cabling: Including installation hardware like ties/clips/cleats, conduits, ducts, supports, fittings,accessories etc.: 24 Fibre KM 2.50 Included 0.00 0 0.00
127 Install of Comm Equip at GADAG PS 170000356 998336 18 Fibre Optic Distribution Panel (FODP): Indoor Type: FC Coupling and mounted on ETSI 19" rack or slimline rack: Type 2 (96 Fibre) EA 2.00 Included 0.00 0 0.00
128 Install of Comm Equip at GADAG PS 170000435 998734 18 Optical Interface Cards/SFP# -L16.2 for SDH Equipment-STM-16 EA 8.00 Included 0.00 0 0.00
129 BoQ of PMU for GADAG-Service 170000502 998713 18 Service:- Phasor Measurement Unit (PMU) EA 2.00 Included 0.00 0 0.00
130 BoQ of PMU for GADAG-Service 170000530 998734 18 WAMS TIME SYSTEM(GPS RECEIVER) EA 2.00 Included 0.00 0 0.00
131 BoQ of PMU for GADAG-Service 170000503 998713 18 Installation of Substation Grade Layer-3 LAN Switches as per Technical Specification EA 3.00 Included 0.00 0 0.00
132 BoQ of PMU for GADAG-Service 170000504 998713 18 Services:- Armored Fibre Optic Cable and associated termination equipment LOT 1.00 Included 0.00 0 0.00
133 BoQ of PMU for GADAG-Service 170000501 998734 18 Integration of PMU with the PDC (Phasor Data Concentrator) of RLDCs and respective SLDCs as required. LOT 1.00 Included 0.00 0 0.00
II Extn. of 400kV Koppal PS
143 420kV, 63kA AIS EQUIPMENT 100000267 998736 18 420kV, 3150A, 63kA Circuit Breaker(3-Phase) without closing resistor(with support structure) EA 4.00 Included 0.00 0 0.00
144 420kV, 63kA AIS EQUIPMENT 100000274 998736 18 420 kV, 3000A, 63KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 12.00 Included 0.00 0 0.00
145 420kV, 63kA AIS EQUIPMENT 100000275 998736 18 420 kV, 4400 pF Capacitive Voltage Transformer (1-Phase) EA 6.00 Included 0.00 0 0.00
146 420kV, 63kA AIS EQUIPMENT 100000287 998736 18 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S EA 10.00 Included 0.00 0 0.00
147 420kV, 63kA AIS EQUIPMENT 100000328 998736 18 336kV Surge Arrester (1-phase) EA 6.00 Included 0.00 0 0.00
148 420kV, 63kA AIS EQUIPMENT 100005443 998734 18 420KV, 1-PHASE BUS POST INSULATORS EA 10.00 Included 0.00 0 0.00
149 420kV, 63kA AIS EQUIPMENT 100000883 998734 18 420 kV ,1 phase Bus Post Insulators for Line Traps EA 12.00 Included 0.00 0 0.00
150 420kV Erection Hardware 100000338 998731 18 Erection Hardware for 400kV I type layout-Bus Work (For one diameter) as per specification SET 2.00 Included 0.00 0 0.00
151 420kV Erection Hardware 100000329 998731 18 Erection Hardware for 400kV I type layout-Line bay as per specification SET 2.00 Included 0.00 0 0.00
152 420kV Erection Hardware 100000335 998731 18 Erection Hardware for 400kV I type layout-Spare bay of half dia as per specification SET 2.00 Included 0.00 0 0.00
153 420kV Insulator and Hardware 100017133 998731 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 6.00 Included 0.00 0 0.00
154 420kV Insulator and Hardware 100017128 998731 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH TURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 6.00 Included 0.00 0 0.00
155 420kV Insulator and Hardware 100017126 998731 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 12.00 Included 0.00 0 0.00
156 420kV Insulator and Hardware 100017127 998731 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 12.00 Included 0.00 0 0.00
157 Earthmat 100003103 998731 18 40 mm MS rod for Main Earthmat KM 2.50 Included 0.00 0 0.00
158 420kV Control & Relay Panel 100016779 998736 18 400kV Circuit Breaker Relay Panel (with Automation) EA 4.00 Included 0.00 0 0.00
159 420kV Control & Relay Panel 100000730 998736 18 400kV Line Protection Panel (with Automation) EA 2.00 Included 0.00 0 0.00
160 420kV Control & Relay Panel 100000735 998736 18 Augmentation of existing 400kV bus bar protection scheme.(No. of bays as per specification)-(with Automation) SET 1.00 Included 0.00 0 0.00
161 SAS-Augmentation 100002069 998736 18 Augmentation of Substation automation System for 400kV Main bay as per Technical Specification EA 2.00 Included 0.00 0 0.00
162 SAS-Augmentation 100002075 998736 18 Augmentation of Substation automation System for 400kV Tie bay as per Technical Specification EA 2.00 Included 0.00 0 0.00
163 Visual Monitoring System 100002500 998731 18 Color IP camera, with PAN, TILT and ZOOM facilities, alongwith all required Items, Accessories, Line Interface units, Fiber patchcords, Power supply units, Junction Boxes, Cables, Fiber Optic Cables, etc., and including Integration in existing Hardware andSoftware for Augmentation of Visual Monitoring System as per technical specification. SET 1.00 Included 0.00 0 0.00
164 PLCC Equipment 100003517 998734 18 HF CABLE FOR PLCC-75 OHM (KM) KM 0.50 Included 0.00 0 0.00
165 PLCC Equipment 100000891 998734 18 Digital Protection Coupler EA 2.00 Included 0.00 0 0.00
166 PLCC Equipment 100000890 998734 18 Protection Coupler (Analog) EA 2.00 Included 0.00 0 0.00
167 PLCC Equipment 100000888 998734 18 Carrier Equipment Analog type (for Speech+Data & Speech+Protection) EA 2.00 Included 0.00 0 0.00
168 PLCC Equipment 100000886 998734 18 Coupling device for PLCC EA 2.00 Included 0.00 0 0.00
169 PLCC Equipment 100002042 998734 18 400kV,3150A,0.5mH ,63kA Line Trap EA 4.00 Included 0.00 0 0.00
170 Power & Control Cable 100002181 998736 18 1.1kV grade Power Cables (PVCinsulated)along withlugs,glands,straight joints &accessories,etc. LS 1.00 Included 0.00 0 0.00
171 Power & Control Cable 100002182 998736 18 1.1kV grade Control Cables (PVCinsulated) along withlugs,glands,straight joints &accessories,etc. LS 1.00 Included 0.00 0 0.00
172 Air Conditioning & Ventilation System 100001881 995463 18 Air conditioning system for Switchyard Panel Room of 9m length SET 1.00 Included 0.00 0 0.00
173 Fire Fighting System 100001871 995461 18 Fire Detection and Alarm System for Switchyard Panel Room of 9 m length SET 1.00 Included 0.00 0 0.00
174 Fire Fighting System 100000975 995461 18 4.5 kg CO2 type Portable Fire extinguisher EA 1.00 Included 0.00 0 0.00
175 Illumination System 100001021 995461 18 Lighting Panel type ACP-2 as per technical specification EA 2.00 Included 0.00 0 0.00
176 Illumination System 100004852 998731 18 Lighting Fixture LED Luminaires type FL-1 as per tech. specifications EA 10.00 Included 0.00 0 0.00
177 Illumination System 100004926 998731 18 Lighting Fixture LED Luminaires type FL2 as per tech. specifications EA 10.00 Included 0.00 0 0.00
178 Illumination System 100001115 998739 18 Illumination System for switchyard panel room of 9 m length SET 1.00 Included 0.00 0 0.00
179 400kV Equipment Support Structures 100008221 995455 18 Equipment Structure including Foundation bolt-400kV Isolator (3Ph) EA 10.00 Included 0.00 0 0.00
180 400kV Equipment Support Structures 100008223 995455 18 Equipment Structure including Foundation bolt-400kV BPI (1Ph) EA 10.00 Included 0.00 0 0.00
181 400kV Equipment Support Structures 100008219 995455 18 Equipment Structure including Foundation bolt-400kV CT (1Ph) EA 12.00 Included 0.00 0 0.00
182 400kV Equipment Support Structures 100008220 995455 18 Equipment Structure including Foundation bolt-400kV CVT (1Ph) EA 6.00 Included 0.00 0 0.00
183 400kV Equipment Support Structures 100008222 995455 18 Equipment Structure including Foundation bolt-400kV class SA (1Ph) EA 6.00 Included 0.00 0 0.00
184 400kV Equipment Support Structures 100008224 995455 18 Equipment Structure including Foundation bolt-400kV Wave Trap (1Ph) EA 4.00 Included 0.00 0 0.00
185 Install of Comm Equip at KOPAL PS 100002812 998734 18 SDH Equipment (STM-16 MADM upto 5 MSP protected directions)-Base Equipment (Common cards, Cross Connect/control cards, optical basecards, power supply cards, power cabling, other hardware and accessories including sub racks, patch cord, DDF etc fully equipedexcluding optical interface & Tributary cards EA 1.00 Included 0.00 0 0.00
186 Install of Comm Equip at KOPAL PS 170000433 998734 18 Optical Interface Cards/SFP# -S16.1 for SDH Equipment-STM-16 EA 4.00 Included 0.00 0 0.00
187 Install of Comm Equip at KOPAL PS 100002813 998734 18 Optical Interface/SFP-V16.2 EA 2.00 Included 0.00 0 0.00
188 Install of Comm Equip at KOPAL PS 100002825 998734 18 Tributary interface- E1 interface (Minimum 16 nos.) SET 2.00 Included 0.00 0 0.00
189 Install of Comm Equip at KOPAL PS 170000550 998336 18 Ethernet Interface 10/100 Base T with Layer-2 switching (Min 8 Interfaces per card) EA 2.00 Included 0.00 0 0.00
190 Install of Comm Equip at KOPAL PS 100002829 998734 18 Tributary interface-Gigabit Ethernet Interfaces 10/100 Mbps with Layer -2 Switching (minimum 2 nos.) SET 1.00 Included 0.00 0 0.00
191 Install of Comm Equip at KOPAL PS 170000375 998734 18 Equipment Cabinets-For SDH Equipments EA 1.00 Included 0.00 0 0.00
192 Install of Comm Equip at KOPAL PS 170000551 998336 18 VOIP telephone instrument with one common switch (min. 8 port) EA 2.00 Included 0.00 0 0.00
193 Install of Comm Equip at KOPAL PS 100002882 998336 18 Fibre Optic Approach cabling: Including installation hardware like ties/clips/cleats, conduits, ducts, supports, fittings,accessories etc.: 24 Fibre KM 1.00 Included 0.00 0 0.00
194 Install of Comm Equip at KOPAL PS 170000356 998336 18 Fibre Optic Distribution Panel (FODP): Indoor Type: FC Coupling and mounted on ETSI 19" rack or slimline rack: Type 2 (96 Fibre) EA 1.00 Included 0.00 0 0.00
195 BoQ of PMU for KOPPAL-Service 170000502 998713 18 Service:- Phasor Measurement Unit (PMU) EA 2.00 Included 0.00 0 0.00
196 BoQ of PMU for KOPPAL-Service 170000530 998734 18 WAMS TIME SYSTEM(GPS RECEIVER) EA 2.00 Included 0.00 0 0.00
197 BoQ of PMU for KOPPAL-Service 170000503 998713 18 Installation of Substation Grade Layer-3 LAN Switches as per Technical Specification EA 3.00 Included 0.00 0 0.00
198 BoQ of PMU for KOPPAL-Service 170000504 998713 18 Services:- Armored Fibre Optic Cable and associated termination equipment LOT 1.00 Included 0.00 0 0.00
199 BoQ of PMU for KOPPAL-Service 170000501 998734 18 Integration of PMU with the PDC (Phasor Data Concentrator) of RLDCs and respective SLDCs as required. LOT 1.00 Included 0.00 0 0.00
200 Civil Works 100004518 995433 18 Excavation in all kind of soil including rock for all leads and lifts, backfilling, disposal of surplus earth within a lead up to2Km as per technical specification. The surplus earth shall be roughly graded . M3 3251.00 Included 0.00 0 0.00
201 Civil Works 100001325 995454 18 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) M3 87.00 Included 0.00 0 0.00
202 Civil Works 100001326 995454 18 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) M3 25.00 Included 0.00 0 0.00
203 Civil Works 100001328 995454 18 Providing and laying Plain Cement Concrete 1:5:10 (1 cement : 5 sand : 10 brick aggregate) M3 704.00 Included 0.00 0 0.00
204 Civil Works 100001327 995454 18 Providing and laying of Reinforced Cement Concrete M25 mix including pre cast, shuttering, Grouting of pockets & underpinning butexcluding steel reinforcement M3 537.00 Included 0.00 0 0.00
205 Civil Works 100001329 995454 18 Steel Reinforcement MT 44.00 Included 0.00 0 0.00
206 Civil Works 100001331 995455 18 Misc. Structural steel including rails, embedments, edge protection angles, gratings etc. but excluding the reinforcement steel andsteel for lattice and pipe structures. MT 2.00 Included 0.00 0 0.00
207 Civil Works 100001714 995428 18 Stone spreading in switchyard excluding PCC M2 9200.00 Included 0.00 0 0.00
208 Civil Works 100001713 995424 18 Antiweed treatment M2 9200.00 Included 0.00 0 0.00
209 Civil Works 100008110 995421 18 3.75m wide Bitumen road with earthen shoulder including 100 mm dia RCC Hume Pipe @ 100 metre interval as per drawing and TS (as perDSR item no 16.35 and 16.30.1) and including 225 mm thick WBM in three equal layers of 75 mm each as per CPWD specification. M2 750.00 Included 0.00 0 0.00
210 Civil Works 100008611 995477 18 Swtichyard fencing: Providing and fixing fencing of GI barbed wire consisting of galvanized MS tubular posts at 3 m intervals; GIbarded wire shall run horizontally from post to post at a spacing of 300 mm (vertically) and a cross formation in each panel,complete as per technical specification and drawing. M 100.00 Included 0.00 0 0.00
211 Civil Works 100001542 995429 18 Dismantling & Re-erection of Existing fence M 250.00 Included 0.00 0 0.00
212 Civil Works 100007701 995462 18 Supplying and erecting dewatering pumps- 2 HP EA 1.00 Included 0.00 0 0.00
213 Civil Works 100001478 995454 18 Cable Trench including all types of crossings, all metallic works and sump pit including concrte and reinforcement steel Section 2-2 M 150.00 Included 0.00 0 0.00
214 Civil Works 100001479 995454 18 Cable Trench including all types of crossings, all metallic works and sump pit including concrte and reinforcement steel Section 3-3 M 100.00 Included 0.00 0 0.00
215 Civil Works 100001480 995454 18 Cable Trench including all types of crossings, all metallic works and sump pit including concrte and reinforcement steel Section 4-4 M 100.00 Included 0.00 0 0.00
216 Civil Works 100016667 995451 18 Cable Trench including all types of crossings, all metallic works and sump pit including concrete and reinforcement steel Section2A-2A M 50.00 Included 0.00 0 0.00
217 Civil Works 100001761 995462 18 Drains section A-A including culverts but excluding concrete & reinforcement steel M 200.00 Included 0.00 0 0.00
218 Civil Works 100001762 995462 18 Drains Section B-B including culverts but excluding concrete & reinforcement steel M 100.00 Included 0.00 0 0.00
219 Civil Works 100001763 995462 18 Drains Section C-C including culverts but excluding concrete & reinforcement steel M 60.00 Included 0.00 0 0.00
220 Civil Works 100001764 995462 18 Drains Section D-D including culverts but excluding concrete & reinforcement steel M 40.00 Included 0.00 0 0.00
221 Civil Works 100002911 995432 18 Earthwork in excavation & filling in all types of soil and soft/disintegrated rock in open areas/nallas/channels, to the requiredslopes, shapes, levels, elevations and profile, including trimming of bottom and slopes of excavation, bailing out rain(dewatering), pumping, removal of slush, preparing embankments/marginal banks, loosening, dressing, spreading material in layers notexceeding 200mm, as per direction of Engineer-in-Charge, water flooding, compacting to achieve 95% consolidation at optimum moisturecontent, finishing etc. all complete, for all leads and lifts within leveling boundary, including disposal of surplus earth andstacking of unsuitable material within a lead of 2.0 Km beyond substation boundary, with all labour, material, tools, tackles andequipment, safeguards and incidentals, Royalty,taxes etc. as necessary, as per drawings, specification and directions of theEngineer-in-Charge. Clearing of jungle is included in this item. (Only excavation/cutting will be measured for payment purpose.) M3 575.00 Included 0.00 0 0.00
222 Civil Works 100002583 995432 18 Supply of earth (excluding rock & boulders) at site including royalty, carriage and filling in specified areas in layers notexceeding 200mm in depth, compacting under optimum moisture condition to achieve 95% of Proctor density, finishing etc. allcomplete, for all leads & lifts, with all labour, material, tools, tackles, equipments, safeguards & incidentals as necessary as perdrawings, specification and direction of the Engineer- in- Charge. M3 10350.00 Included 0.00 0 0.00
223 Civil Works 100001720 995428 18 Supplying, filling and compacting CNS material as per specification under floors, foundations, roads, cable trenches, drains etc inlayers not exceeding 200 mm thickness M3 348.00 Included 0.00 0 0.00
224 Civil Works 100001721 995428 18 Supplying, filling and compacting stone boulders mixed with sand under foundations, roads, cable trenches, drains etc in layers notexceeding 250mm thickness including ramming, watering compacting M3 100.00 Included 0.00 0 0.00
225 Civil Works 100001210 995455 18 Erection of Lattice Structures (MS Steel), to be designed during detailed engineering, for towers, beams and equipment supportstructure including pack plates / packwashers and gusset plates excluding fasteners and foundation bolts MT 39.60 Included 0.00 0 0.00
226 Civil Works 100001209 995455 18 Erection of Lattice Structures (HT Steel), to be designed during detailed engineering, for towers, beams and equipment supportstructure including pack plates / packwashers and gusset plates excluding fasteners and foundation bolts. MT 40.60 Included 0.00 0 0.00
227 Civil Works 100001680 995455 18 Erection of fasteners ( nuts, bolts and washers ) including step bolts for lattice and pipe structures to be designed duringdetailed engineering MT 3.60 Included 0.00 0 0.00
228 Civil Works 100001681 995455 18 Erection of foundation bolts including nuts, checknut and washers for lattice and pipe structures to be designed during detailedengineering MT 3.60 Included 0.00 0 0.00
229 Civil Works 100001433 995435 18 Soil Investigation: As per technical specification including all laboratory and field tests, report and recommendations. LOT 1.00 Included 0.00 0 0.00
230 Civil Works 100003437 995454 18 Switchyard Panel Room - Civil Works. All civil works as per drawing and specifications complete, including - brickwork, finishing(external and internal), windows etc. However, excavation, PCC, RCC and reinforcement shall be paid separately as per BPS. M2 41.00 Included 0.00 0 0.00
Total Installation Charges 0.00 0 0
Total GST as confirmed by Bidder 0.00
Total Installation Charges 0.00
Total GST as confirmed by Bidder 0.00
* In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 3
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : ERECTION CHARGES) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Sector-29, Multipackage lum-sum 0.00%
Gurgaon (Haryana) - 122001
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! (a) Detailed Soil Investigation
#REF! #REF! #REF! #REF! #REF! (b) All kinds of soil except fissured rock & hard rock
#REF! #REF! #REF! #REF! #REF! (e) River Crossing Location
#REF! #REF! #REF! #REF! #REF! (f)
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Total Erection Price (A+B) #REF!
Place : Printed Name :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule-4
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Training Charges for Training to be imparted
Date : -- Printed Name :
Place : Designation :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 5
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST ON GOODS Excise Duty #REF! Excise Duty #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable. 0.00
2 TOTAL GST ON SERVICES Sales Tax 0.00 Sales Tax 0.00
Total GST on Installation Services (Schedule-3) and Training to be imparted in India (Schedule-4), if aplicable 0.00 #REF! 0 #REF! 0
GRAND TOTAL [1+2] 0.00 Grand Total after Discount #REF! Grand Total after MPD #REF!
Date : -- Printed Name :
Place : Designation :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 5
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
SUMMARY OF TAXES & DUTIES APPLICABLE ON GOODS
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST ON GOODS 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST ON SERVICES 0.00
Total GST on Installation Services (Schedule-3) and Training to be imparted in India (Schedule-4)
GRAND TOTAL [1+2] 0.00
Date : -- Printed Name :
Place : Designation :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 6
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, Insurance and other Incidental Services
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 Not Applicable
Training Charges
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 Not Applicable
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule - 6 After Discount
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, Insurance and other Incidental Services
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 Not Applicable
Training Charges
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 Not Applicable
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule 7
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Sector-29, Multipackage Discount 0.0000%
Gurgaon (Haryana) - 122001
Type tests on Earthwire, Hardwar Fittings & accessories of conductor & earthwire:
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Spec. No.: TBCB/400kV/Gadag/SS01/G3
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC 0 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0 0
Bidder’s Name and Address (Sole Bidder) : 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Spec. No.: TBCB/400kV/Gadag/SS01/G3
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Sector-29, Multipackage Discount 0.0000%
Gurgaon (Haryana) - 122001
Type Tests on Earthwire
SL. NO. Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
Sub-Total (I) 0.00
TOTAL TEST CHARGES (I) 0.00
Discount Sche-7 #REF! MPD Sche-7 #REF!
Dis Alert #REF!
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Spec. No.: TBCB/400kV/Gadag/SS01/G3
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC 0 0 0
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) 0 0 0
Bidder’s Name and Address (Sole Bidder) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Schedule 7
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Sector-29, Multipackage Discount 0.0000%
Gurgaon (Haryana) - 122001
Type tests for Wangtoo Substation
SL. NO. HSN Code Whether HSN in column ‘2’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) 0 Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
TOTAL TYPE TEST CHARGES 0.00
Discount Sche-7 #REF! MPD Sche-7 #REF!
Dis Alert #REF!
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Spec. No.: TBCB/400kV/Gadag/SS01/G3
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC 0 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0 0
Bidder’s Name and Address (Sole Bidder) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
This letter of discount is optional. Bidder may / may not offer any discount.
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Letter of Discount
LETTER OF DISCOUNT
Contract Services
Power Grid Corporation of India Ltd.,
"Saudamini", Plot No.-2
Sector-29, (near IFFCO Chowk)
Gurgaon (Haryana) - 122001
Subject : Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Eq Weightage of Rs/ % Final Discount Factor
1 Discount on lum-sum basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1, Sch-2 & Sch-3] In Rs. 0.00 0.0000000000%
2 Discount on percent basis on total price quoted by us without Taxes & Duties. [The discount shall be applicable on all the items of all the Schdules i.e. Sch-1, Sch-2 & Sch-3] In Percent (%) 0.00 0.00%
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00 0.0000000000% Schedule-1 : Ex-Works Price 0.0000000000%
Schedule-2 : Freight & Insurance In Rs. 0.00 0.0000000000% Schedule-2 : Freight & Insurance 0.0000000000%
Schedule-3 : Installation Charges In Rs. 0.00 0.0000000000% Schedule-3 : Erection Charges 0.0000000000%
Schedule-4 : Training Charges In Rs. 0.00 0.0000000000% Schedule-4 : Training Charges 0.0000000000%
Schedule-7 : Type Test Charges In Rs. Schedule-7 : Type Test Charges 0.0000000000%
4 Discount on percent basis on the Schedules as given below : [The discount shall be applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00 0.00%
Schedule-2 : Freight & Insurance In Percent (%) 0.00 0.00%
Schedule-3 : Installation Charges In Percent (%) 0.00 0.00%
Schedule-4 : Training Charges In Percent (%) 0.00 0.00%
Schedule-7 : Type Test Charges In Percent (%) 0.00%
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation.
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : -- Printed Name :
Place : Designation :
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
Spec. No.: TBCB/400kV/Gadag/SS01/G3 Bid Form 2nd Envelope Sole Bidder 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : -- 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
Contracts Services, 3rd Floor 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 th 10 October
"Saudamini", Plot No.-2 11 th 11 November
Sector-29, 12 th 12 December
Gurgaon (Haryana) - 122001 13 th
Name of Contract : Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC 15 th
Dear Ladies and/or Gentlemen, 16 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 3 Installation Charges. Sole Bidder 23 th
Schedule 4 Training charges for training to be imparted. 24 th
Schedule 5 Taxes and Duties not included in Schedule 1 25 th
Schedule 6 Grand Summary [Schedule 1to 5] 26 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : -- Printed Name :
Place : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY 0 0.00
B) CENTRAL SALES TAX 0 0.00
C) VAT #REF! 0.00
D) ENTRY TAX / OCTROI #REF! 0.00
F) TOTAL TAXES & DUTIES #REF! 0.00
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! 0.00
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
Excise Duty % as Excise Duty
#REF! VAT #REF! #REF!
#REF! Entry Tax/ Octroi #REF! #REF!
Others as Others
II) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 2% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated :
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0
b) Excise Duty, as applicable on (a) above at the rate : 10.00% Rs. 0
c) Amount on which Sales Tax is applicable 0.00 0
d) CST, as applicable on (a) + ED (b) above at the rate : 2.00% Rs. 0
e) VAT, as applicable on (a) + ED (b) above at the rate : 1.00% 0
g) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. 0
h) Entry Tax, as applicable on (e) above at the rate : Rs. 0.00
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC Statement of Quoted / Corrected Prices Page
Spec. No. Spec. No.: TBCB/400kV/Gadag/SS01/G3
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY #REF! 0.00
B) CENTRAL SALES TAX /VAT #REF! #REF!
C) ENTRY TAX / OCTROI #REF! #REF!
D) OTHERS #REF! 0.00
E) TOTAL TAXES & DUTIES #REF! #REF!
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! #REF!
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] Not Applicable Not Applicable
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
a) Excise Duty Rs. #REF!
b) CST /VAT Rs. #REF!
c) Entry Tax / Octroi Rs. #REF!
d) Others Rs. #REF!
II) Bidder has offered following discount(s)
III) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 1% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated : Details of dicounts
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0 Gross LS #REF! #REF! #REF! Gross % #REF! #REF! #REF!
b) Excise Duty @ 10.3% of (a) above Rs. 0 #REF! #REF!
c) CST / VAT @ 2% of Ex-Works of Direct Supplies (a) + ED (b) above Rs. #REF! Sch-1 Direct LS #REF! #REF! #REF! Sch-1 Direct % #REF! #REF! #REF!
d) Others Rs. Sch-1 BO LS #REF! #REF! #REF! Sch-1 BO % #REF! #REF! #REF!
e) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. #REF! Sch-2 LS #REF! #REF! #REF! Sch-2 % #REF! #REF! #REF!
f) Entry Tax @ 1% of (e) above Rs. #REF! Sch-3 LS #REF! #REF! #REF! Sch-3 % #REF! #REF! #REF!
Sch-7 LS #REF! #REF! #REF! Sch-7 % #REF! #REF! #REF!
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC Statement of Quoted / Corrected Prices Page Different Manner #REF!
Text for Discount #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Name of Package Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Package No : SS01
Specification No. : TBCB/400kV/Gadag/SS01/G3
Completion Period 15 Months
General guidelines for filling up the Attachments : Substation Package -SS01 :
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Specification No.: TBCB/400kV/Gadag/SS01/G3
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 4, 4(A), 4(B), 5, 6, 7, 9, 10, 11, 12, 13, 15, 16, 17,18, 19 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as perproforma provided in the bidding document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 3 Bidder’s Eligibility: A separate sheet is enclosed in volume-III.
6 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
7 Attachment 14 Integrity Pact : To be submitted as per ITB Clause No. 9.3(n) and as per remarks in the Attach 14-IP.
8 Attachment 19: Declaration
9 Format for Attachment 20 to 23 and 25 to 28 are attached in Vol-III of the Bidding Documents.
10 Format for Attachment 24 is available in Section-VI, Vol.-I of the Bidding Documents.
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Specification No. :TBCB/400kV/Gadag/SS01/G3 Sole Bidder 1
JV (Joint Venture) 2 or More
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] Sole Bidder 0
Name of Sole Bidder
Address of Sole Bidder
Name of other Partner - 2 (More, if any)
Address of other Partner - 2 (More, if any)
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No] No
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-3(JV) SS01 Sole Bidder SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
This Attachment is Not Applicable
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 15
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-3(QR) SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Qualifying Requirement Data)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
For our Qualifying Requirements Data, please refer Attachment-QR of this volume.
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-4 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby certify that equipment and materials to be supplied are produced in [Enter the name of country where from equipments & material shall be supplied] eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Enter the name of country where from equipments & material shall be supplied] eligible source country.
Date : Printed Name :
Place : Designation :
country. country. [Enter the name of country where from equipments & material shall be supplied] [Enter the name of country where from equipments & material shall be supplied]
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-4(A) SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-4(B) SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-5 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of the items/ sub-assemblies of supply or services i.e. items, whose price is more than 10% of the Bid Price, we propose to buy for the purpose of furnishing and installation of the subject Package:
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
We hereby declare that, we would not subcontract the erection portion of the contract without the prior approval of Employer.
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Annexure I to Attachment-5 SS01
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Annexure I to Attachment-5 SS01
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Details of the proposed sub-contractor/sub-vendor Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-5(A) SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package:
S.No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name & Address Category
2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract. .
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-6 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Annexure I toAttachment-6 SS01
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-7 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Details of Alternative Bid)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
No Alternative Bid
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-9 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Work Completion Schedule)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of Contract
1 Detailed Engineering and drawing submission
a) commencement
2 Procurement of equipment/ components & assembly
a) commencement
a) commencement
4 Manufacturing
a) commencement
5 Shipments & Delivery
a) commencement
6 Establishment of site office
7 Installation at Site
a) commencement
8 Testing & Pre-commissioning
a) commencement
9 Trial Operation
a) commencement
Date : Printed Name :
Place : Designation :
Note : Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Specification No. :TBCB/400kV/Gadag/SS01/G3 ATTACHMENT-10
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Guarantee Declaration)
Bidders's Name and Address To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We confirm that the equipment offered shall have minimum (or a maximum, as the case may be) performance specified in the Technical Specification. We further guarantee the performance/effiency of the equipments in response to the Technical Specification.
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-10 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Guarantee Declaration)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that the equipments offered shall have minimum performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-11 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly, we hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-12 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Price Adjustment Data)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the relevant details pertaining to the price adjustment provisions for equipment as specified in your specifications and documents for the Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPCThe necessary documentary evidence are enclosed :
Sl. No. Name of Materials Value of co-efficient Name of the published index Value of index
WE HAVE QUOTED OUR BID PRICE ON FIRM PRICE BASIS.
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-13 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Declaration regarding Social Accountability)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-14 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Integrity Pact is annexed herewith this Volume.
Date : Printed Name :
Place : Designation :
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 1 of 8
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC Package and Specification Number TBCB/400kV/Gadag/SS01/G3 POWERGRID values full compliance with all relevant laws and regulations, and the principles of economical use of resources, and of fairness and transparency in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity, fairness and reason. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personal interest in the Companies/Agencies participating in the Bidding/Tendering process and all known prejudiced persons.
(2) If POWERGRID obtains information on the conduct of any of its employee which is a criminal offence under the IPC / PC Act , or if there be a substantive suspicion in this regard, POWERGRID will inform its Chief Vigilance Officer and in addition disciplinary actions can be initiated under POWERGRID’s Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. The Bidder/Contractor commits itself to observe the following principles
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 2 of 8
during his participation in the tender process and during the contract execution :
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which it is not legally entitled to, in order to obtain in exchange an advantage of any kind whatsoever during the tender process or during the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal or undisclosed agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor shall not pass any information provided by POWERGRID as part of business relationship to others and shall not commit any offence under PC / IPC Act.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/information in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
g) The Bidder/Contractor shall ensure adoption of Integrity Pact by its Sub-contractors and shall be responsible for the same.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may, after following due procedures, ban /blacklist the Bidder/Contractor in line with POWERGRID’s policy for “Black-Listing of Firms / Banning of Business”. The imposition and duration of the ban will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The ban will be imposed for a maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the ban prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID is entitled for forfeiture of the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III or if POWERGRID is entitled to terminate the contract under Section III, POWERGRID shall be entitled to forfeit the Contract Performance Guarantee of this contract, in full or part thereof as may be decided, besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall disclose in its Bid any transgressions occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country, that may impinge on the Anti-corruption principle.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, it can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason and further action can be taken in line with POWERGRID’s policies.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India. The names of the IEMs have been indicated in the Bidding Documents.
(2) The panel of IEMs shall review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. The panel of IEMs has right of access to all project documentation. The panel of IEMs may examine any complaint received by them and submit a report to Chairman-cum-Managing Director, POWERGRID, giving joint findings, at the earliest. The panel of IEMs may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 5 of 8
(3) TThe IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He / She reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his / her request and demonstration of a valid interest, unrestricted and unconditional access to their documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEMs information as sought by him / her which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract. The IEMs shall also sign declaration on ’Non-Disclosure of Confidential Information’ and of ‘Absence of Conflict of Interest’. In case of any conflict of interest arising at a later date, the IEM shall inform Chairman-cum-Managing Director, POWERGRID and recuse himself/herself from that case.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he / she will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under PC / IPC Act, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 6 of 8
(9) While representing any matter in relation to the Integrity pact inter-alia including its transgression to the panel of IEMs, POWERGRID and Bidder/Contractor shall not approach the court of law and await the decision of the IEM in the matter..
(10) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements have not been made.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Issues like Warranty/Guarantees etc. shall be outside the purview of IEMs.
(6) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 7 of 8
(7) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
Integrity Pact Page 8 of 8
Specification No.: TBCB/400kV/Gadag/SS01/G3 Attachment-15 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Option for Advance and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
Bidder’s Name and Address (Sole Bidder) : Contract Services
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 "Saudamini", Plot No. 2, Sector 29 YES
Gurgaon (Haryana) - 122001 NO
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Initial Advance
Supply Portion :
Engineering Advance (Interest Bearing):
Services Portion:
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made 0
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3.(a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3.(b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement poliy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) Note: Documentary evidenec is to be attached. Please refer remarks at the end of the attachment.
3.(c) If 3.(b) is 'Yes' please mention whether you are (Proprietary MSE/Partnership MSE/Private Limited Company) owned by SC/ST entrepreneurs.
3.(d) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No) Note: Documentary evidence is to be attached. NO
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
(i) Madhya Pradesh
10. PF Regional Office covered (with Address)
11. Name of Contact Person
12. Contact Details
13. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
14. 9 digit MICR code printed at bottom in middle, next to cheque no.
15. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
* The definition of MSEs owned by SC/ST is as given under:
(a) In case of Proprietary MSE, Proprietor(s) shall be SC/ST.
(b) In case of partnership MSE, then SC/ST partners shall be holding at least 51% shares in the unit.
(c) In case of Private Limited companies, at least 51% shares shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-16 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Additional Information)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the additional information required as per ITB Sub-Clause 9.3 (q) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(q)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder (Sole Bidder)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 q, Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
2.1 The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(q)(ii)]
Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years:
Year Name of client Details of Transgression of Integrity Pact by the bidder
5.0 OTHER INFORMATION
5.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Place : Printed Name :
Specification No. :TBCB/400kV/Gadag/SS01/G3
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Additional Information)
Name(s) and Addresse(s) of other partner(s)
Name : Contract Services
Address : Power Grid Corporation of India Ltd.,
"Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
The Bidder shall furnish
1.1 A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
(i) The Bidder should accordingly also provide the following information/documents
Details of Banker:
Address of Banker
Contact Name and Title
As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
Litigation History
2.1 The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.1 OTHER INFORMATION
Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Place : Printed Name :
Specification No. :TBCB/400kV/Gadag/SS01/G3
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Additional Information)
Name(s) and Addresse(s) of other partner(s)
Name : Contract Services
Address : Power Grid Corporation of India Ltd.,
"Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference): Reference ITB clause 9.3(p)(ii)
The Bidder shall furnish
1.1 A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3 (p)(i)]
In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
(i) The Bidder should accordingly also provide the following information/documents
Details of Banker:
Name of Banker `
Address of Banker
Contact Name and Title
As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
Litigation History
2.1 The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid.
Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.1 OTHER INFORMATION
Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Place : Printed Name :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-17 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-17 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-17 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-18 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Safety Pact is annexed herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :TBCB/400kV/Gadag/SS01/G3 Attachment-19 SS01
Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : Printed Name :
Place : Designation :
Specification No TBCB/400kV/Gadag/SS01/G3 Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contract Services 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
"Saudamini", Plot No. 2, Sector 29 11 eleven 11 th 11 November
Gurgaon (Haryana) - 122001 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Substation Package SS01 for a. Extension of 400/220kV, Gadag Pooling S/s b. Extension of 400kV Koppal PS associated with “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II” through tariff based competitive bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Enter details here. Date Month Year Pay Order 19 nineteen 19 th
OR Online Payment acknowledgement towards Bid Security for a sum of Rs
OR documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 13.1 of ITB, Section-II
(b) Attachment 2(SS01) : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee 21 st
(c) Attachment 3(SS01) : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). Sole Bidder 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). 0 0 Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. Not Applicable 24 th
(d) Attachment 4(SS01) : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5(SS01) : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A(SS01) : (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works.
(g) Attachment 6(SS01) : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 27 th
(h) Attachment 7(SS01) : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 28 th
(i) Attachment 8(SS01) : Manufacturer’s Authorisation Forms. 29 th
(j) Attachment 9(SS01) : Work Completion Schedule. 30 th
(k) Attachment 10(SS01) : Guarantee Declaration. 31 st
(l) Attachment 11(SS01) : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12(SS01) : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13(SS01) : Declaration regarding Social Accountability.
(o) Attachment 14(SS01) : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15(SS01) : Option for Initial Advance and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16(SS01) : Additional Information.
(r) Attachment 17(SS01) : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18(SS01) : Safety Pact
(t) Attachment 19(SS01) : Declaration
(u) Attachment 20(SS01) : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21(SS01) : Authorization certificate issued by Domestic Manufacturer for selling Domestically Manufactured Iron & Steel Products
(w) Attachment 22(SS01) : Affidavit of Self certification regarding Domestic Value Addition in Iron & Steel Products
(x) Attachment 23(SS01) : Affidavit.
(y) Attachment 24(SS01) : Confirmation regarding furnishing Declaration regarding Non-Participation as a Bidding Company or as a member of any Bidding Consortium in Transmission Project under Tariff Based Competitive Bidding Route
(z) Attachment 25(SS01) : Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.1
(aa) Attachment 26(SS01) : Certification by the Bidder as per DoE Order in line with ITB Clause 2.1(In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture)
(bb) Attachment 27(SS01) : Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order, if applicable
(cc) Attachment 28(SS01) : Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
3.0 A * (applicable for MSE only) We are a Micro and Small Enterprise (MSE) registered with................, a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01/06/2020, 26/06/2020 and 19/01/2022 read in conjunction with related notifications issued from time to time for such enterprises. (Delete if not applicable)
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) GCC 2.14 Governing Law
(b) GCC 5.1 Contractor’s Responsibilities
(c) GCC 8 Terms of Payment
(d) GCC 9.3 Performance Security
(e) GCC 10 Taxes and Duties
(f) GCC 21.2 Completion Time Guarantee
(g) GCC 22 Defect Liability
(h) GCC 23 Functional Guarantee
(i) GCC 25 Patent Indemnity
(j) GCC 26 Limitation of Liability
(k) GCC 38 Settlement of Disputes
(l) GCC 39 Arbitration
(m) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We have noted the provisions of the Bidding Documents that POWERGRID intends to participate in the selection of Transmission Service Provider (TSP) for the "Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part-A Phase-II’’. For this purpose, the bids have been invited by POWERGRID for the subject Package covering certain scope of work under the aforesaid TBCB Project. The qualified, lowest evaluated Bidder having requisite capacity and capability to perform the contract for the aforesaid Package(s) as per the provisions of the Bidding Documents shall be pre-selected, for the scope of work contained in the Bidding Documents, for associating with POWERGRID for the purpose of tariff bidding by POWERGRID in the RfP process of the BPC for the subject Project under TBCB route and, in case POWERGRID becomes successful Bidder, the successful Bidder for aforesaid mentioned Package(s) will be awarded the Contract for execution of scope of work contained in the Bidding Documents. An MOU shall be signed with the pre-selected Bidder prior to tariff bid submission by POWERGRID to BPC against its RfP process. This MOU shall, inter-alia, bind both POWERGRID and the pre-selected Bidder for associating on exclusive basis and maintaining strict confidentiality by the pre-selected Bidder of the prices, terms and conditions.
7.1 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of Six (06) months from the deadline of bid submission as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and address of agent Amount and Currency Purpose of Commission or gratuity
(If none, state “none”)
13.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1 Other Partner -2
Printed Name : Printed Name :
Designation : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(SS01) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(SS01) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
10-Attachment-26- Certification by the Bidder per DoE Order in line with ITB Clause 2-1.docx
docx • 0.02 MB
11-Attachment-27-Affidavit for self-Certification.DOCX
docx • 0.02 MB
12-Attachment-28-Certificate by Auditor.docx
docx • 0.02 MB
13-Second Envelope - Bid Form and Price Schedule.xlsx
xlsx • 1.93 MB
1-First Envelope - Bid Form and Attachments_SS01.xlsx
xlsx • 1.34 MB
2_Attachment-3 (QR).doc
doc • 0.06 MB
3-Attachment-8-Manufacturer Authorisation Form.doc
doc • 0.03 MB
4-Attachment-18-SAFETY PACT.docx
docx • 0.03 MB
5- Attachment 20-Declaration of KMP and PoA holder.doc
doc • 0.04 MB
6-Attachment-21-Authorization Certificate issued by Domestic Manufacturer.docx
docx • 0.02 MB
7-Attachment-22-Affidavit for Self Certifictaion-Iron & Steel.docx
docx • 0.02 MB
8-Attachment - 23-Affidavit.docx
docx • 0.02 MB
9-Attachment-25_Declaration regarding events encountered pursuant to ITB Clause 2-1.docx
docx • 0.03 MB
GTR Rev 15.pdf
pdf • 7.12 MB
Lighting Specification Rev.07.pdf
pdf • 4.29 MB
Section_Switchyard Erection_Rev.10.pdf
pdf • 5.99 MB
Section-Switchgear-CB_Rev11.pdf
pdf • 0.61 MB
Section-Switchgear-INST_rev11.pdf
pdf • 1.00 MB
Section-Switchgear-ISO_Rev11B.pdf
pdf • 0.11 MB
Section-Switchgear-SA_Rev12.pdf
pdf • 0.34 MB
Air conditioning R4.pdf
pdf • 0.04 MB
Civil Works Rev 11A_With Correction Slip.pdf
pdf • 4.56 MB
CRP Rev 09.pdf
pdf • 0.37 MB
Fire Protection Rev 6.pdf
pdf • 1.97 MB
PLCC R5.pdf
pdf • 0.06 MB
Power & Control Cable Rev R6.pdf
pdf • 0.26 MB
Section PMU Rev 0.pdf
pdf • 0.59 MB
Section-Sub-station Automation_Rev04.pdf
pdf • 0.98 MB
Section-Sub-station Automation_STANDARD FACTORY SIMULATION TEST PLAN.pdf
pdf • 0.54 MB
Section Structure Rev 6.pdf
pdf • 0.10 MB
Section Telecommunication Systems Rev 02.pdf
pdf • 1.78 MB
Annexure II_Specific Requirement Rev 06.pdf
pdf • 7.03 MB
Annexure IV_Methodology for Supply, Installation and Sizing of Cable.pdf
pdf • 0.14 MB
Annexure-I List of Drawings.pdf
pdf • 0.54 MB
Annexure-III Breakup of Mandatory Spare.pdf
pdf • 0.37 MB
Annexure-V_Clause no. 24.1 Section GTR Rev 15.pdf
pdf • 0.68 MB
Annexure-VI_Short circuit forces and spacer span for 765kV & 400kV Gantry Structure.pdf
pdf • 0.29 MB
Section Project_Rev_0.pdf
pdf • 0.87 MB
Barbed Wire Fencing R01.pdf
pdf • 0.11 MB
Details of bituminous road.pdf
pdf • 0.44 MB
Details of cable trench and cable trench road crossings.pdf
pdf • 0.63 MB
Details of drain.pdf
pdf • 2.24 MB
Road Culverts.pdf
pdf • 1.50 MB
Switchyard Panel Room_6M.pdf
pdf • 1.62 MB
Switchyard Panel Room_9M.pdf
pdf • 1.62 MB
Typical module.pdf
pdf • 0.14 MB
01- Section - I_IFB.doc
doc • 0.08 MB
02-Section - II ITB SSTE S&I Rev 5-DCB-Mjn.pdf
pdf • 1.95 MB
03-Section - III_BDS.docx
docx • 0.07 MB
04-Annexure-A (BDS)-SS01.doc
doc • 0.07 MB
05 - Section - IV GCC.pdf
pdf • 1.93 MB
06-Section - V_SCC-AIS.doc
doc • 0.15 MB
07-Appendix -I to SCC.doc
doc • 0.39 MB
08-Sample Forms and Procedures-AIS.doc
doc • 0.54 MB
OBD_EXTN_LETTER.docx
docx • 0.15 MB
OBD_EXTN_LETTER.docx
docx • 0.16 MB
Letter to the Bidders.docx
docx • 0.15 MB
Letter to the Bidders.docx
docx • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .