Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | ALPINE SYSTEMS PRIVATE LIMITED | 1 | ₹58.8 L |
| 2 | Schedule 2 | ALPINE SYSTEMS PRIVATE LIMITED | 1 | ₹2.9 Cr |
| 3 | Schedule 3 | ALPINE SYSTEMS PRIVATE LIMITED | 1 | ₹47.2 L |
| 4 | Schedule 4 | BIT MAPPER INTEGRATION TECHNOLOGIES PRIVATE LIMITED | 1 | ₹5.9 Cr |
| 5 | Schedule 5 | ALPINE SYSTEMS PRIVATE LIMITED | 1 | ₹9.4 L |
Tender Value
₹15.9 Cr
EMD Value
Exempted
Closing Date
17 Feb 2022, 10:00 amClosed
7441121503 OLED BOARD FOR CTI T-90 (BEL PART NO. 170314213110) (Q3)
7441121504 POWER SUPPLY & CONTROL BOARD (BEL PART NO. 170300216495) (Q3)
7441121505 REGIFLEX PCB FOR CTI T-90 (BEL PART NO. 170000367476) (Q3)
7441121506 VIDEO PROCESSING ELECTRONICS (BEL PART NO. 170312108210) (Q3)
7441121737 HEATER PCB FOR TANK T-90 AS PER BEL PART NO. 170300603040 (Q3)
7441121738 FILTER BOARD ASSEMBLY FOR TANK T-90 AS PER BEL PART NO. 170300602264 (Q3)
3089299
GEM/2022/B/1895679
7441121503 OLED BOARD FOR CTI T-90 (BEL PART NO. 170314213110),7441121504 POWER SUPPLY & CONTROL BO
180 days
Andaman And Nicobar Islands; Dehradun, Uttarakhand; Pauri Garhwal
Item wise evaluation
PRODUCT_CUSTOM
3 documents required · 3 mandatory
| Item | Delivery Location | Qty | Delivery | Spec |
|---|---|---|---|---|
| 7441121503 OLED BOARD FOR CTI T-90 (BEL PART NO. 170314213110) (Q3) | DEHRADUN PPLY & CO NTR OL BO AR D (BEL | 166 | 180 days | |
| 7441121504 POWER SUPPLY & CONTROL BOARD (BEL PART NO. 170300216495) (Q3) | DEHRADUNFOR CTIT-90 (BELPARTN | 166 | 180 days | |
| 7441121505 REGIFLEX PCB FOR CTI T-90 (BEL PART NO. 170000367476) (Q3) | DEHRADUN CESSIN GELECTRON ICS (BEL | 160 | 180 days | |
| 7441121506 VIDEO PROCESSING ELECTRONICS (BEL PART NO. 170312108210) (Q3) | DEHRADUNFO RTA NK T-90 AS PER BEL | 166 | 180 days | |
| 7441121737 HEATER PCB FOR TANK T-90 AS PER BEL PART NO. 170300603040 (Q3) | DEHRADUNRD ASSEM BLY FO RTA NK T-90 | 160 | 180 days | |
| 7441121738 FILTER BOARD ASSEMBLY FOR TANK T-90 AS PER BEL PART NO. 170300602264 (Q3) | DEHRADUN | 165 | 180 days |
Exempted
17 Feb 2022
27 Jan 2022
17 Feb 2022
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3089299.pdf
GEM_BID
sheet_685_2022-01-25-17-14-24_a2096e9784e90c1d325f2ce23f474d10.pdf
SPECIFICATION
oled-spec_2022-01-25-17-14-24_2d7c9c97212dc92b8e2905eeb22821ce.pdf
SPECIFICATION
power-supply-control-board_2022-01-25-17-19-50_a72fae067aa662d252fd0bad939fd4a3.pdf
SPECIFICATION
sheet_685_2022-01-25-17-26-09_8046aa4b84f1612bbafcd8dad18eb895.pdf
SPECIFICATION
video-processing-electronics_2022-01-25-17-31-47_1eb663e0cccbae814b58dcc6552ab6f3.pdf
SPECIFICATION
sheet_685_2022-01-25-17-35-47_1b7c23e2530b41cb15b2318e59cd9f92.pdf
SPECIFICATION
filter-board-schematic_2022-01-25-17-40-07_2e9d87220e87afd975640f4ffb0e3789.pdf
SPECIFICATION
sheet_685_2022-01-25-17-19-50_f7617162b093fccf518a03c6ca8d25e0.pdf
OTHER
flex-cable-bom_2022-01-25-17-26-09_fc8115df74f0f0194cec2a3640211bdb.pdf
OTHER
flex-cable-schematic_2022-01-25-17-26-09_de0f761798d4df92e674a922fd5bbe9d.pdf
OTHER
sheet_685_2022-01-25-17-31-45_e56c318ff31e2c6f6dfe161fbec11dfc.pdf
OTHER
heater_circuit_2022-01-25-17-35-47_fc387efb0cb52507f65222641bb41aac.pdf
OTHER
filter-board-bom_2022-01-25-17-40-07_4a037161d1a11d876f2a02d530910296.pdf
OTHER
sheet_685_2022-01-25-17-40-24_b00cac36aa4a0720d2506d2329b963a4.pdf
OTHER
TERM_6789decc-8e74-46ab-939b-3715b06bcafb_olfmmdaga.docx
OTHER
termsCondition.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .