Loading…
Loading…
Tender Value
₹15.2 L
EMD Value
₹30,420
Closing Date
8 Aug 2026, 4:00 pm
Executive Engineer, ED-3rd Srinagar
Office of Executive Engineer, ED-3rd Srinagar
Creation of 200 kVA Substation for Providing of Electricity facility at Jammu University Campus at Rakhi Aarth falling under the jurisdiction of ESD Watalkadal ED 3rd (Turnkey Basis)
2026_PDD_317040_1
ED-III /08 of 2026-27, Dated - 21-07-2026
Open Tender
Electrical Works
Turn-key
20 days
Office of Executive Engineer, ED-3rd Srinagar
Refer SBD, Technical Specification, Drawings
7 documents required · 7 mandatory
₹1,000
Executive Engineer, ED-3rd Srinagar
₹30,420
Yes
21 Jul 2026
21 Jul 2026
10 Aug 2026
21 Jul 2026
8 Aug 2026
25 Jul 2026
25 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub-Station, HT Network, LT Network | |||||
| 0.00_ | Supply, Installation, Testing and commissiong of 200 kVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminum wound, and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. ( X-mer without OCTC (Off Ckt Tap Changer)) including integration with system by way of providing Clamps/Jumpers/necessary items required for commissioning. | 1 | No. | 4,04,134.32 | ₹4,04,134.32 |
| 0.00_ | Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9 kV, 10 kA, Lighting Arrestor Set Heavy duty with Plymer Housing, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V) | 1 | Set | 8,538.73 | ₹8,538.73 |
| 0.00_ | Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) | 1 | Set | 12,322.45 | ₹12,322.45 |
| 0.00_ | Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS. | 1 | Set | 5,897.38 | ₹5,897.38 |
| 0.00_ | Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm with F-Top
1. L.A Set/G.O Set/Horn Gap/Transformer Pad = 300 kg
2. HT Network - 69 kg | 369 | kg | 164.95 | ₹60,866.55 |
| 0.00_ | Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. | 5 | No. | 18,797.69 | ₹93,988.45 |
| 0.00_ | Supply, installation, testing and commissioning of 300 mm² Cable, 1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type including lugs/clamps/thimbles. | 44 | Mtrs | 769.41 | ₹33,854.04 |
| 0.00_ | Supply, Laying, stringing, testing and commissioning of 30 mm² ACSR Conductor | 300 | Mtr | 42.56 | ₹12,768 |
| 0.00_ | Supply, Laying, stringing, testing and commissioning of 50 mm² ACSR Conductor | 1,200 | Mtr | 74.15 | ₹88,980 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
SBD08.pdf
Tender Documents • 0.86 MB
Combineapprovedkpdcl.pdf
Other Document • 28.39 MB
DTspecifications.pdf
Other Document • 0.70 MB
BOQ_1036945.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].